SATPC0038478 Tab 04 4 SOW.pdf

PDF 270 KB Posted

Attached to
YSI Field Engineer, Hardware Installation & On-site Services Federal contract opportunity
Solicitation number
80NSSC25904248Q
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This Statement of Work (SOW) details NASA Goddard Space Flight Center's requirement for YSI Field Engineer services and hardware installation for environmental monitoring systems. The procurement includes specific equipment such as a mounting frame assembly, mounting frame sections, a 2-pole mast kit, a sonde well, and on-site field engineering services. The detailed scope involves one YSI Field Engineer providing 5 days of on-site installation assistance for a real-time system with SonTek SL500 and YSI EXO sonde, with an additional 3 days of on-site services, including travel and living expenses to Nuiqsut, Alaska. The performance period is 4-6 weeks after receipt of order (ARO), with the primary point of contact being Antonio Mannino at NASA Goddard Space Flight Center located in Greenbelt, Maryland.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements The NASA Goddard Space Flight Center (GSFC) requires the purchase of YSI Field Engineer, Hardware Installation and On-site Services which are integral to the deployment and continued operation of existing YSI environmental monitoring systems, used for critical water quality and hydrodynamic measurements.

2. Characteristics, Scope, and Specs

Quantity OEM Part # Product Description

1 24-0050

SL Mounting Frame Assembly. Consists of 1.2m (4ft) length mounting frame section, slide assembly with adjustable angle mounting plate, plus handle bar.

4 24-0051 SL and Argonaut-SW Mounting frame section, 1.2m (4ft) length

1 370250 2-Pole Mast Kit, for field assembly, galvanized steel.

Includes 2 pole mast, unistrut, and mounting hardware

1 370254-1 Sonde Well, Sloped, Aluminum, with locking well cap, includes all necessary mounting hardware. 20 Feet total

1 370449

YSI One YSI Field Engineer, On-site Hardware Installation

Includes:

One YSI Field Engineer on site for 5 days to assist with installation of Real-time system with SonTek SL500 and YSI EXO sonde. Pricing includes all travel and living expenses, as well as additional travel days to get to and from Nuiqsut, AK. Also includes all necessary installation hardware not called out individually.

1 370453

YSI Additional 3 days of on-site services with Field Engineer

Includes:

Includes living expenses only

3. Place of Performance Antonio Mannino - antonio.mannino-1@nasa.gov; B022; Rm250 NASA Goddard Space Flight Center (GSFC) 8800 Greenbelt Road Greenbelt, MD 20771

4. Period of Performance 4 – 6 Weeks ARO

File details come from the government source that posted it. Updated .