SATPC0039752 Tab 04 4 SOW_Redacted.pdf
PDF 186 KB Posted
- Attached to
- Procurement of DAQ Shock System Federal contract opportunity
- Solicitation number
- 80NSSC25915069Q
About this file
This Statement of Work (SOW) details NASA Johnson Space Center's requirements for Non Explosive Actuators and Frangibotts. The document outlines procurement of seven line items including NEA Model 9040 and various TINI Frangibolt FC4 and FC6 models, with quantities ranging from 1 to 10 units per line item. Delivery schedules are set at 20-30 weeks after receipt of order (ARO), with all items to be shipped to NASA's Lyndon B. Johnson Space Center in Houston, TX.
Key contract requirements include providing a Certificate of Compliance with each shipment, which must attest to parts conforming to order requirements and include details such as customer order number, product name, part number, manufacturing location, lot/date codes, and quantity. The contractor must comply with all federal, state, and local safety codes, package items according to applicable regulations, and include full delivery costs in their quotation. NASA estimates the total period of performance for deliverables will be 30 weeks from order receipt.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0039752 Tab 07 Capability Statement FBO Posting.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
• Name and address of manufacturing or processing location
• Manufacturer’s lot, date code
• Quantity and unit of measurement (each, box, case, gallons, etc.)
• Be signed and dated by an official of the company
3.0 Delivery
The vendor shall include in their quotation the cost of delivering (packaging materials, shipping costs etc) all parts to NASA/JSC as listed in this document. A DD-250 or DD-1149 is not required for delivery under this contract.
4.0 Period of Performance
NASA is estimating a period of performance for Section 1.0 deliverables of this document to be complete 30 weeks after receipt of order (ARO).
5.0 Safety Requirements
The Contractor shall comply with all Federal, State and Local codes and standards applicable to work performed on this contract.
6.0 Shipping, Preservation, and Packaging Requirements
The Contractor shall package and ship the items in accordance with applicable Federal, State and Local regulations.
The Contractor shall ship the items to:
NASA/ Lyndon B. Johnson Space Center
2101 NASA Parkway
Houston, TX 77058
File details come from the government source that posted it. Updated .