RFQ Summary: Santa Fe Regional Airport Airfield Preservation Rehabilitation, Maintenance and Design

This is a Request for Qualifications (RFQ) issued by the City of Santa Fe, New Mexico, Central Purchasing Division and Santa Fe Regional Airport (RFQ#: FY27-RFQ-094) soliciting qualified architectural and engineering (A&E) firms to provide professional design services for airfield preservation, rehabilitation, and maintenance projects. The Santa Fe Regional Airport operates two primary runways—Runway 02/20 (8,366 feet long, 150 feet wide) and Runway 15/33 (6,316 feet long, 100 feet wide)—plus a tertiary runway serving general aviation. The scope of work encompasses multiple projects including Runway Safety Area (RSA) grading improvements for both runways, pavement preservation and rehabilitation, Runway 02/20 improvements potentially including extension or reconstruction, development of a comprehensive Pavement Maintenance Plan (PMP), an Airfield Marking Maintenance Plan, and airfield rubber removal strategies. The selected firm will also provide professional planning services, architectural and civil engineering design, geotechnical investigations, electrical engineering, and construction administration support. The RFQ was issued November 10, 2026, with a pre-proposal meeting scheduled for November 13, 2026 (non-mandatory). Written questions are due November 17, 2026 at 5:00 PM, with responses provided November 19, 2026. Proposals are due November 23, 2026 at 3:00 PM via electronic submission through OpenGov. The evaluation process concludes with contract award anticipated December 9, 2026. The resulting contract will have an initial term of four (4) years with an option to renew for up to eight (8) additional years.

Pricing terms are not specified in the RFQ; hourly rates for contractor personnel will be proposed and evaluated as part of the technical proposal. No set-asides are identified in the procurement. Offerors must comply with the City of Santa Fe's Living Wage Ordinance and demonstrate financial stability through independently audited financial statements. The evaluation will be qualification-based, with scoring distributed across Organizational Experience (300 points, 30%), Organizational References (200 points, 20%), Mandatory Specifications (400 points, 40%), and Oral Presentations (100 points, 10%). All work must comply with FAA Advisory Circulars, 14 CFR Part 139, TSA requirements, New Mexico state regulations, and local codes. Offerors must provide minimum three (3) business references from similar projects completed within the last three years and submit an Organizational Reference Questionnaire to be completed directly by references. Funding source is not explicitly identified, though FAA funding eligibility and requirements are referenced as considerations for the contractor's expertise. The Procurement Manager is Sebastian Gallegos, Airport Project Manager, contactable at sfgallegos@santafenm.gov or 505-695-3538.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The City of Santa Fe (City), Central Purchasing Division (CPD)

AND

Airport

REQUEST FOR PROPOSALS (RFP)

RFP#: FY27-RFQ-094 - Santa Fe Regional Airport Airfield

Preservation Rehabilitation, Maintenance and Design

Table Of Contents

1. INTRODUCTION

2. CONDITIONS GOVERNING THE PROCUREMENT

3. RESPONSE FORMAT AND ORGANIZATION

4. SCOPE OF WORK

5. EVALUATION

6. EVALUATION PHASES

7. VENDOR QUESTIONNAIRE

8. ATTACHMENTS

I. INTRODUCTION

PURPOSE OF THIS RFQ

The Santa Fe Regional Airport (Airport) is soliciting qualification-based proposals from qualified architectural and engineering (A&E) firms to provide professional design services for multiple airfield preservation, rehabilitation, and maintenance projects.

Runway 02/20 is the Airport's primary runway and serves as the designated runway for commercial airline arrivals and departures, including regional jet operations. During the Federal Aviation Administration's (FAA) most recent annual inspection, deficiencies and areas requiring corrective action were identified on both

Runway 02/20 and the secondary Runway 15/33. These findings, along with the Airport's ongoing infrastructure preservation needs, have established the need for professional A&E services to evaluate existing conditions, develop appropriate design solutions, and prepare plans and specifications for the required improvements.

The projects requiring attention include, but are not limited to, the following:

A. Runway Safety Area (RSA) Grading Improvements: Evaluate and develop corrective grading improvements to address deficiencies within the RSAs for Runways 02/20 and 15/33.

B. Runway Pavement Preservation: Evaluate pavement conditions and develop preservation and rehabilitation improvements for Runways 02/20 and 15/33.

C. Runway 02/20 Improvements: Evaluate alternatives and develop design plans for improvements to

Runway 02/20, which may include runway extension, rehabilitation, or reconstruction.

D. Pavement Maintenance Plan (PMP): Develop a comprehensive pavement maintenance plan to support the ongoing assessment, preservation, and management of airport pavement infrastructure.

E. Airfield Marking Maintenance Plan: Develop a maintenance plan for airfield pavement markings to ensure continued visibility, compliance, and operational safety.

F. Airfield Rubber Removal: Evaluate existing rubber accumulation and develop appropriate removal and maintenance strategies to maintain runway surface conditions and operational safety.

The selected A&E firm will be expected to provide the professional expertise necessary to evaluate existing conditions, assess alternatives, develop recommendations, and prepare the required engineering designs, plans, specifications, and related deliverables for these projects. The overall objective is to maintain and improve the safety, operational efficiency, and long-term reliability of the Airport's airfield infrastructure.

BACKGROUND INFORMATION

The Santa Fe Regional Airport was originally constructed in 1945 and has served as a primary source of commercial air transportation for Santa Fe and Northern New Mexico. As commercial aviation activity and passenger demand have grown, the need for continued infrastructure maintenance, rehabilitation, and expansion has become increasingly important to accommodate current operations and future growth.

