Sample Task 5 - HVAC Efficiency.pdf
PDF 30 MB Posted
- Attached to
- Wallops Multiple Award Construction (WMAC) II e-Library Federal contract opportunity
- Solicitation number
- Not on record
About this file
This document provides details on a federal contract opportunity related to HVAC efficiency improvements at Wallops Flight Facility. The National Aeronautics and Space Administration Goddard Space Center is seeking contractors through the Wallops Multiple Award Construction II e-Library to perform work outlined in solicitation number GSFCWMACIIeLibrary. The opportunity involves HVAC upgrades and efficiency measures at various facilities on Wallops Island, Virginia as supplemental work to RFP number 80GSFC21R0028. Interested parties can find additional requirement details and documentation through the Wallops MULTIPLE AWARD CONSTRUCTION II e-Library. The work is to be performed at Wallops Flight Facility and managed by NASA Goddard Space Center personnel.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sample Task 2 - E 106 Wall Repl.pdf | ||
| Sample List of Past WMAC Task O.pdf | ||
| Sample Task 4 - Wallops Airfiel.pdf | ||
| Sample Task 3 - E 105 Renovatio.pdf | ||
| Sample Task 1- Roof Replacement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sample Task # 5
HVAC Efficiency Improvements Project
Drawing / Specification Addendum
August 7, 2018
If the contractor makes any penetrations through the identified firewalls, the contractor shall comply with the following sealing requirements:
Furnish and install tested and listed firestopping systems, combination of materials, or devices to form an effective barrier against the spread of flame, smoke and gases, and maintain the integrity of fire resistance rated walls, partitions, floors, and ceiling-floor assemblies, including through-penetrations and construction joints and gaps.
Required installer qualifications:
a. FM Research approved in accordance with FM 4991, operating as a UL Certified Firestop
Contractor, or
b. Certified, licensed, or otherwise qualified by the firestopping manufacturer as having the necessary staff, training, and a minimum of 3 years experience in the installation of manufacturer's products in accordance with specified requirements. Submit documentation of this experience.
The following fire stop submittals are required and shall be submitted for approval prior to installation:
1. Firestopping Systems - Submit detail drawings including manufacturer's descriptive data, typical details conforming to UL Fire Resistance laboratory and installation instructions.
2. Product Data - Firestopping Materials.
3. Installer Qualifications - The installer shall obtain from the manufacturer and submit written certification of training.
The firestopped areas shall not be covered or enclosed until inspection is complete and approved by the Contracting Officer. Submit written reports when requesting final inspection indicating locations of and types of penetrations and types of firestopping used at each location; type shall be recorded by UL listed printed numbers.
File details come from the government source that posted it. Updated .