SATPC0040163 Tab 04 4 SOW..pdf
PDF 204 KB Posted
- Attached to
- Synology Storage for HLS Federal contract opportunity
- Solicitation number
- 80NSSC26922305Q
About this file
This Statement of Work (SOW) details a hardware procurement for a network storage system to be delivered to a government facility in Greenbelt, Maryland. The purchase includes one NAS (Network Attached Storage) system with 60-bay rack-mount configuration, two expansion units, 168 enterprise hard disk drives (20TB), 12 solid-state drives (7TB), two dual-port network adapters, six RAM modules, one 5-year premium support service, and a cable management arm. The system components are from Synology and include 5-year warranties for most items. The delivery location is Building 33, Room B221 at 8800 Greenbelt Road, with a performance period of 30 days after receipt of order (ARO).
The SOW also includes two notable AI-related requirements effective September 2025: contractors must disclose any AI technologies used during contract performance and adhere to additional requirements when acquiring covered AI systems or services, as defined by OMB memo M-25-22. These AI verbiage clauses are mandated to be included in all contracts and orders, reflecting emerging federal guidance on artificial intelligence technology procurement and usage.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0040163 Tab 06 BNJ..pdf | ||
| SATPC0040163 Tab 10 RFQ Open Market Template.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements
The information listed below is required to complete this purchase.
2. Characteristics, Scope, and Specs
LINE PART NO. WARRAMTY
(YRS)
DESCRIPTION QTY.
1 HD6500 5 NAS, 60-Bay, 4U, Rackmount, Redundant Power, SAS 1 2 RX602sas 5 Expansion Unit, 60-Bay, 4U, Rackmount, Redundant Power, SAS
3 HAS5310-20T 5 Hard Disk Drive, 20TB, 3.5" SAS, Enterprise 168
4 SAT5210-
7000G 5 Solid State Drive, 7TB, SATA 12
5 E10G30-T2 5 PCIe Network Adapter, Dual-Port 10GbE RJ-45 2 6 D4ER01-32G 5 RAM Module, 32GB, DDR4 ECC Registered DIMM 6 7 PSSS-E NA Synology Premium Support Service, 5 Year 1 8 CMA-01 1 Synology Cable Management Arm 1
3. Place of Performance Bldg 33 Rm B221 8800 Greenbelt Rd Greenbelt, MD 20770
4. Period of Performance 30 days ARO
AI VERBIAGE:
1) Use of Artificial Intelligence (AI) During Contract Performance (SEP 2025) which requires contractors to disclose the use of AI technologies at any time during the fulfillment of the contract. This requirement statement must be included in all contracts (including orders); and
2) Artificial Intelligence (AI) Acquisitions (SEP 2025) which provides additional contractor requirements when the contract is acquiring covered AI systems or services as defined by OMB memo M-25-22. This requirement statement must be included in all contracts (including orders) when acquiring covered AI systems or services. Covered AI systems or services and exceptions are listed below as defined OMB memo M-25-22).
File details come from the government source that posted it. Updated .