U.S. Embassy Luanda, angola Scope of Work for the Purpose of a Contract
| Replacement of Parking Arias Canopies |
| 5/10/2016 |
Contents
| 1. | LABOR-MATERIAL REQUIREMENTS TO PERFORM SERVICES | 1 |
| A. | Summary | 1 |
| B. | GENERAL | 1 |
| 2. | WORK TO BE DONE | 1 |
| C. | Description | 1 |
| D. | Site Limitations: | 1 |
| E. | Performance period: | 2 |
| F. | Warranty of work: | 2 |
| G. | Site Conditions: | 2 |
| 3. | LABOR | 2 |
| 4. | Evaluation of Offers | 2 |
| Appendix 1 | 3 |
LABOR-MATERIAL REQUIREMENTS TO PERFORM SERVICES
Summary The Embassy of the United States of America, in Luanda, Angola is soliciting services of labor; materials and fully comprehensive work for installation of permanents canopies in the Embassy on the parking arias.
GENERAL
A. The contractor shall provide all materials necessary for the fully comprehensive work, unless otherwise specified.
B. The provision of skilled labor means Certified/trained laborers with at least three years experience in their particular field, equipped with all hand/electrical tools, etc. necessary to carry out their work.
C. The contractor shall be able to operate simultaneously with two teams of laborers and schedule the work with a two-day advance notice D. The contractor shall furnish the following documentation at time of bid.
i. Price breakdown of work according to SOW
ii. Timeline for work
iii. Certifications of skill sets for all foremen/supervisors
iv. Contact information for on-site supervisor
v. Copy of insurance policy for civil liability
vi. 3 references of previous work (Pictures and contact info)
The above documentation is mandatory at time of Bid. Otherwise contractor will be deemed “Unacceptable”.
2. WORK TO BE DONE
Description
i. Installation of permanent canopies at the Embassy compound. The canopies will consist of the installation of galvanize pipe with required primary paint, blue canvass, check out the concrete base and qualifying welder to fabricate any item as necessary, inserts for an aesthetically pleasing appearance.
ii. Site Limitations:
1. Working hours are from 8:30AM to 5:00PM Monday thru Thursday and 8:30AM to 12:00PM on Friday unless otherwise specified. The contractor will be escorted by the resident or an embassy employees and all time.
2. The contractor will be fined $100.00USD per day if they fail to meet the start date of the provided schedule.
3. Employees caught sleeping on the job will be kicked off site and the contractor will be fined $100.00USD per violation.
Performance period:
1. Work will be completed by end of performance period or Contractor agrees to pay a 1% of the total contract value for each day as a fine or liquidated damages for going over the date. If there are any concerns regarding the Performance period please raise the concern during the site visit.
Warranty of work:
1. The contractor agrees that
i. Materials and equipment used by the contractor and any subcontractor will be new and of good quality unless otherwise required
ii. The work will be free from defects for a period of 1 year and other than those inherent in the work as specified
iii. Work will conform to the requirements of the contract documents.
Site Conditions:
1. The site will be free of any debris related to the construction services at the end of the project. Cutting or welding on the ground shall not leave any markings of any kind. To prevent marking the ground it is recommended that the cutting or welding be done offsite or have a protective layer for the pavers/ concrete. Paint will be cleaned up using an outdoor faucet or away from the residence. There shall not be any paint residue left at the faucet area.
3. LABOR
1. All the work to be carried out at the site, not described in the list of the fully comprehensive work shall be calculated on a time and material basis approved by the contracting officer’s representative (COR).
2. Schedule a walkthrough with the COR at least one week prior to the completion of work for a SUBSTANTIAL COMPLETION walkthrough. This is dependent on the total length of the project. At which point the COR and the contractor will agree upon a punch list or items remaining to be completed prior to FINAL COMPLETION. Both parties will agree upon a time frame for the work to be done. At the Final Completion a walkthrough will be done and a certificate will be signed. The one year of warranty will be based upon that date.
1. Evaluation of Offers
1. Evaluation for awarding the contract shall be based upon economic offer and proven performance verified by references or already quality or work.
2. Vendor Information and Signature of Understanding Vendor Name:
Date:
Name:
Signature:
Substantial Completion Inspection
Inspecting work done so far as per the Scope of Work.
List any deficiencies needed to be completed to obtain Final Completion Certificate.
Work to be completed by Date: _____________________________
Embassy of the United States of America
Luanda, Angola
Final Completion Certificate
I, (COR) __________________ here by award (Contractor) ____________________ with a Final Completion Certificate for their work at __________________________.
The work has been deemed complete and satisfactory according to the Scope of Work. Any and all remaining payments are authorized to be released to the contractor.
Signature _________________________ Date_______________________ 1 | Page 5 | Page image1.png image2.png