SATPC0040214 TAB 04 4 SOW SAM.pdf

PDF 65 KB Posted

Attached to
delivery of the RockOn and RockSat student launch
Solicitation number
80NSSC26916531Q
Issued by

About this file

This Statement of Work (SOW) outlines support services for NASA Wallops Flight Facility's (WFF) RockOn and RockSat student launch opportunities from October 2025 to September 2026. The contractor will provide comprehensive technical and administrative support, including selecting 10-20 RockSat teams, conducting approximately 40-80 team reviews, managing documentation, and offering onsite technical assistance during workshops and integration phases.

Specific responsibilities include performing surface mount component installation for the RockOn flight computer, hiring 8 collegiate student helpers, providing technical support during June 2026 workshops for 20-24 teams, and supporting NASA Sounding Rocket Program Office documentation requirements. The majority of work will occur in Aurora, Colorado, with required travel to Wallops Flight Facility for workshops, integration, launch, and recovery. The contract has an expected 90% team completion rate for reviews and experiments, with detailed support across multiple review stages including Conceptual Design, Preliminary Design, Critical Design, and Full Mission Simulation Reviews.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements

The services to be performed will support the delivery of the RockOn and RockSat student launch opportunities conducted at Wallops Flight Facility (WFF) in collaboration with the NASA Sounding Rocket Program OƯice in OCT 2025 – SEP 2026.

2. Characteristics, Scope, and Specs

The contractor shall perform the following duties in the following areas:

A. Provide support for the NASA Wallops Flight Facility (WFF) student launch opportunity RockSat for undergraduate students which will include the following:

a. Support the selection of 10 to 20 RockSat teams based on their submission of a WFF Intent to Fly Form

b. Schedule and conduct required ~8 reviews per team for 5-10 of the possible 20 RockSat teams (~40 to 80 reviews total) and provide a summary and required actions (Conceptual Design Review, Preliminary Design Review, Critical Design Review, Subsystem Test Review, Integrated Systems Test Review, Full Mission Simulation Review, Visual Verification Check-in) with the expectation that 90% of the teams will complete the reviews and finalize their experiments

c. Review and edit documentation templates and procedures to be used by the teams as well as storage of team submissions, while holding weekly staƯ meetings with WFF support staƯ

d. Provide support for the 6-8 reviews and documentation required for NASA Sounding Rocket Program OƯice

e. Provide support onsite at WFF for RockSat integration and testing in May/June 2026

f. Provide feedback on RockSat team final reports

g. Travel support for item d

B. Provide support to NASA Wallops Flight Facility (WFF) for the RockOn student launch opportunity which will include the following:

a. Perform installation of all surface mount components on the flight computer for RockOn (~400 components)

b. Hire and pay 8 collegiate student helpers who will support the RockOn hands-on workshop

c. Provide onsite technical support at WFF during workshop instruction in June 2026 for the 20-24 teams with 3 to 4 students and faculty member for each RockOn team

d. Travel support for item g

3. Place of Performance

Majority of the work will take place in Aurora, Colorado. Travel to WFF is required for workshop, integration, launch, and recovery.

4. Period of Performance

Services provided from October 1, 2025 to September 30, 2026