SATPC0035361 Tab 04 4 SOW.pdf

PDF 130 KB Posted

Attached to
GOX Trailer Modification and Recertification Federal contract opportunity
Solicitation number
80NSSC24872972Q
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This document is a Statement of Work (SOW) for the Modification and Recertification of a Department of Transportation (DOT) Trailer. The SOW outlines the requirements for the contractor to perform disassembly, inspection, modification, cleaning, painting, pressure testing, and reassembly of a government-owned gaseous oxygen tube trailer. Key requirements include replacing valves, adding new pneumatic-actuated valves, performing hydrostatic pressure testing, and cleaning the trailer components to a specific cleanliness level. The contractor is also responsible for pick-up, delivery, and certification of the trailer in accordance with DOT regulations.

The related federal contract opportunity is a Special Notice for a sole source contract to WELDSHIP LLC for GOX Trailer Modification and Recertification at the NASA Langley Research Center. The contract will be for commercial items and services under FAR Parts 12 and 13. Interested organizations may submit their capabilities by 6/24/2024 for the government to determine if this will be a competitive procurement.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work for Modification and Recertification of D.O.T. Trailer

Line Item 1: Recertification Inspect, modify, and certify as follows:

1. Perform quinquennial disassembly, painting, hydrostatic pressure test, and precision internal cleaning of one (1) Government-owned gaseous oxygen tube trailer in accordance with the current DOT regulations and NASA requirements in this Statement of Work.

2. Remove and replace the current two (2) Sherwood valves with new 1882 Sherwood valves. These valves shall have stem threaded above the packing.

3. Add two new HP2000 pneumatic-actuated valves located on manifold where two pressure indicators/hand valves are located.

4. Trailer shall be returned filled with product as per procedures outlined in this Statement of Work.

5. Price shall include pick-up and delivery to NASA Langley Research Center, Hampton, VA.

Description of Trailer Trailer License No.: 1376 Type of Gas: Oxygen Semi-Trailer Comp: MH-1 Overall Trailer Length: 282 inch Overall Trailer Width: 96 inch Overall Trailer Height: 97 inch Type of Cylinders: ICC 3A-2400 Manufacturer: Standard Steel Works, North Kansas City, MO Approx. length of cylinders: 21 feet Outside diameter of cylinders: 9-5/8 inch Number of cylinders: 30 Approx. water volume of each cylinder@ 70°F: 9 cu. ft.

DOT Re-Test Due Date: 2023

Requirements All procedures shall be performed in accordance with applicable DOT, CGA, and NASA regulations and requirements specified.

Price shall include pick-up and delivery to NASA Langley Research Center, Hampton, VA. The government will ensure that the trailer is road worthy and will be empty Placards and labels will indicate the trailer is empty.

Procedure

1. The Contractor shall disassemble the subject tube trailer into separate bottles, manifolds and connected plumbing.

2, The contractor shall inspect all valves and pressure relief devices (PDR's) and replace or refurbish any that are damaged. The contractor shall replace valves and PDR's with damage to NGT and NPT threads that would reduce the integrity of connections. The contractor shall replace front and rear safety devices on the trailers.

a) All elastomers and lubricants used in the components shall be rated “A” for mechanical impact test of 6700 psi per KTI-5210 Revision C (SEE SOW ATTACHMENT A) unless approved by the contracting officer.

b) The contractor shall provide material certifications for all new components, elastomers, and lubricants used.

c) All metallic items used shall be Type 316 Stainless Steel (S31600) or a metal with a higher “Promoted Ignition Lowest Burn Pressure” per Table 2 of KTI- 5120 Revision C.

3. The contractor shall inspect the internals of the cylinders and remove all deleterious material including rust, Teflon tape, and any other foreign material that could block flow through valves and connected plumbing.

4. The contractor shall pressure test the cylinders in accordance with DOT and CGA regulations including CGA C-1, Methods for Hydrostatic Testing of Compressed Gas Cylinders.

The contractor shall take care when using Teflon tape to ensure that excess material is not released into the cylinders or connected plumbing.

