Sample Bid Sheet.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Radiation Portal Monitor (RPM) Replacement - Champlain & Peace Bridge, NY
Solicitation number
47PA0322R0019
Issued by

About this file

This document contains a bid sheet template for construction services and a related federal contract opportunity notice.

The bid sheet template provides a cost estimate template organized by Construction Specifications Institute divisions. Contractors are to use this template to submit pricing for labor, materials, equipment, subcontracting and overall costs by division for the construction project. The related federal contract opportunity is a solicitation to replace Radiation Portal Monitors at two land ports of entry in New York. The project scope involves exterior and interior work, including installation of replacement portal monitors, associated power, data and fiber optic cables and conduit, and connection to network infrastructure. Services will be provided according to the design documents. Following commissioning, the contractor will demobilize and close out the project. The solicitation is issued by the General Services Administration Public Buildings Service.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proposal

Company NameEstimate Summary
General NotesProject Name
Item Descriptions are for Reference Only. Please insert all items applicable to this project.
Spreadsheet is to be used as a template and can be edited to fit this project.
Overall Pricing is required per CSI Division.
DivisionDescriptionUnitAmountLaborMaterialEquipmentSubcontractor BidTotal
01General Conditions
GC/GRAutomatically calculated on Tab 2 - GC's$0.00
02Existing Conditions
DemolitionLS1.00$0.00$0.00$0.00$0.00
Removal and RecyclingLS1.00$0.00$0.00$0.00$0.00
03Concrete
Flat WorkLS1.00$0.00$0.00$0.00$0.00
04Masonry
CMULS1.00$0.00$0.00$0.00$0.00
05Metals
Chain Link FencingLS1.00$0.00$0.00$0.00$0.00
Structural SteelTon1.00$0.00$0.00$0.00$0.00
RoofLS1.00$0.00$0.00$0.00$0.00
06Wood & Plastics
Rough FramingLS1.00$0.00$0.00$0.00$0.00
07Roofing/Waterproofing/Insulation
WaterproofLS1.00$0.00$0.00$0.00$0.00Notes
RoofingLS1.00$0.00$0.00$0.00$0.00
InsulationLS1.00$0.00$0.00$0.00$0.00
08Openings
DoorsEach1.00$0.00$0.00$0.00$0.00
OH DoorsEach1.00$0.00$0.00$0.00$0.00
WindowsEach1.00$0.00$0.00$0.00$0.00
09Finishes (Walls/Ceilings/Floors)
PaintLS1.00$0.00$0.00$0.00$0.00
FlooringSQ. FT.1.00$0.00$0.00$0.00$0.00
10Specialties
Bathroom HardwareLS1.00$0.00$0.00$0.00$0.00
ABA RequirementsLS1.00$0.00$0.00$0.00$0.00
11Equipment
GeneratorLS1.00$0.00$0.00$0.00$0.00
12Furnishing
FurnitureLS1.00$0.00$0.00$0.00$0.00
13Special Construction
Prefab BoothsLS1.00$0.00$0.00$0.00$0.00
14Conveying Systems
ElevatorLS1.00$0.00$0.00$0.00$0.00
21Fire Supression
SprinklerL.F.1.00$0.00$0.00$0.00$0.00
Sprinkler HeadsEach1.00$0.00$0.00$0.00$0.00
22Plumbing
Fixtures1.00$0.00$0.00$0.00$0.00
PVC/Cast IronL.F.1.00$0.00$0.00$0.00$0.00
23HVAC
Test/BalanceLS1.00$0.00$0.00$0.00$0.00
25Integrated Automation
1.00$0.00$0.00$0.00$0.00
26Electrical
Building WiringL.F.1.00$0.00$0.00$0.00$0.00
Light FixturesLS1.00$0.00$0.00$0.00$0.00
27Communication
DataLS1.00$0.00$0.00$0.00$0.00
28Electronic Safety & Security
Fire AlarmLS1.00$0.00$0.00$0.00$0.00
31Earthwork
BollardsEach1.00$0.00$0.00$0.00$0.00
AsphaltLS1.00$0.00$0.00$0.00$0.00
32Exterior Improvements$0.00
Stone VerneerLS1.00$0.00$0.00$0.00$0.00
33Utilities
ElectricalLS1.00$0.00$0.00$0.00$0.00
WaterLS1.00$0.00$0.00$0.00$0.00
StormLS1.00$0.00$0.00$0.00$0.00
34Transportation
35Waterway & Marine Construction
41Material Handling Equipment
48Electrical Power Generation
Subtotal (1)$0.00
0.00%DesignInsert Percentage to the left or Lump Sum to the right$0.00Calculated by Percent or Enter Lump Sum
Subtotal (2)$0.00
0.00%OverheadInsert Percentage to the left$0.00
0.00%ProfitInsert Percentage to the left$0.00
Subtotal (2)$0.00
0.00%Payment & Performance BondsInsert Percentage to the left$0.00
0.00%TERO Tax(If Applicable)Insert Percentage to the left$0.00
Construction Cost$0.00

