SATPC0026536 Tab 04 4 SOW.pdf
PDF 88 KB Posted
- Attached to
- Resistance Temperature Detectors (RTDs)
- Solicitation number
- 80NSSC22794845Q
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SATPC0026536 Tab 06 BNJ_Redacted.pdf | ||
| SATPC0026536 Tab 10 RFQ Open Market.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3/1/2022 Page 1 of 1
Statement of Work
EUS Green Run RTDs
The NASA, John C. Stennis Space Center (SSC) has been selected as the test site for the Exploration Upper Stage (EUS) Green Run Test Project. This work is planned at Stennis Space Center’s (SSC) B-2 Test Stand. The work to be performed under this project consists of providing instrumentation to support EUS Green Run testing on the B-2 Test Stand.
The new instrumentation for the B-2 Test Stand will consist of Resistance Temperature Devices
(RTD).
1. Equipment shall be provided that meets NASA's requirements identified in the attached specification.
NASA SSC shall issue a Firm Fixed Price Contract for the following:
a) Ten (10) platinum RTD wire wound elements with internal bridge. Effective bridge resistance approximately 19 KΩ. Brand Kaye, model V0360, or approved equal, with a minimum temperature range of -40 – 80°C, accuracy of +/- 0.1°C and +/- 0.05°C per year, sensitivity of 0.0091 mV/V per °C, operates on 5 – 24V DC. Furnish with calibration certificate as defined in the Instrument Specification for B-2 Facility, 140HF-
GE04.
2. The vendor shall provide a completed calibration test report, which shall include:
a) A description of the test configuration, including a figure depicting this configuration.
b) Test results, which indicate that the device meets the uncertainty requirements of the specification.
3. NASA shall review the test data for adequacy and acceptability.
4. The vendor shall perform these tests at the vendor’s facility.
5. The vendor shall provide lead time for delivery for all transmitters:
6. The vendor shall propose a project schedule identify all tasks identified in this Statement of Work.
7. The vendor shall identify standard terms for hardware maintenance.
8. The vendor shall provide documentation per the included specifications.
9. The vendor shall identify equipment compliance with section 508 of the Rehabilitation Act of 1973 (Ref 36 CFR 1194) and NASA Procurement Information Circular per the following web site: http://www.hq.nasa.gov/office/procurement/regs/pic05-01.html.
10. The vendor shall identify equipment compliance with the Environmental Protection Agency’s (EPAs) comprehensive guideline lists (CPGs) per the following web site:
http://epa.gov/epaoswer/non-hw/procure/products.htm.
11. The vendor is requested to provide cost and schedule proposals for providing hardware elements only that are fully compliant with the referenced NASA Specifications (140HF-GE04).
swactor Highlight
File details come from the government source that posted it. Updated .