SATPC0037091 Tab 04 4 SOW.pdf

PDF 172 KB Posted

Attached to
MEMKOR GUNMETAL Series 3U VPX MK3X SSD Storage Modules
Solicitation number
80NSSC25889842Q
Issued by

About this file

This Statement of Work from NASA Marshall Space Flight Center (MSFC) outlines requirements for upgrading their Data Acquisition and Command System (DACS) used in Heliophysics sounding rocket missions. The contractor must provide a specific MEMKOR SSD (part number: MKX3XCFP41T0IG-992A) with detailed technical specifications including: 3U OpenVPX form factor, 1TB storage capacity, conduction cooling to VITA 48.2, XMC supported interfaces, data throughput up to 500 MB/s for SATA and 1200 MB/s for PCIe single devices, operating temperature range of -40 to 85°C, storage temperature range of -55 to 950°C, and ability to operate at 80,000 ft altitude.

The period of performance is 20 weeks from award date, with work to be performed at the contractor's facility. The SSD must meet specific environmental requirements including vibration/shock specifications (VITA 47.1 Class V3 0.1g2/Hz / VITA 47.1 Class OS2 40G lims), data reliability with UBER less than 10-16, and weight under 21bs. The COTS component selection focuses on ensuring compatibility with mission environmental conditions.

View the file

Other files

File Type Posted
SATPC0037091 Tab 10 BNJ Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

DACS SSD

8/23/2024

1. Objective/Requirements

NASA MSFC is upgrading is Data Acquisition and Command System (DACS) that is used during Heliophysics sounding rocket missions. As such, the requirements are intended to select Commercial Off the Shelf (COTS) components that are capable of tolerating the environmental aspects of the missions.

2. Characteristics, Scope, and Specs

The contractor shall provide a MEMKOR SSD part number: MKX3XCFP41T0IG-992A.

That is capable of the following specifications:

3. Place of Performance Contractor’s facility

4. Period of Performance 20 weeks from the date of the award

File details come from the government source that posted it. Updated .