Sample_ACM_Statement_of_Compliance_Form.pdf
PDF 230 KB Posted
- Solicitation number
- 2026-ITB-272
- Issued by
- Pierce County, Washington
About this file
This is a Pierce County Statement of Compliance form related to asbestos-containing materials (ACM) survey documentation for facilities management general contractor services in Washington. The form requires contractors and subcontractors performing work on Pierce County facilities to acknowledge receipt and understanding of an asbestos inspection report for the subject structure. The form mandates that all personnel who may encounter or disturb suspect ACM materials must be informed of their locations and types, must contact the property owner if suspect materials are discovered, and must reference the inspection report to determine whether materials contain asbestos. Any suspect materials not documented in the inspection report are presumed to contain asbestos until proven otherwise through sampling and polarized light microscopy (PLM) analysis. The form requires authorized company representatives to certify their understanding of the inspection report's limitations and findings and to confirm that all subcontractors have been informed of known ACM locations.
The compliance requirements are established under W.A.C. 296-62-07721 and PSCAA Regulation III, Article 4. This form serves as a safeguard for workers in Pierce County court facilities, general office buildings, and correctional facilities, including jail facilities, where construction and facility modification projects occur. Contractors must complete and sign the form prior to commencing work, providing their company name, signature, printed name, title, and date of attestation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pierce County ACM Compliance Form 3/31/2021
(SAMPLE FORM)
Statement of Compliance
Project:
Project No.:
Contract No. SC-
In accordance with W.A.C. 296-62-07721 and PSCAA Regulation III, Article 4, (insert name of firm preforming survey) has performed an asbestos survey of the subject structure located at (insert name and address location of facility(s)), documented in report titled: (insert title of report). Should employees or contract personnel encounter any suspect asbestos-containing materials (ACM) it is their responsibility to:
1. Contact a representative of the Owner.
2. Consult the referenced inspection report whether the suspect material contains asbestos.
3. If identified suspect material is not included in referenced inspection report, the suspect material is not sampled and presumed containing asbestos until otherwise proven by sampling and PLM analysis.
4. Ensure all employees and contractors, who may disturb suspect materials, are informed, and advised of the location and type of suspected ACM.
I Hereby Attest:
The inspection report included in the bidding documents is read and understood by the contractor and all the subcontractors the limitations and the findings of the survey. In addition, the contractor assures the subcontractors are informed of all known locations with ACM.
I am authorized to sign on behalf of my company.
Contractor: _____________________________
Signature: _____________________________
Print Name: _____________________________
Title: _____________________________
Date: _____________________________
File details come from the government source that posted it. Updated .