GC's

Project NameGeneral Conditions
This Page is Not required for sumbittal, however, Division 1 on the "Proposal" tab does need to be completed. These items are for reference only. Please insert or modify the line items to acount for your project costs.Only Enter Time/Date in "Months" and "Phase I Project Start" (Weeks, Days and Dates will Automatically Populate) These dates are for reference only. Please see the SOW for project timelines.
Phase I Project Start:1/1/200Months
Phase I Project Complete :1/1/200Weeks
Project Complete (2 WK Closeout):1/15/200Work Days - 5 Day Week
Phase II Project Start:1/2/200Months
Phase II Project Complete :1/2/200Weeks
Project Complete (2 WK Closeout):1/16/200Work Days - 5 Day Week
Total Months0
Total Weeks0
Total Days0Work Days - 5 Day Week
ItemDurationDuration UnitUnit CostSubtotal
Staff
Project Manager0MNTH$0.00$0.00
Superintendant0MNTH$0.00$0.00
QCM0MNTH$0.00$0.00
SSHO0MNTH$0.00$0.00
Project Admin0MNTH$0.00$0.00
Office Engineer0MNTH$0.00$0.00
Field Engineer(s)0MNTH$0.00$0.00
Safety Engineer0MNTH$0.00$0.00
Safety Director0MNTH$0.00$0.00
Construction Executive0MNTH$0.00$0.00
Scheduling Support0HRS$0.00$0.00
Vehicles
Site Vehicle0MNTH$0.00$0.00
Vehicle Rental0Day$0.00$0.00
Travel/Per Diem
Remote Site Lodging0Month$0.00$0.00
Super Travel0Trips$0.00$0.00
Super Per Diem0Day$0.00$0.00
PM Travel0Trips$0.00$0.00
PM Per Diem0Day$0.00$0.00
On-Site
On-site Office0MNTH$0.00$0.00
On-site Office - Set Up0LSUM$0.00$0.00
Job Office Supplies0LSUM$0.00$0.00
Office Furniture0MNTH$0.00$0.00
Conex / Storage Trailer0MNTH$0.00$0.00
Temporary Generators & Fuel0LSUM$0.00$0.00
Drinking Water0MNTH$0.00$0.00
Equipment0MNTH$0.00$0.00
Small Tools0LSUM$0.00$0.00
Dumpsters0EACH$0.00$0.00
Temp Services
Temporary Toilets0MNTH$0.00$0.00
Temporary Fencing0LF$0.00$0.00
Internet Service0MNTH$0.00$0.00
Cell Service0MNTH$0.00$0.00
Safety
First Aid Equipment0LSUM$0.00$0.00
Safety0LSUM$0.00$0.00
Safety Equipment0MNTH$0.00$0.00
Fire Extinguishers (1 EA per 3,000 SF)0EACH$0.00$0.00
Project Costs
Jobsite Photographs0LSUM$0.00$0.00
Surveying0LSUM$0.00$0.00
As-built Drawing Printing0LSUM$0.00$0.00
Misc.
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Total$0.00