SATPC0037916 Tab 04 SOW.pdf

PDF 126 KB Posted

Attached to
100 Ton Crane Trolley Replacement
Solicitation number
80NSSC25898810Q
Issued by

About this file

This document is a Statement of Work (SOW) for NASA Kennedy Space Center's requirement to inspect a 100-ton crane at the LAF Facility. The SOW specifies that American Crane and Equipment Corp. (ACECO) will provide one engineer and one technician to evaluate the crane and produce a written condition report with pricing upon job completion. The place of performance is NASA Kennedy Space Center's LAF Facility in Florida, with a lead time of 6-8 weeks after receipt of order (ARO). The point of contact is Matthew Carroll, reachable at 321-289-9088.

The SOW is associated with a sole source procurement (Solicitation Number 80NSSC25898810Q) for a crane trolley replacement study, with NASA/NSSC intending to issue a contract directly to ACECO under FAR 13.106-1(b)(1)(i). The procurement is for commercial items and services, with NAICS Code 333923, and interested organizations can submit capabilities and qualifications by 4:00 p.m. Central Standard Time on 4/8/2025 to potentially influence the competitive approach.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements: to procure the services of American Crane and Equipment Corp. (ACECO) to inspect and write up a condition report on the 100-ton crane in the LAS facility

2. Characteristics, Scope, and Specs

The contractor shall perform the following duties:

a. Services to be provided: Supply one (1) Engineer and one (1) Technician to support the evaluation on the 100-ton crane located in the LAF Facility

b. Written Report w/Pricing shall be provided by Vendor upon job completion.

3. Place of Performance NASA/ Kennedy Space Center LAF Facility POC: Matthew Carroll, LX-G, 321-289-9088 Kennedy Space Center, FL 32899

4. Period of Performance: Lead Time is 6 – 8 weeks ARO

File details come from the government source that posted it. Updated .