SATPC0033148 Tab 04 SOW.pdf
PDF 67 KB Posted
- Solicitation number
- 80NSSC23848384Q
About this file
This statement of work outlines requirements for an extended warranty on a GE Additive XLine 2000R additive manufacturing machine. The National Aeronautics and Space Administration Shared Services Center seeks a one-year extended warranty to provide machine training, onsite coverage, preventative maintenance, field modification instructions, software upgrades, and repairs at Marshall Space Flight Center in Huntsville, Alabama from February 16, 2024 through February 16, 2025. The extended warranty would include 40 hours of machine training per year, 8am-5pm onsite coverage on weekdays excluding holidays, an annual preventative maintenance inspection scheduled at least 30 days in advance including replacement of wear parts and calibration of sensors and optics, and all software upgrades for the GE machine.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK GE Additive Extended Warranty
1. Objective/Requirements
Marshall Space Flight Center requires an Extended Warranty on the GE Additive
XLINE 2000R system, to perform repairs, upgrades, and preventive maintenance operations for one year.
2. Characteristics, Scope, and Specs
Machine training hours 40 hours per year per machine.
On‐site Coverage Hours 8am ‐ 5pm local time, excluding weekends and public holidays.
Other times may be available by special arrangement.
Preventative Maintenance 1 per year over the life of the contract for the Xline 2000R to be scheduled at minimum of 30 days in advance.
PM scheduled 8am ‐ 5pm local time to carry out the following standard maintenance checklist and plan:
• Replace wear parts. Labor and shipping included.
• O2 sensor calibration verification.
• Clean interior and exterior surfaces of Process Chamber and Glove Box.
• Inspection of GE supplied accessories.
• Inspect, adjust and clean optical items such as F‐theta lens, laser protection glass, etc.
This shall also include focus height verification.
• Verify laser power calibration and adjust linearization as required.
• Laser cooling system inspection and fluid change. (Distilled water is to be provided by customer.)
• Generate and archive any necessary back‐up files.
• Provide service and calibration data
Field Modification Instructions (FMI's)
As required, Regulatory, Quality and Safety required instructions/recalls
Software Upgrades All GE machine software upgrades:
• CL WRX Software suite
3. Place of Performance
Marshall Space Flight Center in Huntsville, AL
4. Period of Performance
February 16, 2024 – February 16, 2025.
File details come from the government source that posted it. Updated .