SATPC0040627 Tab 04 4 SOW.pdf
PDF 157 KB Posted
- Attached to
- Fuel Quantity Processing Unit, P/N 0335KPU03 with software version 2869-ONT-000-06 or newer installed Federal contract opportunity
- Solicitation number
- 80NSSC26928062Q
About this file
This is a Statement of Work for procurement of aircraft components to comply with a Boeing airworthiness directive. NASA Langley Research Center (LaRC) requires one Fuel Quantity Processing Unit (FQPU), part number 0335KPU03, with software version 2869-ONT-000-06 or newer installed. Alternative FQPU part numbers 0335KPU01 or 0335KPU02 may be considered as acceptable substitutes. The part must be delivered with FAA Form 8130-3 certification.
The contractor is responsible only for procuring and delivering the part; installation will be performed by NASA LaRC's Research Services Directorate. The required delivery timeline is no later than six weeks after contract award. No place of performance is applicable as this is a parts procurement only contract.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0040627 Tab 10 RFQ Open Market Template.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements To comply with Boeing AD 2022-23-11 on the NASA LaRC Boeing 777 aircraft, one (1) Fuel Quantity Processing Unit, P/N 0335KPU03 with software version 2869-ONT-000-06 or newer installed.
2. Characteristics, Scope, and Specs
The vendor shall provide the following parts/description:
a. One (1) Fuel Quantity Processing Unit, P/N 0335KPU03 with software version 2869- ONT-000-06 or newer installed. FQPU P/N 0335KPU01 or 0335KPU02 may also be considered. The part shall be delivered with FAA Form 8130-3.
3. Place of Performance Not applicable. Parts procurement only. Installation of parts will be performed at NASA LaRC by Research Services Directorate (RSD).
4. Period of Performance
Parts delivered no later than 6 weeks after contract award.