SATPC0039415 Tab 04 4 SOW_Redacted.pdf
PDF 60 KB Posted
- Attached to
- Sisense Renewal Federal contract opportunity
- Solicitation number
- 80NSSC25911972Q
About this file
This Statement of Work (SOW) details a renewal for Sisense Fusion Analytics (FA) software for the International Space Station (ISS) teams at Johnson Space Center. The procurement includes two production cores with 5 admin/designers and 10 viewers, one non-production core, an unlimited viewer license, and 15 additional admin/designer licenses. The software will enable near-real-time data monitoring, tracking, and advanced analytics, with potential future integration into an artificial intelligence engine for forecasting and scenario building. The contract period is from 9/25/2025 to 9/24/2026, with electronic delivery specified, supporting NASA's data analysis and visualization requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0039415 Tab 07 Capability Statement FBO Posting.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements
Sisense provides instant insight into the data providing the ability to monitor, track, and confirm metrics near-real-time. By utilizing Sisense the International Space Station (ISS) teams can perform in-depth analyses and eventually feed into an artificial intelligent (AI) engine for forecasting and scenario building. The information listed below is required to complete this renewal.
2. Characteristics, Scope, and Specs
LINE DESCRIPTION QTY.
1 Sisense Fusion Analytics (FA) - Customer Hosted – Cores For Production use. Includes 5
Admins/Designers, and 10 Viewers. Includes 8 Cores of platform capacity.
2 Sisense Fusion Analytics (FA) - Customer Hosted - Non Production – Cores For Non
Production use. Includes 8 Cores of platform capacity.
3 Sisense Fusion Analytics (FA) - Customer Hosted Unlimited Viewers 1
4 Additional Admins/Designers 15
3. Place of Performance
Johnson Space Center (JSC)
Delivery: Electronic
4. Period of Performance
9/25/2025 – 9/24/2026
File details come from the government source that posted it. Updated .