SATPC0036360 Tab 04 4 SOW..pdf

PDF 109 KB Posted

Attached to
This is for a procurement for 5000 NSI-3A Shorting Plugs Federal contract opportunity
Solicitation number
80NSSC24880580Q
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This document is a Statement of Work (SOW) for the procurement of 5,000 NSI-3A Shorting Plugs. The contractor shall provide the specified quantity of the part number 1502 / SLH26400060 units and include transportation costs to the NASA Johnson Space Center. The SOW outlines the data deliverables, which include a Certificate of Compliance, and specifies a period of performance of 8-26 weeks after award. The contractor must comply with all applicable federal, state, and local safety requirements, as well as regulations for shipping, preservation, and packaging. This procurement is a sole source requirement from the National Aeronautics and Space Administration Shared Services Center.

View the file

Other files for this federal contract opportunity

Other files attached to This is for a procurement for 5000 NSI-3A Shorting Plugs, newest first.
File Type Posted
SATPC0036360 Tab 07 Capability Statement SAM.gov.pdf PDF
SATPC0036360 Tab 06 RDSS..pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

08/06/24

STATEMENT OF WORK FOR NSI-3A Shorting Plugs

1.0 Scope

The Contractor shall provide 500 P/N 1502 / SLH26400060 units. The contractor shall include transportation cost to NASA Johnson Space Center at the address listed below.

This Statement of work will cover one part:

Line Item

Quantity Device Delivery Schedule

1 5000 P/N 1502 / SLH26400060 8-26 Weeks ARO

2.0 Data Deliverables

1. Certificate of Compliance (C of C) -

Supplier shall provide a certification with each shipment to attest that the parts, assemblies, subassemblies, or detail parts conform to the Order requirements. When applicable, the true manufacturers, lot, batch, date code, and/or serial number must appear on the certification.

Certification must contain the following:

• Customer’s Order number

• Product name

• Part number

• Name and address of manufacturing or processing location

• Manufacturer’s lot, date code

• Quantity and unit of measurement (each, box, case, gallons, etc.)

• Be signed and dated by an official of the company

3.0 Period of Performance

NASA is estimating a period of performance for Section 1.0 deliverables of this document to be complete 8-26 weeks after ATP.

4.0 Safety Requirements

The Contractor shall comply with all Federal, State and Local codes and standards applicable to work performed on this contract.

5.0 Shipping, Preservation, and Packaging Requirements

The Contractor shall package and ship the Shorting Plugs in accordance with applicable Federal, State and Local regulations.

The Contractor shall ship the Shorting Plugs to:

NASA/ Lyndon B. Johnson Space Center

Transportation Officer, Bldg 421

2101 NASA Parkway

Houston, TX 77058

1.0 Scope
2.0 Data Deliverables
3.0 Period of Performance
4.0 Safety Requirements
5.0 Shipping, Preservation, and Packaging Requirements

File details come from the government source that posted it. Updated .