This Statement of Work (SOW) outlines requirements for inspection and repair of NASA Spey engine serial number 11189, which is installed on NASA Langley Research Center's Gulfstream GIII aircraft N520NA. The engine requires evaluation and repair due to damage discovered on compressor blades in HP stages 7, 8, and 12 following an inflight compressor stall incident.

The work consists of two line items: (1) Engine removal assistance, shipping, evaluation and preservation, and (2) Engine repairs as approved by NASA. The vendor must provide a subject matter expert for removal support, necessary tooling/fixtures, and shipping equipment, while NASA will provide touch labor for removal. All work must be completed and the engine reinstalled by March 14, 2025. Key deliverables include the repaired engine, documentation portfolio with maintenance records, FAA Form 8130-3 Airworthiness Approval Tags, test results, NDI reports, and engine logbooks. The vendor must provide weekly progress updates and submit repair requests with detailed pricing breakdowns for government approval before performing repairs. All replacement parts must be GIDEP screened and accompanied by appropriate airworthiness documentation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LaRC Spey ESN 11189 Repair SOW Version 4.0 1/22/2025

INTRODUCTION/BACKGROUND

NASA N520NA, a Gulfstream GIII aircraft (serial number (S/N) 478), is a NASA Langley Research Center (LaRC) public-use aircraft used for research missions. Spey engine serial number (ESN) 11189 is installed in the number 2 position (right side) of N520NA. Due to an inflight compressor stall, a detailed borescope inspection was conducted on ESN 11189 during which damage was discovered on several compressor blades in HP stages 7, 8, and 12.

The damage is unlikely related to the compressor stall.

SCOPE OF WORK

NASA requires engine S/N 11189 to be inspected/evaluated and repaired to allow return to service. Specifically, the vendor shall:

Line Item 1:

Assist in removal of engine S/N 11189 from the right position of the LaRC GIII aircraft, N520NA. Specific support required from the Vendor includes:

o Subject Matter Expert in engine removal, preservation, and preparation for shipment. NASA will provide touch labor for engine removal.

o All necessary engine removal tooling or fixtures o Engine shipping stand or cradle

Ship 11189 to vendor facility and complete evaluation of engine.

Preserve and prepare for shipment, as required, and ship 11189 back to NASA LaRC.

Line Item 2:

Repair 11189 as approved by NASA.

PERIOD OF PERFORMANCE

NASA requires work to be completed on S/N 11189 and installation back on N520NA no later than 14 March 2025.

WORK REQUIREMENTS – LINE ITEM 1 - INSPECTION/EVALUATION

1. The work described in this SOW shall be completed In Accordance With (IAW) the current manufacturer`s applicable technical data/publication and the Vendor`s repair station approved processes.

2. The vendor shall provide the LaRC POC with weekly progress updates to include discrepancies found, completed inspections, schedule adjustments, and part requirements.

This report can be verbal or delivered electronically in contractor format.

3. The vendor shall monitor Federal Aviation Administration (FAA) Suspected Unapproved Parts Program (SUP) and GIDEP. All safety critical items purchased and replaced shall be GIDEP screened by the vendor prior to installation/replacement.

4. A description of all maintenance accomplished shall be provided 3 business days after completion of the all work. This shall include test results for engine test cell runs, NDI reports as required, and approved FAA Form 8130-3 Airworthiness Approval Tags/Certificate of Conformance/Material Certification for all vendor acquired parts replaced, and itemized invoicing for all work accomplished beyond the original contracted work. The vendor shall retain, and make available to NASA as required, a record of all maintenance, repair, replacement, inspection, and Non-Destructive Inspections (NDI) accomplished.

5. The vendor shall provide electronic copies of all documents in PDF format.

6. Deliverables

a. Engine S/N 11189

b. Portfolio. See Item 4 above.

c. Forms 8130-3 as required. See Item 4 and 5 above.

d. Engine Logbooks

WORK REQUIREMENTS – LINE ITEM 2 - REPAIRS

Any required repairs discovered during the inspection/evaluation of 11189 shall only be performed once Government Approval is obtained in accordance with the following:

The vendor shall provide to the Government a Repair Request that includes the following:

1. A list of repairs or discrepancies found during maintenance.

2. A price(s) in sufficient breakdown to determine reasonableness (hours/rates/material).

3. A basis of estimate to support the prices proposed.

Upon receipt by the Government, the Government will determine if the repair shall be made by the vendor.

All parts purchased by the vendor and installed shall be accompanied by an approved FAA Form 8130-3 Airworthiness Approval Tag, Certificate of Conformance, or Material Certification.