The airport's original development included approximately five miles of combined runway length and infrastructure designed to accommodate some of the military's heaviest aircraft. In 1957, a major airport expansion was completed through a joint effort between the City of Santa Fe and Santa Fe County, establishing what was then known as the Santa Fe Municipal Airport. This expansion included significant improvements to the airfield, particularly the runways, taxiways, and airline terminal apron.

The first major runway rehabilitation, which included resurfacing, took place in 1972 to support the airport's continued operational needs and anticipated growth. Subsequent rehabilitation of Runway 02/20 included resurfacing in 2005 and milling and overlay work in 2017.

The airport currently operates two primary runways:

• Runway 02/20: 8,366 feet long and 150 feet wide.

• Runway 15/33: 6,316 feet long and 100 feet wide.

Given the airport's continued growth and the ongoing demands placed on its infrastructure, maintaining, modernizing, and expanding airport facilities is essential to ensuring the continued safety, efficiency, and reliability of airport operations.

SCOPE OF PROCUREMENT

The resulting contract will result in a professional services contract with an initial term of four (4) years with the option to renew up to eight (8) years.

PROCUREMENT MANAGER

The Santa Fe Regional Airport has assigned a Procurement Manager who is responsible for the conduct of this procurement whose name, address, telephone number, and email address are listed below:

Name Sebastian Gallegos, Airport Project Manager

Telephone Number 505-695-3538

Email sfgallegos@santafenm.gov

1. Any inquiries or requests regarding this procurement should be submitted via the OpenGov

Procurement Portal at https://procurement.opengov.com/portal/santafenm/projects/299974.

DEFINITION OF TERMINOLOGY

This section contains definitions of terms used throughout this procurement document, including appropriate abbreviations:

A. “Addendum” means a written or electronic document issued by the City to modify, clarify, or supplement the information in the original RFQ prior to the proposal due date. This may also be called

Amendment or RFQ Amendment.

B. “Amended Proposal” means a revised and complete version of a proposal submitted by an Offeror prior to the proposal due date, clearly labeled as superseding the original submission.

C. “Authorized Purchaser” means an individual authorized by a Participating Entity to place orders against this contract.

https://procurement.opengov.com/portal/santafenm/projects/299974

D. “Award” means the point at which the contract document has been fully executed. See also “Contract” and “Final Award”.

E. “Evaluation” means an evaluation process in which identifying information is removed from proposals to ensure objective scoring by the Evaluation Committee.

F. “Business Hours” means the normal business hours of the Requesting department; 8:00 AM through

5:00 PM Mountain Standard or Daylight Time, whichever is in effect on the date given.

G. “Central Purchasing Division” or “CPD” means the City office responsible for overseeing and managing the procurement of tangible personal property, services, and construction, including ensuring compliance with applicable procurement laws, policies, and procedures.

H. “Chief Procurement Officer” or “CPO” means that person within the CPD who is responsible for the control of procurement of items of tangible personal property, services, or construction.

I. “City” means the City of Santa Fe, New Mexico which in the procurement context may act through the

Finance Director, City Manager, or Governing Body.

J. “Close of Business” means the normal close of business of the Requesting Department; 5:00

PM Mountain Time.

K. “Confidential” means confidential financial information concerning Offeror’s organization and data that qualifies as a trade secret in accordance with the Uniform Trade Secrets Act NMSA 1978, Sections

57-3-A-1 through 57-3A-7. The following items may not be labelled as confidential: Offeror’s submitted Cost response, Staff/Personnel Resumes/Bios (excluding personal information such as personal telephone numbers and/or home addresses), and other submitted data that is not confidential financial information or that qualifies under the Uniform Trade Secrets Act.

L. “Contract” means any agreement or Price Agreement for the procurement of items of tangible personal property, services, or construction.

M. “Contractor” means any business having a contract with the City of Santa Fe.

N. “Department” means the Requesting Department sponsoring this Procurement.

O. “Determination” means the written documentation of a decision of a procurement officer including findings of fact required to support a decision. A determination becomes part of the procurement file to which it pertains.

P. “Desirable” the terms “may,” “can,” “should,” “preferably,” or “prefers,” identify a desirable or discretionary item or factor.

Q. “Electronic Submission” means a successful submittal of Offeror’s proposal consisting of text, images or both readable on computers or other electronic devices.

R. “Evaluation Committee” means a body appointed to perform the evaluation of Offerors’ proposals.

S. “Evaluation Committee Report” means a report prepared by the Procurement Manager and the

Evaluation Committee to support the Committee’s recommendation for contract award. It will contain scores and written evaluations of all responsive Offeror proposals.

T. “Final Award” means the point at which the contract(s) resulting from this RFQ have been fully executed through the final required signature—either by the City Manager or City Mayor, depending on the contract amount—thereby making the contract(s) legally binding. See also “Contract.”

U. “Finalist” means an Offeror who meets all the mandatory specifications of this RFQ and whose score on evaluation factors is sufficiently high to merit further consideration by the Evaluation Committee.

V. “Hourly Rate” means the proposed fully loaded maximum hourly rates that include travel, per diem, fringe benefits and any overhead costs for contractor personnel, as well as subcontractor personnel if appropriate.

W. “IT” means Information Technology.

X. “Living Wage” means the minimum hourly wage established by the City of Santa Fe’s Living Wage

Ordinance, which contractors must comply with, as posted at https://santafenm.gov/economic-development/business-resources/living-wage-information.

Y. “Mandatory” the terms “must,” “shall,” “will,” “is required,” or “are required,” identify a mandatory item or factor. Failure to meet a mandatory item or factor may result in the rejection of the Offeror’s proposal.

