SATPC0037215 Tab 04 6 SOW Rev_2nd Posting.pdf
PDF 519 KB Posted
- Solicitation number
- 80NSSC25890932Q-R1
About this file
This Statement of Work (SOW) from NASA Glenn Research Center specifies requirements for approximately 2,000 L of high-purity xenon for electric propulsion testing, to be delivered no later than December 31st, 2024.
The xenon must have 99.999% purity or greater, with strict maximum allowable impurity levels detailed in a comprehensive table covering 10 constituents including oxygen, water, carbon compounds, and noble gases. Each cylinder must be fitted with a CGA 580 valve fitting and have at least one year remaining on DOT certification. Detailed documentation requirements include certificates of analysis for each cylinder specifying xenon quantity, measured impurity values, and measurement uncertainty. Standard conditions are defined as 32°F and 29.92 inches of mercury. The government will reject any bottles lacking proper impurity level certification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SATPC0037215 Tab 10 RFQ OM.pdf | ||
| SATPC0037215 Tab 10 RFQ OM.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .