This statement of work outlines the requirements for Swagelok parts and assembled panels for gas delivery systems within the Measurement Systems Lab at NASA Langley Research Center. The statement specifies various stainless steel tubing, fittings, manifolds, valves and other hardware components that must meet technical specifications for compatibility with existing gas cabinets and pressurized lines. Key deliverables include two DIBERT panels by January 2024 to service various inert and reactive gases, as well as over 600 feet of tubing, over 200 fittings, five valves and other items. The related federal contract solicitation is for these Swagelok parts and assembled panels with a delivery date in January 2024 to Neil Rodrigues at NASA Langley Research Center for use within building B2104. The opportunity was issued by the National Aeronautics and Space Administration Shared Services Center as a special notice.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4200845905 Statement of Work

1. Objective/Requirements:

Swagelok parts and assembled panels for several different gas delivery systems for use within the Measurement Systems Lab. The requested parts and panels must be compatible with existing hardware that service four different gas cabinets (two with toxic gasses and two with flammable gasses) and several different pressurized lines featuring inert gasses and oxidizers. All parts must be to specification (including physical size, fittings, manifolds, valves, material, surface finish, purity, cleanliness, etc.). These hardware components will be used to interface with complex existing infrastructure in the laboratory, as a result the requirement to follow specification is significant.

1. Characteristics, Scope, and Specs:

a. 2x DIBERT-071723-PANEL to service nitric oxide, methane, air and inert gasses.

b. 3x DIBRT-011223-UHPASSY to service fluorine, hydrogen, oxygen, and inert gasses.

c. 260 ft. SS-T4-S-035-20 1/4" stainless steel wall tubing.

d. 60 ft. 6L-T4-S-035-20-G30 1/4" stainless steel wall tubing G30 cleaned and passivated.

e. Tube support kits for 1/4" tube: 50x 304-S1-PP-4T.

f. 1/4" stainless steel tube fittings: 48x SS-400-9, 12x SS-400-3, 20x SS-400-6, 5x SS-400-3-

4TTF, 25x SS-402-1, 20x SS-400-SET.

g. 1/4" stainless steel tube fittings that have been SC-11 cleaned: 12x SS-400-9SC11, 3x SS-

400-3SC11, 5x SS-400-6SC11, 1x SS-400-3-4TTFSC11, 5x SS-403-1BLBQ, 5x SS-404-1BQ.

h. 60 ft. SS-T12-S-065-20 3/4" stainless steel wall tubing.

i. Tube support kits for 3/4" tube: 10x 304-S1-PP-12T.

j. 3/4" stainless steel tube fittings: 12x SS-1210-9, 3x SS-1210-3, 5x SS-1210-6, 1x SS-1210-

3TTF, 5x SS-1212-1, 5x SS-1213-1, 5x SS-1214-1.

k. 370 ft. 6L-T4-S-035-20-E2 1/4" stainless steel wall tubing with electropolish.

l. 20 ft. 6L-T6M-S-1.0M-20-E2-IS 6 mm ultrahigh purity wall tubing.

m. 1/4" stainless steel VCR fittings that have been SC-01 cleaned: 80x 6LV-4MW-9P, 6x 6LV-

4-VCR-3S-4TB7P, 1x SS-4-VCR-2-4-03816, 10x 6LV-4-VCR-3S-4TB7P.

n. 1/4" stainless steel VCR fittings that have been SC-11 cleaned: 4x SS-6M0-6-4SC11.

o. 1/4" stainless steel VCR fittings: 10x SS-4-VCR-4, 16x SS-4-VCR-2, 4x SS-4-VCR-2-VS.

p. 1/4" stainless steel VCR valve: 5x 6LVV-DPFR4-P.

2. Deliverables:

a. 11 weeks after award.

b. Delivery:

Neil Rodrigues NASA Langley Research Center Mail Stop 061 B2104/305C22 Hampton, VA 23681 neil.s.rodrigues@nasa.gov mailto:neil.s.rodrigues@nasa.gov

3. Place of Performance:

a. Items manufactured at the Swagelok facility and delivered to NASA

4. Period of Performance:

a. Delivery Date by January 2024

1. Characteristics, Scope, and Specs:

File details come from the government source that posted it. Updated .