SATPC0040294 Tab 04 4 SOW..pdf
PDF 163 KB Posted
- Solicitation number
- 80NSSC26923915Q
About this file
This is a Statement of Work for engineering and commissioning services at NASA's Stennis Space Center. The procurement requires two primary deliverables: hardware provision consisting of a desktop workstation with Aveva Edge runtime license (quantity 2), and engineering activities including system drawing updates and HMI modifications to support unloading generators, opening generator breakers, setting system load setpoint, and stop commands to the Governor (Flex500). The second line item covers start-up and commissioning support including travel time and expenses, with specific tasks encompassing MSLCXT-2 installation, configuration, and testing in both A&B bus locations, HMI commissioning with the added features noted above, and remote HMI testing.
Performance is to be completed at NASA Shared Services Center, Stennis Space Center, Mississippi, within a period of 8-12 weeks after receipt of order (ARO). The scope of work emphasizes both technical implementation and on-site support to ensure proper installation and operational readiness of the systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SATPC0040294 Tab 06 RDSS..pdf | ||
| SATPC0040294 Tab 07 Capability Statement SAM.gov 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements
The information listed below is required to complete this purchase.
2. Characteristics, Scope, and Specs
LINE PART NO. DESCRIPTION QTY.
1 2915-7691 Hardware Provided:
-Desk Top workstation with Aveva Edge runtime license [qty. 2]
• Engineering Activities:
o System Drawing updates o Update HMI to provide support for:
1. Unloading Generators, opening Gen breakers.
2. Setting System Load Setpoint
3. 3. Stop Command to Governor (Flex500)
2 N/A Start-up and commissioning support including travel time and expenses. Commissioning includes:
1. MSLCXT-2 - Installation, configuration, and testing in both the A&B bus locations.
2. Commissioning HMI with added features listed above.
3. Testing Remote HMI
4. Place of Performance NASA Shared Services Center Stennis Space Center (SSC), MS
5. Period of Performance
8-12 weeks ARO
File details come from the government source that posted it. Updated .