SATPC0037133 Tab 04 4 SOW_Redacted Rev.pdf
PDF 199 KB Posted
- Solicitation number
- 80NSSC25889830Q
About this file
This Statement of Work outlines NASA Glenn Research Center's requirement for renewal of maintenance and support for their existing Star CMM software. The scope includes annual licensing, patches, software support, and upgrades that must be obtained through an authorized vendor.
The requirement covers three specific products: two Simcenter STAR-CCM+ Power Session XaaS licenses and one Simcenter STAR-CCM+ Add 1 XaaS license, each with a 12-month subscription term. The products include concurrent simultaneous user (floating) licenses with HSaaS subscription, annual billing plan, LNX64/W64 versions, and 5GB storage for 5 authorized users. The period of performance is December 1, 2024 – November 30, 2025, with work to be performed at John H. Glenn Research Center, Neil Armstrong Test Facility and Engineering Users either on-site or teleworking. All terms and conditions associated with the order must be included in documentation from bidders.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SATPC0037133 Tab 07 Capability Statement Commercial.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Objective/Requirements The Research and Engineering Directorate, at GRC, requires the renewal of maintenance and support for our current Star CMM. The licensing needs to have the maintenance and support renewed for another year so NASA can get patches, SW Support, and upgrades from the Vendor. The software, licenses and support MUST be obtained only thru an authorized vendor and any terms and conditions associated to the order must be included in the documentation we receive from any bidders. Terms and conditions must be included in the order.
1. Characteristics, Scope, and Specs
2. Place of Performance John H, Glenn Research Center, Neil Armstrong Test Facility and Engineering Users On-site or Teleworking
3. Period of Performance December 1, 2024 – November 30, 2025
File details come from the government source that posted it. Updated .