This document is a Statement of Work (SOW) for Electrical Contracting services at NASA Langley Research Center in Hampton, Virginia. The contractor shall provide labor, material, and equipment to install new electrical infrastructure, including transformers, panels, and receptacles in rooms 102 and 102A of Building 1299F. Key requirements include furnishing and installing new electrical equipment, replacing lighting, and providing grounding. The work must be completed within 100 days after receipt of the order and shall comply with NASA Langley's electrical requirements. This SOW is related to a federal contract opportunity solicitation (Solicitation Number: 80NSSC24879470Q) issued by the National Aeronautics and Space Administration Shared Services Center for Electrical Contracting services.

View the file

Other files for this federal contract opportunity

Other files attached to Electrical Contracting Services, newest first.
File Type Posted
SATPC0036192 Tab 10 RFQ Open Market Template.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Date: August 1, 2024

1. Objective/Requirements

The Revolutionary Aviation Technology Branch (D331), Research Directorate (RD), NASA Langley Research Center (LaRC) requires the purchase of Electrical Contracting services for Building 1299F room 102 and 102A Alterations – NASA Langley Research Center in Hampton, Virginia.

2. Characteristics, Scope, and Specs

Scope of Work: The contractor shall provide the necessary labor, material, and equipment to perform the following scope of work:

Equipment

• Furnish (1) New 75KVA all copper windings Transformer to feed fused (1) 80A disconnect and

(1) 100A disconnect

• Furnish (1) New 75KVA all copper windings Transformer to feed New 200A 208V Panel

• Furnish (1) New 200A 208V 42 circuit Panel populated with all necessary over current protection for remaining circuits

• Replace and install four 400W equivalent High Bay LEDs in room 102

• E-Stop circuit with all necessary Contactors

Branch Circuit Locations and Equipment At position 1

• in room 102 the contractor will provide and install all conduit and properly sized conductors for:

2 X 120VAC, 20A, single phase (NEMA-5-20R)

The following at position 1 will be E-Stop controlled:

• 1 X 208VAC, 20A, single phase (NEMA-L6-20)

• 1 X 208VAC, 20A, three phase (NEMA-L15-20R)

• 2 X 208VAC, 30A three phase (NEMA-L15-30R)

• 1 X 208VAC, 50A three phase (TBD)

• 1 X 480VAC, 30A, three phase (NEMA-L16-30R) Earth Grounding Bar (Bar provided by 1299f)

At position 3 in room 102A the contractor will install:

• 2 X 208VAC, 30A three phase (NEMA-L15-30R)

• 1 X 208VAC, 20A, single phase (NEMA-L6-20R)

• 2 X 120VAC, 20A single phase (NEMA-5-20R) Earth Grounding Bar (provided by 1299f)

At position 8 in room 102A the contractor will install:

• 1 X 208VAC 80A Non-Fused Disconnect

At position 9 in room 102A the contractor will install

• 1 X 208VAC, 30A three phase (NEMA-L6-30R)

• 1 X 208VAC, 100A three phase drop with a 100A 5 wire Pin and Sleeve Receptacle

At position 4 in room 102 the contractor will provide:

• Raceway stub-up and box for CAT6 data

Additional requirements:

• OHM testing of all conductors before Electrification

• All electrical work shall be installed in accordance with the latest edition of and NASA

LaRC’s Electrical requirements.

• The Contractor shall label all devices, shall update all modified panel schedules, shall generate all new panel schedules, and shall update facility electrical drawings.

• The Contractor shall seal any penetrations.

3. Place of Performance Building 1299F NASA Langley Research Center (LaRC) 8F East Ames Street Hampton, VA 23681

4. Period of Performance 100 Days ARO