SATPC0029890 Tab 04 Tab 04 SOW NASA_Redacted.pdf
PDF 315 KB Posted
- Attached to
- Proof of concept for leveraging Caterpillar simulation development tools in support of IPEx Project
- Solicitation number
- 80NSSC23822319Q
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Caterpillar Inc. Support of The In-Situ Resource Utilization
Pilot Excavator Project
November 09, 2022
• Angle of Repose – Data to include: Friction between test disc and regolith (static and rolling coefficient of friction), size and shape of the disc, height of material drop.
• Tri-Axial Compression – Raw data will be obtained from associate author of the published paper ‘Geotechnical Properties of BP-1 Lunar Regolith Simulant’. If data unavailable, NASA KSC will perform triaxial testing.
• Shear – Pocket shear vane test data will be obtained from published paper ‘Soil Test Apparatus for Lunar Surfaces’. If tests need to be repeated, NASA KSC will perform testing.
Systems Tests:
• Single Drum – NASA KSC will provide test data & detailed CAD of test articles from paper ‘ISRU Pilot Excavator: Bucket Drum Scaling Experimental Results’
• Mobility/Drawbar – Using the control parameters: wheel rotation velocity, load condition, vehicle configuration. And the dependent parameters: wheel torque, ground truth translation velocity, wheel slip.
• Task 2 – Provide an analysis of runtime versus computing resources.
o Caterpillar will also provide a comparison, where possible, against commercial code EDEM for runtime vs computing resources, numerical stability and accuracy.
o Task 2 shall be completed with task 1 unless otherwise negotiated with Project PI, PM or CO.
• Task 3 – Determination of modeling environment to support autonomy/mission conops simulations o Caterpillar will provide a recommendation as to whether a different modeling approach will be necessary to support autonomy and conops simulations.
o This will be based on the tradeoffs of simulation fidelity versus runtime and associated computing resources achievable with Rocks3D since the autonomy/conops simulations will require real time or faster than real time simulation run times.
o Task 3 shall be completed with Task 1 unless otherwise negotiated with Project PI,
• Task 4 – Estimate cost to support NASA IPEx Mission through completion o NASA will provide necessary IPEx design information & likely lander system.
o Caterpillar will assess its Dynasty multi-body dynamics code’s ability to simulate this system o Caterpillar will provide a cost estimate for licensing (including Rocks3D &
Dynasty), training (including Rocks3D and Dynasty), Subject Matter Expert consultation support, and development of empirical model (Task 3), if needed.
o Task 4 shall be completed with Task 1 unless otherwise negotiated with Project PI, Deliverable Summary:
Task # Task Description Timing Task 1 Tune Discrete Element Model (DEM) to NASA provided test data 2 months after receipt of test data
Task 2 Runtime versus compute environment based on Task 1 outcomes
With completion of Task 1
Task 3 Determination of modeling environment to support autonomy/conops simulations
With completion of Task 1
Task 4 Cost estimate to support NASA IPE mission through completion – based on outcome/success of Tasks 1-3.
With completion of Task 1
Ground Rules / Assumptions:
• There are no delivery of goods or material costs associated with this Level-1 contract.
• Technical content of deliverables and their submittal dates should be held to this SOW unless otherwise negotiated and approved by the NASA PI, PM or CO.
File details come from the government source that posted it. Updated .