SATPC0038054 Tab 04 4 SOW - REVISED.pdf
PDF 195 KB Posted
- Attached to
- LISA Laser Reliability Subject Matter Expert (SME) Support Federal contract opportunity
- Solicitation number
- 80NSSC25896904Q
About this file
This Statement of Work (SOW) details a sole source contract for a Subject Matter Expert (SME) to support NASA's Laser Interferometer Space Antenna (LISA) laser reliability program. The contract is awarded to Dr. Scott Merritt of Merritt Analytics for a one-year period from 4/15/2025 through 4/14/2026, with a total value not specified in the document. The SME will develop reliability models, conduct design of experiment (DOE) trials, analyze life test data, and provide guidance on the LISA laser system's components, including the laser head, frequency reference system, and power monitoring detectors.
Key requirements include domestic and international travel to vendor sites, attending conferences, and presenting technical findings. Deliverables include quarterly updates to reliability models, trip reports within two weeks of travel completion, a LISA laser reliability plan update by 50 weeks after receipt of order, and a journal paper publication. The work primarily supports NASA Goddard Space Flight Center's in-house laser development for the LISA mission, which aims to use gravitational wave detection to study massive black hole systems. The laser system has stringent lifetime requirements, including 5 years of continuous operation and potential 6-year extended mission lifetime.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW for LISA Laser Reliability Subject Matter Expert (SME) Support
Dr. Scott Merritt (Sole Proprietor, dba Merritt Analytics)
01 April 2025
Background The gravitational wave (GW) space mission Laser Interferometer Space Antenna (LISA) has been chosen for the European Space Agency (ESA) L3 GW astronomy opportunity and NASA intends to contribute instruments to the mission. LISA’s eventual flight will open a spectacular new window on the universe, using gravitational waves to reveal the physics and astronomy associated with the merger of massive black hole systems. The backbone of LISA is a highly stable laser of ~2 W power, which enables the picometer interferometry necessary to record the passage of a gravitational wave. Such a laser is listed as a top priority of the LISA project under Code 460.
One of the more stringent requirements for the LISA laser system is lifetime. The lifetime requirement breakdown for the laser system is as follows
• 6 years comprising 1 year for on-ground testing plus 5 years (TBC) of storage
• 1.5 years OFF state in an operational environment (cruise phase)
• 5 (TBC) years continuous operation in nominal science mode (nominal mission lifetime)
• 6 (Goal) additional years continuous operation in nominal science mode
(extended mission lifetime)
An effective reliability program must include
• a sound plan for life-testing components and subsystems
• understanding the physics of failure of relatively high-risk components so the initial probability of failure is minimized.
• reduce the final probability of failure, e.g. conditioned on passing screening tests
(“screens”) at the component level.
• guide the design of the screening protocols then provide proof (or disproof) of the efficacy of the screens, procedures, and choice of operating conditions.
Scope This task is for a subject matter expert (SME) working closely with GSFC TM to establish a reliability program for the NASA GSFC in-house laser development for LISA.
The laser system for LISA under development includes – laser head (LH), frequency reference system (FRS) and the power monitoring detectors (PMON). The objectives of this task are to develop reliability models and implement design of experiment (DOE) trials to address the lifetime concerns of spaceborne lasers from components to subsystems and systems that are applicable to the LISA mission; provide guidance and implementation of DOEs to address lifetime concerns; analyze lifetest data and update reliability models; develop future lifetest parameters on components, subsystems and systems, and provide reports and presentations for the LISA program.
Requirements
• Travel domestically and internationally to visit vendors’ sites to evaluate individual vendor’s reliability program.
• Attend and present at domestic or international conferences to meet with other reliability engineers and SMEs for technical interchange meetings that will support and benefit the LISA laser development.
Deliverables or Delivery Schedule
# Milestones Dates (# weeks after receipt of order (ARO)) 1 Trip reports Throughout POP, within 2 weeks of completion of travel
Delivery and continue update of reliability models for laser components, laser subsystems, and laser system
Quarterly
3 Update LISA laser reliability plan No later than (NLT) 50 weeks ARO 4 Publish journal paper NLT 50 weeks ARO
Government-Furnished Equipment and Government-Furnished Information
• Test equipment necessary for development of reliability test stations.
Place of Performance
• Majority of the work will be performed at contractor’s site.
• Travel to support LISA laser reliability program
Period of Performance
• 4/15/2025 through 4/14/2026.