SATPC0036664 Tab 04 4 SOW.pdf
PDF 113 KB Posted
- Solicitation number
- 80NSSC24878865Q
About this file
This document is a Statement of Work (SOW) for the integration of a Commercial Off-The Shelf (COTS) Mission Control Center (MCC) with the existing NASA Goddard Space Flight Center (GSFC) Medium Earth Orbit Search and Rescue Local User Terminal (MEOLUT).
The key requirements include: delivering, installing, and integrating one MCC compliant with the Cospas-Sarsat MCC Performance Specification; integrating the MCC into an existing NASA-provided cabinet in GSFC Building 13 Room C130; integrating the MCC consoles into the cabinet; utilizing NASA-provided network connectivity to share data with the GSFC MEOLUT; and integrating the MCC onto the NASA Data Center (NDC) Domain. The contractor must also deliver a Site Installation Plan, installation schedule, MCC Acceptance Test Plan, and MCC Acceptance Test Report. The MCC will be delivered to the NASA Goddard Space Flight Center, Building 13 Room C130.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SATPC0036664 Tab 06 RDSS..pdf | ||
| SATPC0036664 Tab 07 Capability Statement SAM.gov.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK FOR SEARCH AND RESCUE MISSION CONTROL CENTER
1. Objective/Requirements The NASA Search & Rescue Office requires the integration of Commercial Off-The Shelf (COTS) Mission Control Center (MCC) with the existing GSFC Medium Earth Orbit Search and Rescue Local User Terminal (MEOLUT).
2. Characteristics, Scope, and Specs
- Deliver, install and integrate one (1) Mission Control Center, that is compliant with the Cospas-Sarsat Mission Control Centre (MCC) Performance Specification and Design Guidelines, C/S A.005, Issue 5 – Revision 3, March 2021.
- Integrate the MCC into an existing, NASA provided cabinet in GSFC Building 13 Room C130.
- Integrate the MCC consoles into the cabinet in B13 C130.
- The MCC shall utilize NASA provided network connectivity to share data with the
GSFC MEOLUT in B25 S171/S173.
- The MCC shall be integrated onto the NASA Data Center (NDC) Domain.
- Deliver a Site Installation Plan for review by the Government.
- Deliver and maintain a site installation schedule.
- Deliver a MCC Acceptance Test Plan.
- Deliver a MCC Acceptance Test Report.
3. Delivery
NASA Goddard Space Flight Center, Building 13 Room C130.
File details come from the government source that posted it. Updated .