Z. “Minor Irregularities” means anything in the proposal that does not affect the price, quality and/or quantity, or any other mandatory requirement.

AA. “Offeror” means any person, corporation, or partnership who chooses to submit a proposal.

BB. “OpenGov” means the City of Santa Fe’s official electronic procurement platform used to post solicitations, receive vendor proposals, facilitate communication with Offerors, and manage procurement activities in a transparent, streamlined, and auditable manner.

CC. “Procurement Manager” or “PM” means any person authorized by both the CPD and the

Requesting Department to facilitate the procurement process and/or administer the resulting contract(s).

The Procurement Manager is responsible for managing all aspects of the procurement, including planning and coordinating all related events; ensuring that all required information is provided to potential offerors, the Evaluation Committee, and CPD; and preparing and processing the Evaluation

Committee Report. The Procurement Manager ensures compliance with all applicable requirements and serves as the primary point of contact throughout the procurement lifecycle. The Procurement Manager is the sole point of contact for all communication related to the procurement. Potential offerors, City staff, and CPD must direct all questions or information through the PM. Staff in the Requesting

Department must rely on the PM to serve as the liaison between their department and CPD to maintain consistency, transparency, and compliance. When questions, challenges, or issues arise during the procurement process, the Procurement Manager should consult with CPD for guidance. CPD is available https://santafenm.gov/economic-development/business-resources/living-wage-information https://santafenm.gov/economic-development/business-resources/living-wage-information to support and facilitate the RFQ process and to assist the Procurement Manager in ensuring a smooth, fair, and compliant procurement.

DD. “Project” means a temporary process undertaken to solve a well-defined goal or objective with clearly defined start and end times, a set of clearly defined tasks, and a budget. The project terminates once the project scope is achieved, and project acceptance is given by the project executive sponsor.

EE. “Proposal” means all documents submitted by respondents/offerors/firms, including those attached or incorporated by reference, used in response to a Request for Qualifications.

FF. “Protest” means a formal, written objection to a solicitation or contract award, submitted in accordance with NMSA 1978, Section 13-1-172 and Procurement Manual, to the Protest Manager identified in this

RFQ.

GG. “Request for Qualifications” or “RFQ” means the qualification-based proposal procurement method used to select Architects, Engineers, Landscape Architects, Surveyors and Construction

Manager at Risk.

HH. “Requesting Department” means the City Department responsible for overseeing the work or delivery of tangible personal property by a contractor.

II. “Responsible Offeror” means an Offeror who submits a responsive proposal and who, when required, provides information and documentation demonstrating that their financial resources, production or service facilities, personnel, reputation, and experience are sufficient to ensure satisfactory delivery of the services or tangible personal property described in the proposal.

JJ. “Responsive Offer” means an Offeror whose proposal conforms in all material respects to the requirements set forth in the RFQ. Material aspects of the RFQ include, but are not limited to, price, quality, quantity, delivery requirements, and compliance with all mandatory specifications, terms, and conditions necessary for fair and complete evaluation.

KK. “Sealed” means, in terms of electronic submission, an Offeror’s proposal and all accompanying documents have been completely and successfully uploaded into the City’s designated procurement platform—such as OpenGov—prior to the submission deadline stated in this RFQ.

LL. “Staff” refers to any individual employed by an Offeror, whether on a full-time, part-time, or independent contractor basis.

MM. “Subcontractor” means any person or business entity, other than an employee of the

Contractor, that performs part of the work or provides goods or services under the contract resulting from this RFQ.

NN. “Written” means typewritten on standard 8 ½ x 11-inch paper. Larger paper is permissible for charts, spreadsheets, etc.

PROCUREMENT LIBRARY

A procurement library has been established. Offerors are encouraged to review the material contained in the

Procurement Library by viewing the attachment section of the solicitation. The library contains information listed below:

Electronic version of RFQ, Questions & Answers, RFQ Amendments, etc.

https://procurement.opengov.com/portal/santafenm/projects/299974

II. CONDITIONS GOVERNING THE PROCUREMENT

This section of the RFQ contains the schedule of events, the descriptions of each event, and the conditions governing this procurement.

TIMELINE

Issue RFQ: November 10, 2026

Pre-Proposal Meeting (Non-Mandatory): November 13, 2026, 1:30pm https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZDE1NWE3MTYtY2R kYS00ZGZkLTljYWUtYzliM2UwZjY2ND

M3%40thread.v2/0?context=%7b%22Tid%

22%3a%2277b69f5a-55ed-4363-8616-

4867b0bc707f%22%2c%22Oid%22%3a%2

28d3a19bb-3961-4588-8915-

1014f4def1c1%22%7d

Deadline for Written Questions: November 17, 2026, 5:00pm

Response to Written Questions: November 19, 2026, 5:00pm

Proposals Due Date: November 23, 2026, 3:00pm

Evaluation*: November 24, 2026

Selection of Finalists*: November 25, 2026

Oral Presentations*: November 30, 2026

Finalize Contracts*: December 4, 2026

Contract Award*: December 9, 2026

EXPLANATION OF EVENTS

The following paragraphs describe the activities listed in the timeline

The City reserves the right to:

