Statement of Work – Drill Engineering and Maintenance Support May 2023

Effective date: 1 May 2023 End date: 31 October 2026

No. Task FY23 FY24 FY25 FY26

1 TRIDENT Maintenance (Base Period):

(a) Field support during drill field tests, virtual with on-call possible onsite assistance to test sites within 250 miles radius from Altadena.

(b) Virtual field support for remote drilling tests.

(c) Provide Honeybee drill SW updates as necessary.

(d) Support field readiness review and periodic technical consultations.

(e) Any additional costs of materials, parts or personnel above and beyond those listed in a – d above shall require release of additional funds.

5/1/23 – 10/31/23

2 TRIDENT Upgrade Design Studies (Option 1):

(a) TRIDENT-2 redesign work, as needed to fit on a InSight-class lander deck with a 2m drill string.

(b) Z-stage and deployment arm modifications necessary to accommodate a 2m drill string.

(c) Trade study of sample handling methods and distribution to instruments

(d) Biobarrier trade study and redesign.

6/1/23 – 9/30/23

3 TRIDENT Maintenance (Option 2):

(a) Field support during drill field tests, virtual with on-call possible onsite assistance to test sites within 250 miles radius from Altadena.

(b) Virtual field support for remote drilling tests.

(c) Provide Honeybee drill SW updates as necessary.

(d) Support field readiness review and periodic technical consultations.

(e) Any additional costs of materials, parts or personnel above and beyond those listed in a – d above shall require release of additional funds.

11/1/23 – 10/31/24

4 TRIDENT Maintenance (Option 3)

(a) Field support during drill field tests, virtual with on-call possible onsite assistance to test sites within 250 miles radius from Altadena.

(b) Virtual field support for remote drilling tests.

(c) Provide Honeybee drill SW updates as necessary.

(d) Support field readiness review and periodic technical consultations.

(e) Any additional costs of materials, parts or personnel above and beyond those listed in a – d above shall require release of additional funds.

11/1/24 – 10/31/25

5 TRIDENT Maintenance (Option 4)

(a) Field support during drill field tests, virtual with on-call possible onsite assistance to test sites within 250 miles radius from Altadena.

(b) Virtual field support for remote drilling tests.

(c) Provide Honeybee drill SW updates as necessary.

(d) Support field readiness review and periodic technical consultations.

(e) Any additional costs of materials, parts or personnel above and beyond those listed in a – d above shall require release of additional funds.

11/1/25 – 10/31/26

6 TRIDENT-2 Drilling Trade Studies (Icebreaker/MLE 2025) (Option 5)

11/1/24 – 10/31/25