SATPC0032049 Tab 04 4 SOW.pdf

PDF 178 KB Posted

Attached to
FY23 AvPro Tenney and TEC Autoclaves Support Renewal
Solicitation number
80NSSC23841792Q
Issued by

About this file

This statement of work outlines requirements for renewal of autoclave service and support contracts. NASA Langley Research Center requires continued gold package service support for one Tenney autoclave and one TEC autoclave. This includes unlimited phone support, 30 hours of online and onsite engineering labor, semiannual onsite calibrations, database archiving services, and discounted additional engineering labor and parts. The period of performance is from September 21, 2023 through September 20, 2024. The related federal contract opportunity posted on Solicitation Number 80NSSC23841792Q seeks to renew AvPro Tenney and TEC Autoclaves support services for Fiscal Year 2023 for the National Aeronautics and Space Administration Shared Services Center.

View the file

Other files

File Type Posted
SATPC0032049 Tab 07 Capability Statement Comm.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements

The Fabrication Technology Development Branch at NASA Langley Research Center (LaRC) requires the renewal of AvPro Tenney and TEC Autoclaves Gold Package Service and Support.

2. Characteristics, Scope, and Specs

Item # Description Quantity

AV‐ES‐SP‐G‐22

TENNEY AUTOCLAVE (SN914) Gold package service support including: Unlimited Phone Support** 1

AV‐ES‐SP‐G‐22

TEC AUTOCLAVE (SN399) Gold package service support including: Unlimited Phone Support** 1

30 Hours Online and Onsite Support Engineering Labor** Discounted Additional Engineering Labor Discounted Additional Parts and Materials Semi‐Annual On‐Site Calibration Semi‐Annual Database Archiving NIST Traceable Calibration Records Annual Database Archiving Service Package Discounts May be Offered for Multiple Systems Additional benefits after 3 consecutive years under a service package

** Non‐premium labor hours ‐ during normal business hours

3. Place of Performance

NASA Langley Research Center Hampton,VA 23681-2199

POC: Kelvin Boston kelvin.g.boston@nasa.gov

4. Period of Performance

POP 09/21/2023 – 09/20/2024

File details come from the government source that posted it. Updated .