https://procurement.opengov.com/portal/santafenm/projects/299974 https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZDE1NWE3MTYtY2RkYS00ZGZkLTljYWUtYzliM2UwZjY2NDM3%40thread.v2/0?context=%7b%22Tid%22%3a%2277b69f5a-55ed-4363-8616-4867b0bc707f%22%2c%22Oid%22%3a%228d3a19bb-3961-4588-8915-1014f4def1c1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZDE1NWE3MTYtY2RkYS00ZGZkLTljYWUtYzliM2UwZjY2NDM3%40thread.v2/0?context=%7b%22Tid%22%3a%2277b69f5a-55ed-4363-8616-4867b0bc707f%22%2c%22Oid%22%3a%228d3a19bb-3961-4588-8915-1014f4def1c1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZDE1NWE3MTYtY2RkYS00ZGZkLTljYWUtYzliM2UwZjY2NDM3%40thread.v2/0?context=%7b%22Tid%22%3a%2277b69f5a-55ed-4363-8616-4867b0bc707f%22%2c%22Oid%22%3a%228d3a19bb-3961-4588-8915-1014f4def1c1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZDE1NWE3MTYtY2RkYS00ZGZkLTljYWUtYzliM2UwZjY2NDM3%40thread.v2/0?context=%7b%22Tid%22%3a%2277b69f5a-55ed-4363-8616-4867b0bc707f%22%2c%22Oid%22%3a%228d3a19bb-3961-4588-8915-1014f4def1c1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZDE1NWE3MTYtY2RkYS00ZGZkLTljYWUtYzliM2UwZjY2NDM3%40thread.v2/0?context=%7b%22Tid%22%3a%2277b69f5a-55ed-4363-8616-4867b0bc707f%22%2c%22Oid%22%3a%228d3a19bb-3961-4588-8915-1014f4def1c1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZDE1NWE3MTYtY2RkYS00ZGZkLTljYWUtYzliM2UwZjY2NDM3%40thread.v2/0?context=%7b%22Tid%22%3a%2277b69f5a-55ed-4363-8616-4867b0bc707f%22%2c%22Oid%22%3a%228d3a19bb-3961-4588-8915-1014f4def1c1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZDE1NWE3MTYtY2RkYS00ZGZkLTljYWUtYzliM2UwZjY2NDM3%40thread.v2/0?context=%7b%22Tid%22%3a%2277b69f5a-55ed-4363-8616-4867b0bc707f%22%2c%22Oid%22%3a%228d3a19bb-3961-4588-8915-1014f4def1c1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZDE1NWE3MTYtY2RkYS00ZGZkLTljYWUtYzliM2UwZjY2NDM3%40thread.v2/0?context=%7b%22Tid%22%3a%2277b69f5a-55ed-4363-8616-4867b0bc707f%22%2c%22Oid%22%3a%228d3a19bb-3961-4588-8915-1014f4def1c1%22%7d

A. Change or extend the Proposals Due Date.

B. Revise the RFQ document prior to the due date.

The City will process an addenda if it is determined that modifications, clarifications, or additions to the RFQ are necessary. The addenda will be announced via email to registered Potential Offerors that have selected the corresponding commodity code used for this event.

A. Issue RFQ

This RFQ is being issued on behalf of the City on the date indicated in the timeline.

B. Pre-Proposal Meeting

A Pre-Proposal Meeting will be held as indicated in the Timeline, beginning at 1:30PM MST/MDT via

MS Teams. Potential Offeror(s) are encouraged to submit written questions in advance of the conference to the CPD and the Procurement Manager via the OpenGov Procurement Portal.

Additional written questions may be submitted at the Meeting. All questions answered during the Pre-

Proposal Meeting will be considered unofficial until they are posed in writing. All written questions will be addressed in writing on the date listed in the Timeline. A public log will be kept of the names of potential Offeror(s) that attended the Pre-Proposal Meeting.

Attendance at this meeting is highly recommended, but not a prerequisite for submission of a proposal.

C. Deadline for Written Questions

Potential Offerors may submit written questions to CPD and the Procurement Manager as to the intent or clarity of this RFQ as indicated in Section the Timeline. All written questions must be submitted via the

OpenGov Procurement Portal. Questions shall be clearly labeled and shall cite the Section(s) in the RFQ or other document which form the basis of the question.

D. Responses to Written Questions

Responses to the written questions will be provided on OpenGov, on or before the date indicated in the

Timeline.

E. Proposals Due Date

Only electronic proposal submission is allowed.

ALL PROPOSALS MUST BE SUBMITTED FOR REVIEW AND EVALUATION BY THE CPD

AND EVALUATION COMMITTEE VIA UPLOAD.

Pursuant to NMSA 1978, Section 13-1-116, the contents of proposals shall not be disclosed to competing Offerors during the negotiation process. The negotiation process is deemed to be in effect until the contract is awarded pursuant to this RFQ. Awarded in this context means approved by the City

Manager or Mayor.

F. Evaluation

An Evaluation Committee will perform the evaluation of proposals. This process will take place as indicated in the timeline, depending upon the number of proposals received. During this time, CPD or/and the Procurement Manager may initiate discussions with Offerors who submit responsive or potentially responsive proposals for the purpose of clarifying aspects of the proposals. However, proposals may be accepted and evaluated without such discussion. Discussions SHALL NOT be initiated by the Offerors.

G. Selection of Finalists

The Evaluation Committee will select, and the Procurement Manager will notify the finalist Offerors as per the timeline or as soon as possible thereafter. A schedule for Oral Presentation, if any, will be determined at this time. Finalists will be comprised of the three (3) Offerors receiving the highest cumulative scores in the following Sections: Organizational Experience, Organizational References, and

Mandatory Specifications.

H. Oral Presentations

Finalist Offerors may be required to conduct an oral presentation at a venue to be determined as per the timeline or as soon as possible thereafter. If oral presentations are held, Finalist Offerors may be required to make their presentations through electronic means (GoToMeeting, Zoom, etc.). The

Procurement Manager will provide Finalist Offerors with applicable details. Whether or not Oral

Presentations will be held is at the discretion of the Evaluation Committee and CPD.

