This Statement of Work (SOW) details a NASA NESB requirement to upgrade the turntable on the Large Volume Computed Tomography (LVCT) system to support Mars Sample Return Earth Entry Vehicle heat shield inspection. The contractor's primary tasks include installing a higher capacity turntable that is compatible with the current LVCT system, traveling to NASA Langley Research Center (LaRC) in Building 1230, Room 193 to perform on-site work, and calibrating the system to ensure proper functioning. Key deliverables are the installed turntable and proof of system calibration, with specific milestones including turntable installation and verification of calibration.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0038005 Tab 06 RDSS..pdf | ||
| SATPC0038005 Tab 07 Capability Statement SAM.gov.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK TEMPLATE
Introduc�on/Background:
NASA NESB needs to upgrade the turntable on the Large Volume Computed tomography (LVCT) system in order accommodate heavier parts. This upgrade is in direct support of Mars Sample Return Earth Entry Vehicle heat shield inspec�on.
Scope of Work:
Contractor will be installing higher capacity turntable compa�ble with the current LVCT system.
Objec�ves:
To install higher capacity turntable compa�ble with the current LVCT system. To support Mars Sample Return Earth Entry Vehicle heat shield inspec�on.
Descrip�on of the Work/Contractor Tasks:
• To install higher capacity turntable compa�ble with the current LVCT system.
• Travel to NASA LaRC will be required for the contractor to perform the on-site work.
• System will need to be calibrated to ensure proper working func�on.
Deliverables:
• Installed higher capacity turntable compa�ble with the current LVCT system.
• Proof of system calibra�on and working func�on.
Other Considera�ons:
Na
Applicable Documents/Background:
Na
Milestones:
• Installa�on of turn table on LVCT
• Proof of calibra�on
Government-furnished property:
Contractor will be working on the Large Volume Computed tomography (LVCT) which is located on NASA Langley Research Center in Building 1230 Room 193.
Government-furnished informa�on:
Na
| Introduction/Background: |
| Scope of Work: |
| Objectives: |
| Description of the Work/Contractor Tasks: |
| Deliverables: |
| Other Considerations: |
| Applicable Documents/Background: |
| Milestones: |
| Government-furnished property: |
| Government-furnished information: |
File details come from the government source that posted it. Updated .