This document appears to be a technical specification for two DC-DC converters, specifically a 5V and a +/-15V model, with detailed radiation hardness and electrical performance requirements. Both converters share identical specifications, including a total dose hardness of 50 Krads (Si) for high and low dose rates, Single Event Effect (SEE) resistance of ≥ 75 MeV cm2/mg, and an input voltage range of 50V or higher. The converters must provide output power greater than 5W, with the 5V model outputting 5Vdc and the +/-15V model outputting ±15Vdc. Additionally, both converters have a lead time requirement of less than 12 weeks, indicating a time-sensitive procurement need for potentially space or military-grade electronic components.

View the file

Other files for this federal contract opportunity

Other files attached to VPT Isolated Power Supplies, newest first.
File Type Posted
SATPC0039852 Tab 07 Capability Statement Commercial.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5V DC-DC Converter

• Total dose hardness 50 Krads (Si) or higher for both high (50-300rad(Si)/s) and low dose rate (0.01rad(Si)/s)

• SEE >= 75 MeV cm2/mg

• Input voltage range equal to or higher than 50V with de-rating or without de-rating if de-rating is already completed internal to the design

• Output voltage is 5Vdc

• Output power is greater than 5W

• Lead time is less than 12 weeks

+/-15V DC-DC Converter

• Total dose hardness 50 Krads (Si) or higher for both high (50-300rad(Si)/s) and low dose rate (0.01rad(Si)/s)

• SEE >= 75 MeV cm2/mg

• Input voltage range equal to or higher than 50V with de-rating or without de-rating if de-rating is already completed internal to the design

• Output voltage is +/-15Vdc

• Output power is greater than 5W

• Lead time is less than 12 weeks