I. Finalize Contracts

After approval of the Evaluation Committee Report, any contractual agreement(s) resulting from this

RFQ will be finalized with the most advantageous Offeror(s), taking into consideration the evaluation factors set forth in this RFQ, as per Section the Timeline or as soon as possible thereafter. The most advantageous proposal may or may not have received the most points. In the event mutually agreeable terms cannot be reached with the apparent most advantageous Offeror in the timeframe specified, the

City of Santa Fe reserves the right to finalize a contractual agreement with the next most advantageous

Offeror(s) without undertaking a new procurement process.

J. Contract Awards

Upon receipt of the signed contract, the Department will award pursuant to the Timeline, or as soon as possible thereafter. The award is subject to appropriate Department and City Manager/Governing Body or Board approval. Contractors must not commence work until the Department issues them a Purchase

Order (PO) and instructions to start.

K. Protest Deadline

Any protest by an Offeror pertaining to the solicitation or award must be submitted within 15 days from the notice of solicitation or award and in conformance with NMSA 1978, Section 13-1-172 and applicable procurement regulations. As a Protest Manager has been named in this RFQ, pursuant to

NMSA 1978, Section 13-1-172 and Procurement Manual Section Y, ONLY protests delivered directly to the Protest Manager in writing and in a timely fashion will be considered to have been submitted properly and in accordance with statute, rule, and this RFQ. The 15-calendar day protest period shall begin on the day following the notice of award of contract(s) and will end at 5:00 pm MST/MDT on the

15th day. Protests must be written and must include the name and address of the protestor and the RFQ number. The protest must include a detailed statement of the grounds for the protest, along with any relevant supporting documentation. It should also clearly state the specific ruling being requested from the party listed below. The protest must be delivered to:

Travis Dutton-Leyda, CPO

City of Santa Fe purchasing@santafenm.gov

PROTESTS RECEIVED AFTER THE DEADLINE WILL NOT BE ACCEPTED.

General Requirements

A. Acceptance of Conditions Governing the Procurement

By submitting a proposal in response to this RFQ, Offerors acknowledge and agree to all Conditions

Governing the Procurement, as outlined herein.

B. Incurring Cost

All costs incurred by an Offeror in the preparation, submission, transmittal, or presentation of a proposal—including any related materials—are the sole responsibility of the Offeror. Additionally, any costs associated with the setup, demonstration, or evaluation of proposed equipment, products, or systems shall be borne entirely by the Offeror.

C. Prime Contractor Responsibility

By receiving a contract resulting from this RFQ, each awarded Contractor is solely responsible for fulfilling all contractual requirements with the City. The City will make payments only to the

Contractor(s) named in the executed agreement(s) and will not be responsible for any payments to subcontractors, third parties, or for any ancillary costs such as taxes, permits, or fees.

D. Subcontractors/Consent

The use of subcontractors is allowed. The prime contractor shall be wholly responsible for the entire performance of the contract whether subcontractors are used. Additionally, the prime contractor must receive approval, in writing, from the City before any subcontractor is used during the term of the resultant contract.

E. Amended Proposals

Offerors may submit amended proposals at any time prior to the Proposal Due Date. Each amended submission must serve as a complete replacement of the original proposal. Amendments may be submitted in response to changes issued by the City or to reflect revisions made independently by the

Offeror. To ensure clarity during evaluation, all amended proposals must be clearly labeled as such and must explicitly state that they supersede any previously submitted versions. The City will evaluate only mailto:purchasing@santafenm.gov the most recent, complete version submitted prior to the deadline. City staff will not merge, collate, or otherwise combine materials from multiple submissions.

F. Proposal Withdrawal

Offerors may withdraw their proposals at any time prior to the Proposal Due Date. A written request to withdraw must be submitted via email, addressed to the CPD and the Procurement Manager, and signed by a duly authorized representative of the Offeror. Withdrawal requests received after the Proposal Due

Date will be subject to applicable procurement regulations and are not guaranteed to be accepted.

G. Proposal Offer Firm

Responses to this RFQ, including proposal prices for services, will be considered firm for one-hundred eighty (180) days after the due date for receipt of proposals or one-hundred eighty (180) days after the due date for the receipt of a best and final offer, if the Offeror is invited or required to submit one.

H. Disclosure of Proposal Contents

The contents of all submitted proposals will be kept confidential until the final award has been completed by the City. At that time, all proposals and documents pertaining to the proposals will be available for public inspection, except for proprietary or confidential material as follows:

1. Proprietary and Confidential information is restricted to:

a. confidential financial information concerning the Offeror’s organization; and

b. information that qualifies as a trade secret in accordance with the Uniform Trade Secrets Act, NMSA 1978, Sections 57-3A-1 through 57-3A-7.

2. An additional but separate redacted version of Offeror’s proposal shall be submitted containing the blacked-out proprietary or confidential information, to facilitate eventual public inspection of the non-confidential version of Offeror’s proposal.

IMPORTANT: The price of products offered, or the cost of services proposed SHALL NOT be designated as proprietary or confidential information.

If a request is received for disclosure of proprietary or confidential materials, the City Attorney and the CPO shall examine the request and make a written determination that specifies which portions of the proposal should be disclosed. Unless the Offeror takes legal action to prevent the disclosure, the proposal will be so disclosed. The proposal shall be open to public inspection subject to any continuing prohibition on the disclosure of proprietary or confidential information.

I. No Obligation

This RFQ in no manner obligates the City to the use of any Offeror’s services until a valid written contract is awarded and approved by appropriate authorities.

J. Termination

This RFQ may be canceled at any time and all proposals may be rejected in whole or in part when the

City determines such action to be in the best interest of the City of Santa Fe.

