STATEMENT OF WORK

1. Objective/Requirements A 2024 wind tunnel test entry requires vaious new pressure transducers. For compatibility with the rest of the transducers in the facility, all requested items shall be manufactured by Setra Systems, Inc.

2. Characteristics, Scope, and Specs

The table below shows the pressure transducers required, including Setra model number, quantity, and description.

Model Number Qty Description 2041500PA2F2BY19EN 2 Model 204, 500 PSIA range 2061500PA2F22028NN 6 Model 206, 500 PSIA range, 2 ft cable 2061100PA2F22028NN 5 Model 206, 100 PSIA range, 2 ft cable 2061025PA2F22028NN 10 Model 206, 25 PSIA range, 2 ft cable 2061025PA2F22258NN 1 Model 206, 25 PSIA range, 25 ft cable 2061500PA2F22258NN 4 Model 206, 500 PSIA range, 25 ft cable 2061100PA2F22258NN 1 Model 206, 100 PSIA range, 25 ft cable

3. Place of Performance 8x6 Supersonic Wind Tunnel at NASA Glenn Research Center.

Address:

21000 Brookpark Rd.

Cleveland, OH 44135

4. Period of Performance Items shall be received by 1/1/2024 and will be utilized for pressure transducing for wind tunnel testing beginning around 3/1/2024 and continuing indefinitely.