SATPC0039430 Tab 04 4 SOW..pdf
PDF 240 KB Posted
- Attached to
- prototype textile development Federal contract opportunity
- Solicitation number
- 80NSSC25912039Q
About this file
This document is a Statement of Work (SOW) for Advanced Suit Materials (ASM) Custom Textile Development dated July 18, 2025. The SOW requires a textile vendor to develop, finish, and apply advanced coating to custom-woven Vectran-based fabrics specifically for lunar spacesuit applications. The project includes four key milestones: beam completion, plain weave trial, pattern weave trial, and a finishing trial involving calendaring and high-performance resin coating.
The Period of Performance (POP) is 6 months following Approved to Proceed (ATP), with milestones scheduled incrementally from ATP + 1 month. The project is associated with NASA's National Aeronautics and Space Administration Shared Services Center, with a solicitation number of 80NSSC25912039Q. The opportunity is characterized as a sole source requirement for prototype textile development, indicating a specific, targeted procurement process for specialized spacesuit material research and development.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0039430 Tab 07 Capability Statement SAM.gov.pdf | ||
| SATPC0039430 Tab 06 RDSS..pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
July 18, 2025
Advanced Suit Materials (ASM) Custom Textile Development
Textile Vendor SOW
Scope
The contractor shall develop, finish, and apply advanced coating to custom-woven Vectran-based fabrics intended for use in lunar spacesuit applications. This includes both plain and pattern weave trials as well as finishing techniques such as calendaring and application of a high-performance resin coating.
Period of Performance
The Period of Performance (POP) is 6 months after Approved to Proceed (ATP) and then schedule the milestones at ATP + 1 month, etc.e
Milestones
Milestone Description Milestone 1 Beam completion Milestone 2 Plain weave trial Milestone 3 Pattern weave trial Milestone 4 Finishing trial (calendaring
+ resin coating)