K. Sufficient Appropriation

Any contract awarded because of this RFQ process may be terminated if sufficient appropriations or authorizations do not exist. Such terminations will be affected by sending written notice to the contractor. The City’s decision as to whether sufficient appropriations and authorizations are available will be accepted by the contractor as final.

L. Legal Review

The City requires that all Offerors agree to be bound by the General Requirements contained in this

RFQ. Any Offeror’s concerns must be promptly submitted in writing to the attention of the CPD and the

Procurement Manager.

M. Governing Law

This RFQ and any agreement with an Offeror which may result from this procurement shall be governed by the laws of the State of New Mexico.

N. Basis for Proposal

Only information supplied in writing by the CPD and the Procurement Manager or contained in this

RFQ shall be used as the basis for the preparation of Offeror proposals.

O. Contract Terms and Conditions

The contract between the City and a contractor will follow the format specified by the City and contain the terms and conditions set forth in the Draft Contract. However, the City reserves the right to negotiate provisions in addition to those contained in this RFQ Draft Contract with any Offeror. The contents of this RFQ, as revised and/or supplemented, and the successful Offeror’s proposal will be incorporated into and become part of any resultant contract.

The City discourages exceptions from the contract terms and conditions as set forth in the Draft

Contract. Such exceptions may cause a proposal to be rejected as nonresponsive when, in the sole judgment of the City (and its evaluation team), the proposal appears to be conditioned on the exception, or correction of what is deemed to be a deficiency, or an unacceptable exception is proposed which would require a substantial proposal rewrite to correct.

Should an Offeror object to any of the terms and conditions as set forth in the RFQ Draft Contract strongly enough to propose alternate terms and conditions despite the above, the Offeror must propose specific alternative language. The City may or may not accept the alternative language. General references to the Offeror’s terms and conditions or attempts at complete substitutions of the Draft

Contract are not acceptable to the City and will result in disqualification of the Offeror’s proposal.

Offerors must provide a brief discussion of the purpose and impact, if any, of each proposed change followed by the specific proposed alternate wording.

If an Offeror fails to propose any alternate terms and conditions during the procurement process (the

RFQ process prior to selection as successful Offeror), no proposed alternate terms and conditions will be considered later during the negotiation process. Failure to propose alternate terms and conditions during the procurement process (the RFQ process prior to selection as successful Offeror) is an explicit agreement by the Offeror that the contractual terms and conditions contained herein are accepted by the

Offeror.

P. Offeror’s Terms and Conditions

Offerors must include with their proposal and/or during clarification phase a complete list of any additional/modified terms and conditions they wish to have considered for inclusion in the final contract.

Offerors must clearly identify the specific section(s) of the City’s draft contract they propose to modify and provide the exact language they wish to substitute or add. Failure to submit proposed terms at the time of proposal submission may result in the City deeming those terms waived during contract negotiations.

Q. Contract Deviations

Any additional terms and conditions, which may be the subject of negotiation (such terms and conditions having been proposed during the procurement process, that is, the RFQ process prior to selection as successful Offeror), will be discussed only between the City and the Offeror selected and shall not be deemed an opportunity to amend the Offeror’s proposal.

R. Offeror Qualifications

The Evaluation Committee may make such investigations as necessary to determine the ability of the potential Offeror to adhere to the requirements specified within this RFQ. The Evaluation Committee will reject the proposal of any potential Offeror who is not a Responsible Offeror or fails to submit a

Responsive Offer as defined in NMSA 1978, Sections 13-1-83 and 13-1-85.

S. Right to Waive Minor Irregularities

The Evaluation Committee, upon approval from the CPO, reserves the right to waive minor irregularities. The Evaluation Committee also reserves the right to waive mandatory requirements, if all of the otherwise responsive proposals failed to meet the same mandatory requirements and the failure to do so does not otherwise materially affect the procurement. This right is at the sole discretion of the

Evaluation Committee and CPO.

T. Change in Contractor Representatives

The City reserves the right to require a change in the contractor’s assigned representative if, in the City’s judgment, the individual is not adequately meeting the City’s needs. If multiple representatives are assigned, the City may require changes to any or all of them as deemed necessary.

U. Notice of Penalties

NMSA 1978, Sections 13-1-28 through 13-1-199, imposes civil, and misdemeanor and felony criminal penalties for its violation. In addition, the New Mexico criminal statutes impose felony penalties for bribes, gratuities, and kickbacks.

V. City’s Rights

The City, in agreement with the Evaluation Committee reserves the right to accept all or a portion of a potential Offeror's proposal.

W. Right to Publish

Throughout the duration of this procurement process and contract term, Offerors and contractors must secure from the City written approval prior to the release of any information that pertains to the potential work or activities covered by this procurement and/or City contracts deriving from this procurement.

Failure to adhere to this requirement may result in disqualification of the Offeror’s proposal or removal from the contract.

X. Ownership of Proposals

All documents submitted in response to the RFQ shall become property of the City. If the RFQ is cancelled, the electronic record shall be closed, and all proposals shall remain confidential.

Y. Confidentiality

Any confidential information provided to, or developed by, the contractor in the performance of the contract resulting from this RFQ shall be kept confidential and shall not be made available to any individual or organization by the contractor without the prior written approval of the City.

The Contractor(s) agrees to protect the confidentiality of all confidential information and not to publish or disclose such information to any third party without the City’s written permission.

Z. Electronic Mail Address Required

A large part of the communication regarding this procurement will be conducted by electronic mail

(email). Offeror must be registered and have a valid email address to receive correspondences.

