SATPC0034030 Tab 06 BNJ..pdf
PDF 142 KB Posted
- Solicitation number
- 80NSSC858304Q
About this file
This document contains a brand name justification for a federal procurement. The National Aeronautics and Space Administration Shared Services Center seeks to acquire specific Wago electrical terminal blocks, end plates, jumper bars, marking cards, and electronic circuit breakers for use in upgrading controls at the High Pressure Industrial Water facility. The procurement requires the exact Wago part numbers listed due to the components being designed into the new programmable logic controller system. Using other brands could require redesign efforts, additional market research, and delay the construction schedule. The total estimated cost of this procurement is $XXX,XXX with a four week estimated delivery period from order placement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SATPC0034030 Tab 04 4 SOW..pdf | ||
| SATPC0034030 Tab 10 RFQ Open Market Template Updated.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 V2.0 3-15-2017
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
NASA SHARED SERVICES CENTER
RECOMMENDATION AND DETERMINATION TO SOLICIT FROM ONE SOURCE
OR BRAND NAME
PICK ONE
Brand Name Justification:
☒I recommend that NASA, NASA Shared Services Center negotiate with only with vendors who can provide for purchase of the following Wago products: two hundred fifty (250) 0.8mm grey end plates (Wago 2002-1491), two hundred fifty (250) 0.8mm orange end plates (Wago 2002-1492), three hundred
(300) black terminal blocks (Wago 2202-1405), nine hundred (900) grey terminal blocks (Wago 2202- 1401), three hundred (300) green/yellow terminal blocks (Wago 2002-1407), three hundred (300) orange terminal blocks (Wago 2002-1402), five hundred (500) RELAY 24V DC 6A/250V (Wago 857-304), five thousand (5000) ferrule sleeves FOR AWG 20 (Wago 216-241), five thousand (5000) ferrule sleeves FOR AWG 18 (Wago 216-241), eight hundred (800) triple deck terminal blocks (Wago 280-550), two hundred fifty (250) end and intermediate plates (Wago 280-303), two hundred fifty (250) connector end plates(Wago 280-304), two hundred fifty (250) comb style insulated jumper bars (Wago 280-490), seventy five (75) WMB marking cards (Wago 793-5501), and three hundred twenty (320) electronic circuit breakers (1 channel 24 VDC, 2A) (Wago 787-3861/108-020). The total estimated cost of this effort is and the estimated period of performance or lead-time for delivery is 4 weeks from order to delivery (initial estimate from vendor).
This recommendation is for the acquisition of supplies or services determined to be reasonably available from only one source/only one manufacture. Competition is impractical for the following reasons (please answer the questions below):
1. What are the reasons for soliciting only the suggested source/suggested brand name? Please provide the unique characteristics of the items or services along with the supporting rationale and the market research performed to substantiate your reason for the suggested source/brand name.
A Specific brand and part numbers for hardware have been identified in a NASA design to be supplied as GFE for a construction project. The requirements include specific name brand/model numbers and have been specified in accordance with design criteria and commonality of hardware utilized throughout SSC for other upgraded PLC systems. These Wago components have been specifically selected for the unique design of the new HPIW PLC.
2. What is the impact to the government if another vendor/brand is used? Include any dollar, schedule, or compatibility impacts if possible.
If another brand besides Wago is used for above listed products, the government will be required to initiate a contract change for redesign or design updates. This would result redesign efforts to complete additional market research and to select other products that appropriately meet the system requirements. The components selected were chosen for the unique design of the new HPIW PLC cabinets, and the compatibility of other products would need to be verified. Any additional design work would come at a cost to the government and cause delays in scheduling construction efforts. This design effort would be necessary to ensure the material meets system requirements, and the selected products listed above have already been approved as a part of the design package.
ADDITIONAL COMMENTS: