SATPC0030806 Tab 04 SOW.pdf

PDF 342 KB Posted

Attached to
End Caps and Sleeves for Supplemental Heat Rejection Evaporative Cooler (SHREC)
Solicitation number
80NSSC23832411Q
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements The NASA Johnson Space Center, Crew and Thermal Systems Division, Thermal Systems Branch is requesting to procure fabricated End Caps and Sleeves to support the Supplemental Heat Rejection Evaporative Cooler (SHREC) hardware for ISS.

These components will be used to fabricate the redesigned SHREC cartridges for qualification testing. Buildup of qualification hardware must begin early May in order to complete testing by end of the fiscal year but components are needed late April to accommodate cleaning and surface preparation. It is critical that the SHREC qualification testing is concluded by this milestone to maintain schedule.

The parts are described below:

Part Name Part Number Quantity Serial Numbers

Assigned Cartridge Sleeve

SDG1112714-

19 N/A

Cartridge End Cap

SDG11102713-

6 1326,1328,1330,1332,1334,1336

Cartridge End Cap

SDG11102713-

6 1426,1428,1430,1432,1434,1436

Cartridge End Cap

SDG11102713-

2 1323,1325

Cartridge End Cap

SDG11102713-

2 1423,1425

2. Characteristics, Scope, and Specs

The contractor shall perform the following duties:

Provide high-precision, tight-tolerance, machined aerospace parts described above.

Provide record of MIP inspection as specified on the drawings Provide material cert information for the stock used to fabrication specified components Vendor shall be responsible for ensuring that the parts are packaged such that dimensional integrity and surface finish is preserved (specifically with o-ring grooves on sleeves), contamination and corrosion are prevented, and no physical damage occurs.

3. Place of Performance

Precision Expedited in Rancho Mission Viejo, Ca

4. Schedule Lead time for delivery shall be 4 weeks after receipt of order.

File details come from the government source that posted it. Updated .