AA. Use of Electronic Versions of This RFQ

This RFQ is being made available by electronic means. In the event of conflict between a version of the

RFQ in the Offeror’s possession and the version maintained by the CPD, the Offeror acknowledges that the version maintained by the CPD shall govern. Please refer to:

https://procurement.opengov.com/portal/santafenm/projects/299974

BB. Campaign Contribution Disclosure Form

Offeror must complete, sign, and return the Campaign Contribution Disclosure Form, as a part of their proposal. This requirement applies regardless of whether a covered contribution was made or not made for the positions of Governor and Lieutenant Governor, City Officials or other identified official. Failure to complete and return the signed, unaltered form will result in Offeror’s disqualification.

CC. Disclosure Regarding Responsibility

1. Any prospective Contractor and any of its Principals who enter a contract greater than sixty thousand dollars ($60,000.00) with any state agency or local public body for professional services, tangible personal property, services or construction agrees to disclose whether the Contractor, or any principal of the Contractor’s company:

a. is presently debarred, suspended, proposed for debarment, or declared ineligible for award of contract by any federal entity, state agency or local public body;

b. has within a three-year period preceding this offer, been convicted in a criminal matter or had a civil judgment rendered against them for:

i. the commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (federal, state or local) contract or subcontract;

ii. violation of Federal or state antitrust statutes related to the submission of offers; or https://procurement.opengov.com/portal/santafenm/projects/299974

iii. the commission in any federal or state jurisdiction of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, tax evasion, violation of

Federal criminal tax law, or receiving stolen property;

c. is presently indicted for, or otherwise criminally or civilly charged by any (federal state or local) government entity with the commission of any of the offenses enumerated in paragraph A of this disclosure;

d. has, preceding this offer, been notified of any delinquent Federal or state taxes in an amount that exceeds $3,000.00 of which the liability remains unsatisfied. Taxes are considered delinquent if the following criteria apply.

i. The tax liability is finally determined. The liability is finally determined if it has been assessed. A liability is not finally determined if there is a pending administrative or judicial challenge. In the case of a judicial challenge of the liability, the liability is not finally determined until all judicial appeal rights have been exhausted.

ii. The taxpayer is delinquent in making payment. A taxpayer is delinquent if the taxpayer has failed to pay the tax liability when full payment was due and required. A taxpayer is not delinquent in cases where enforced collection action is precluded.

iii. Have within a three-year period preceding this offer, had one or more contracts terminated for default by any federal or state agency or local public body.)

2. Principal, for the purpose of this disclosure, means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity or related entities.

3. Following award, the Contractor shall promptly provide written notice to the individuals listed in the contract’s Notice section if, at any time during the term of the contract, the Contractor becomes aware that any part of its prior disclosure was inaccurate or has become inaccurate due to changed circumstances.

4. Disclosure of any relevant circumstances under this requirement will not automatically result in termination of the contract. However, such disclosures will be considered when evaluating the

Contractor’s responsibility and capacity to perform under the contract. Failure to provide a required disclosure, or to submit additional information upon request, may result in a determination that the

Offeror is nonresponsive

5. Nothing contained in the foregoing shall be construed to require establishment of a system of records to render, in good faith, the disclosure required by this document. The knowledge and information of a Contractor is not required to exceed that which is the normally possessed by a prudent person in the ordinary course of business dealings.

6. The disclosure requirement provided is a material representation of fact upon which reliance was placed when making an award and is a continuing material representation of the facts during the term of this Agreement. If during the performance of the contract, the Contractor is indicted for or otherwise criminally or civilly charged by any government entity (federal, state, or local) with commission of any offenses named in this document the Contractor must provide immediate written notice to the CPO or other party to this Agreement. If it is later determined that the Contractor knowingly rendered an erroneous disclosure, in addition to other remedies available to the

Government, the CPO may terminate the involved contract for cause. Still further the CPO may suspend or debar the Contractor from eligibility for future solicitations until such time as the matter is resolved to the satisfaction of the CPO

DD. Local Preferences

Local Preferences shall not apply to this solicitation.

III. RESPONSE FORMAT AND ORGANIZATION

NUMBER OF RESPONSES

Offerors shall complete and submit only one response to this RFQ through OpenGov.

Confidential Information: If Offeror’s proposal contains confidential information, as defined in Definition of

Terminology, Offeror must submit two (2) separate ELECTRONIC technical files. Name the files accordingly:

• One (1) ELECTRONIC version of the requisite proposals identified above as Confidential

(unredacted)versions for evaluation purposes (example file name, Confidential Technical); and

• One (1) redacted (Public) ELECTRONIC, for the public file, in order to facilitate eventual public inspection of the non-confidential version of Offeror’s proposal. Redacted versions must be clearly marked as “REDACTED” or “CONFIDENTIAL” on the first page of the electronic file. (Example file name, Redacted/Confidential)

IV. SCOPE OF WORK

SOW

Santa Fe Regional Airport Airfield Preservation Rehabilitation, Maintenance and Design

The Santa Fe Regional Airport consists of three (3) runways: Runway 02/20, the primary runway; Runway

15/33, the secondary runway; and Runway 10/28, which primarily serves General Aviation (GA) operations.

The airfield also includes multiple taxiways, identified as Alpha, Delta, Delta 1, Foxtrot, Foxtrot 1, Foxtrot 2, Foxtrot 3, Golf, and Juliet.

The selected Firm shall furnish all labor, qualified personnel, supervision, equipment, software, transportation, and professional expertise necessary to perform the services required under this RFQ.

Specific assignments and project requirements will be established and authorized through individual task orders issued by the Airport. Each task order will identify the applicable scope of work, required deliverables, schedule, and other project-specific requirements.

