SATPC0031801 Tab 04 4 SOW.pdf

PDF 127 KB Posted

Attached to
Upgrade WoW room computer, software and projector lamps Federal contract opportunity
Solicitation number
80NSSC23839803Q
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This statement of work outlines an upgrade project for a high-end projection system at NASA's Goddard Space Flight Center in Greenbelt, Maryland. The contractor shall replace the aging lamps in the existing four ceiling-mounted projectors, set up a new Render computer to drive the projectors running Microsoft Windows 11, and commission an automated projector alignment system called Mystique. The work shall be performed between July 1, 2023 and September 30, 2023 at Building 21 on site. Additionally, the related federal contract opportunity posted by the National Aeronautics and Space Administration Shared Services Center, solicitation number 80NSSC23839803Q, seeks upgrades to the computer, software, and projector lamps for the WoW room projection system.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements The high-end projection system purchased from Christe in 2017 needs to be overhauled and upgraded. This system consists of four ceiling-mounted projectors that project a single image onto a large screen. At this time, we plan to replace the aging lamps in each projector, install a hardware/software system that automatically aligns the projectors so that overlap in imagery does not introduce artifacts, and replace the computer that drives the whole system with a more modern computer that can run Microsoft Windows 11.

2. Characteristics, Scope, and Specs

The contractor shall perform the following duties:

• Replace and calibrate the lamps in the existing four projectors.

• Set up and commission a new Render computer to drive the projectors.

• Set up and train Mystique, the automated projector alignment system.

3. Place of Performance Building 21, NASA/Goddard Space Flight Center, Greenbelt, MD

4. Period of Performance This work shall take place 7/1/2023 – 9/30/2023.

File details come from the government source that posted it. Updated .