5. The contractor shall:

i. Remove all rust, dirt, and loose paint from the exterior of each of the gas cylinders and other trailer parts. If sand blasting is to be performed, all other parts of the trailer that could be damaged by the sand blasting shall be protected.

ii. Apply one coat of zinc chromate primer, Federal Spec. TI-P-645 or equal, and two coats of Spatz White Enamel, No. 2109 or equal, to each of the gas cylinders.

iii. Paint other trailer parts with one coat of epoxy primer or equal, and two finish coats of exterior enamel yellow paint.

iv. Apply identifications and markings to trailers in accordance with the latest edition of the applicable DOT regulations.

6. The contractor shall clean the bottles, components, manifold, and all other wetted surfaces of the tube bank assembly to Level 1000B (or cleaner) per Table 1 “Fluid Surface Cleanliness Levels” of KSC-C-123J (2009) (SEE SOW ATTACHMENT B).

i. If the contractor cleans, tests, and verifies the surface cleanliness levels per KSC-C-123J then a certificate shall be signed stating this along with signed cleanliness level verification reports for the bottles, manifolds, valves, and other components of the tube bank assembly.

ii. If the contractor chooses to clean and test for cleanliness with other methods then the contractor shall submit these procedures for approval by the government prior to beginning cleaning.

iii. Regardless of the cleaning method, the final flush and testing fluid solvent shall be one of those shown on Table 3 “Solvents, Maximum Allowable Nonvolatile Residue” of KSC-C-123 that does NOT have note 2 or 3 indicated or another solvent that is tested and certified to satisfy the requirements of NASA-STD-6001B “Flammability, Odor, Offgassing, and Compatibility

Requirements and Test Procedures for Materials in Environments that Support Combustion”.

iv. Following cleaning the components shall be purged dry with Quality Verfication Level (QVL) “Q” nitrogen per CGA G-10.1-2016 “Commodity Specification for Nitrogen”. The purge gas vessel and piping system shall be verified to be clean to Level 300A per KSC-C-123F. The purge gas shall be filtered with a 10 micron filter prior to being introduced into the clean tube trailer components.

7. The contractor shall reassemble the tube trailer while maintaining the cleanliness integrity of the wetted surfaces.

8. Following completion of hydrostatic testing, painting, cleaning, and reassembly, the contractor shall pressurize and leak test trailer, including all cylinders, manifolds and connected plumbing, as follows:

i. Pressurize with nitrogen to 2400 psig.

i. Test gas shall be Quality Verification Level (QVL) “Q” per CGA G-10.1-

2016 “Commodity Specification for Nitrogen”. The purge gas vessel and piping system shall be verified to be clean to Level 300A per KSC-C-123F.

The purge gas shall be filtered with a 10 micron filter prior to being introduced into the clean tube trailer components.

ii.

iii. Perform a leak test using the soap bubble test method. Repair and re-test until all leaks are eliminated.

iv. Verify the performance of all cylinder valves by filling the cylinders to nominal full trailer pressure, closing all cylinder valves, venting the manifolds to atmosphere, closing the main manifold valves, and observing that the manifold pressures do not increase due to leaking of cylinder valves.

9. The contractor shall deliver the trailer filled with 99.5% pure oxygen per CGA G- 4.3-2015 “Commodity Specification for Oxygen” Quality Verification Level “C”.

The tube bank shall be delivered in a leak free condition to NASA Langley Research Center.

Pick up and Delivery

The Contractor shall pick up the tube trailer at Building 1199, 2 East Ames Street, NASA Langley Research Center, in Hampton, Virginia with Contractor-furnished equipment, and deliver the trailer to the Contractor's plant. Upon completion of the all the requirements herein, the Contractor shall return the trailer to the same location.

The Contractor shall arrange for pickup of the trailer with Mr. Steve Scearce at (757) 344- 4164. The government may require up to five days advance notice of pickup to ensure that the trailer is prepared and road worthy.

Certification The Contractor shall furnish the Government with certification papers stating that the tube trailer has met all the current requirements of the US Department of Transportation governing oxygen trailers. A schematic of the physical layout of the bottles in the trailer, including the bottles' serial numbers, shall be included with the certification papers.

File details come from the government source that posted it. Updated .