Projects will be designated on priority per the airport's directive include, but are not limited to:

• Grading and Slant Surveying on Runway Safety Areas (RSA) of 02/20 and 15/33

• Runway Safety Area (RSA) Improvements of 02/20 and 15/33

• Pavement Rehab of Runway 02/20 and 15/33

• Pavement Preservation on Runway 02/20 and 15/33

• Airfield Lighting Improvements and Electrical Vault

• Rubber Removal on Runway 02/20 and 15/33

Services may include, but are not limited to, the following:

1. Professional Planning Services

• Review existing conditions, facilities, infrastructure, and available project information

• Meet with Airport staff to identify project needs, goals, and priorities

• Develop preliminary project concepts and recommendations

• Assist with project scope development and identification of required design and construction services

• Prepare preliminary project cost estimates and budget recommendations

• Develop preliminary project schedules and identify major project milestones

• Identify potential permitting, environmental, regulatory, FAA, or other project requirements

• Coordinate with Airport staff, stakeholders, utilities, agencies, and other parties as needed

• Identify potential project risks, challenges, and construction impacts

• Provide recommendations regarding project phasing and implementation

• Assist the Airport with determining project priorities and funding needs

• Prepare planning documents, reports, exhibits, and other materials necessary to support project development and decision-making

• Airport Layout Plan (ALP) Updates

2. Architectural and Services

• Airfield rehab and improvements design

• Building code analysis and compliance, per State and Local Regulations

• Preparation of construction drawings and specifications

• Regulatory Compliances per FAA Advisory Circulars (AC's)

• Preparation of Construction Safety and Phasing Plan (CSPP)

3. Civil and Airfield Engineering

• Runway, taxiway, apron, and safety area improvements

• Pavement rehabilitation and reconstruction

• Drainage and stormwater system design

• Utility infrastructure improvements

• Grading and erosion control

• Airfield marking and signage improvements

4. Geotechnical and Materials

• Geotechnical investigations

• Soil borings

• Pavement cores

• Subgrade evaluation

• Materials testing

• Asphalt testing

• Concrete testing

• Pavement strength evaluation

• FWD testing, if appropriate

• Aggregate testing

• Compaction testing

• Construction materials inspection

5. Electrical Engineering

• Electrical distribution and lighting systems

• Emergency power and backup systems

6. Construction Administration and Support

• Bid phase assistance and responses to Request for Information (RFI)

• Review of contractor submittals and shop drawings

• Construction observation and inspection

• Project scheduling and coordination

• Change order review and recommendations

• Preparation of punch lists and closeout documentation

• Coordination with airport staff, tenants, contractors, and regulatory agencies

7. Emergency and Miscellaneous Services

• Rapid-response engineering evaluations

• Emergency repair design services

• Airfield condition assessments

• Grant support documentation

• As-built documentation and record drawings

• Other related professional services as required by the Airport

All work shall be performed in accordance with applicable FAA Advisory Circulars 14 CFR Part 139, TSA requirements 49 CRF Chapter XII, New Mexico state regulations, local codes, and Airport standards. The

Consultant shall coordinate closely with Airport staff to minimize operational disruptions and maintain safe airport operations throughout all phases of work. For any and all work conducted, hard copy and digital copies of as-built plans are required to be given to the Airport. The Consultant shall provide professional recommendations and planning information that will allow the Airport to make informed decisions before proceeding with Architect, Engineering, bidding, and construction services. Planning services may be requested on an as-needed basis for individual projects throughout the term of the agreement.

V. EVALUATION

TECHNICAL AND BUSINESS SPECIFICATIONS

TECHNICAL SPECIFICATIONS

Organizational Experience

Offeror must:

a. provide a detailed description of relevant corporate experience with city or state government and private sector. The experience of all proposed subcontractors must be described. The narrative must thoroughly describe how the Offeror has supplied expertise for similar contracts and must include the extent of their experience, expertise and knowledge as a provider of Architect and Engineer design of projects consistent with airport airfield projects including and compliance to all FAA, TSA, and all local regulations.

b. provide a detailed bio of all key personnel Offeror proposes to use in performance of the resulting contract, should Offeror be awarded. Key personnel is identified as any pertinent individuals that will be involved including any and all subcontractor. This information will be for all management and supervisory persons.

Offeror must include key personnel education, work experience, relevant certifications and licenses, and role the individual will be acting in.

Organizational References

Offeror must provide a list of a minimum of three (3) references from similar projects/programs performed for private, city, state, or large local government clients within the last three (3) years.

Offeror shall include the following Business Reference information as part of its proposals:

• airport name

• airport classification

• project name

• project cost

• consultant fee

• project completion date

• FAA funding source

• scope

• runway/taxiway involved

• firm's role

• key personnel involved

• Staff assigned to reference engagement that will be designated for work per this RFQ; and

• Client project manager name, telephone number, fax number and email address.

Offerors are required to submit Organizational Reference Questionnaires (“Questionnaire”), to the business references it lists. The business references must submit the Questionnaire directly to the designee identified. The business references must not return the completed Questionnaire to the Offeror. It is the

Offeror’s responsibility to ensure the completed forms are submitted on or before the date indicated in the

Timeline, for inclusion in the evaluation process.

Organizational References that are not received or are not complete, may adversely affect the Offeror’s score in the evaluation process. Offerors are encouraged to specifically request that their Organizational References provide detailed comments.

Mandatory Specifications

Offeror must:

a. describe their specialized design and technical competence of the business, including a joint venture or association, regarding the type of services required.

b. describe their capacity and capability of the business, including any consultants, their representatives, qualifications and locations, to perform the work, including any specialized services, within the time limitations.

c. describe their past record of performance on contracts with government agencies or private industry with respect to such factors as control of costs, quality of…