Saline Road Safety Improvements- Phase 4.pdf
PDF 241 KB Posted
- Attached to
- Saline Road Safety Improvements- Phase 4
- Solicitation number
- STBG-9902(611)
- Issued by
- Jackson County, Missouri
About this file
This is a Request for Qualifications (RFQ) issued by the Jefferson County Department of Public Works in Missouri for consulting engineering services on the Saline Road Safety Improvements—Phase 4 project. The county is seeking a consulting engineering firm to provide professional services including preparation of preliminary and final construction plans, right-of-way and easement plats, technical specifications, and construction cost estimation. The project scope includes roadway design, surveying, and environmental services, with the consultant potentially responsible for field surveys, archaeological or environmental studies, and geotechnical investigations. Additionally, the consultant will provide limited construction engineering services including staking of new right-of-way corners, setting of pins post-construction, review of shop drawings and material certifications, and responses to requests for information from both the contractor and the county. The project is located on Saline Road from approximately 250 feet south of Hermitage Drive to Diehl Road, spanning 0.80 miles as a safety improvement project. Letters of interest must not exceed four pages and be submitted in five copies by September 25, 2026, at 4:00 p.m. to the Jefferson County Department of Public Works at 725 Maple Street, Room 104, Hillsboro, Missouri 63050. No project briefing meetings will be granted during the RFQ process.
The estimated construction cost for the project is $2.5 million, funded through the Surface Transportation Block Grant Program (STBG-9902(611)). Selection will be based on the Brooks Act criteria evaluated across three categories totaling 100 points: Experience and Technical Competence of the Project Team (30 points maximum), assessing team members' professional work history, consultant firm history with similar projects, and examples of innovative solutions; Capacity and Capability of Firm to Complete the Project (30 points maximum), evaluating prime firm capacity, proposed subconsultants and partnership history, and team capabilities; and Past Record of Performance on Similar Projects (40 points maximum), considering meeting design scopes without undue overruns, meeting schedules, accurate cost estimation with detailed examples, and client references. Prior to submission, firms must have on file or submit with their Letter of Interest a Statement of Qualifications (SOQ) per RSMO 8.285 through 8.291, an Affidavit of Compliance with the federal work authorization program, and a copy of the company's E-Verify Memorandum of Understanding. All consultant questions or requests for information must be submitted in writing to Kurt Wengert, P.E., Public Works Technical Manager, at kwengert@jeffcomo.org or 636-797-5570.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jefferson County, Missouri
Maple Street Annex Dennis Gannon
725 Maple Street · PO Box 100 County Executive Hillsboro, Missouri 63050
DEPARTMENT OF PUBLIC WORKS
Jason Jonas, P.E. – Director Daniel Naunheim, P.E. – Deputy Director
Telephone: 636-797-5340 · Fax: 636-797-5565 Web Address: www.jeffcomo.org
Cecil Vivrett
Highway Superintendent 636-797-5427
Kurt Wengert, P.E.
Technical Division Manager
636-797-5570
Christina Mareschal Fleet Services Manager
636-797-5399
Matt Stinchcomb Facility Maintenance Manager
636-797-5574
Mike Cook Stormwater Manager
636-797-6318
August 17, 2026
Dear Consultant:
The Jefferson County Department of Public Works is requesting the services of a consulting engineering firm to perform the professional services described for the project included on the attached list. If your firm would like to be considered for these consulting services, you may express your interest by responding to the appropriate office which is indicated on the attachment. Limit your Letter of Interest (LOI) to no more than four (4) pages. This LOI should include any information which might help us in the selection process, such as the persons or team you would assign to the project, the backgrounds of those individuals, and other projects your company has recently completed, or are now active, that are similar in scope.
The selection committee will evaluate submittals based on: (a) experience and technical competence of project team; (b) capacity and capability of team to take on the project; (c) past record of performance with similar clients/projects on design scope, schedule and project estimation (reference: 23 CFR 172 Administration of Engineering & Design Related Service Contracts and RSMO 8.285 – 8.291).
It is required that your firm’s Statement of Qualification (SOQ) (RSMo 8.285 through 8.291) and an Affidavit of Compliance with the federal work authorization program, along with a copy of your company E-Verify Memorandum of Understanding (15 CSR 60-15.020) be submitted with your firm’s LOI or be on file with the Jefferson County Department of Public Works. The SOQ is not included as part of the LOI. Please only send one
(1) copy of your SOQ.
We request that five (5) copies of your LOI be received by 4:00 pm on Friday, September 25, 2026, at the Jefferson County Department of Public Works, PO Box 100, Hillsboro, Missouri 63050.
Sincerely, Kurt Wengert, P.E.
Technical Division Manager Jefferson County Department of Public Works
Attachments
Jefferson County, Saline Road Safety Improvements – Phase 4
Project Number: STBG-9902(611) Project Funding Source: Surface Transportation Block Grant Program Project Location/Description: From approximately 250’ South of Hermitage Drive to
Diehl Road Project Improvement: Safety Improvement Project Project Length: 0.80 Miles Estimated Construction Cost: Estimated at $2,500,000 Consultant Services Required: Roadway, Surveying, and Environmental:
Consultant shall be responsible for professional engineering services including the preparation of preliminary plans, right-of-way and easement plats, final construction plans, technical specifications and construction cost estimation. As part of preparing the plans the consultant may need to perform field surveys, archaeological or environmental studies and geotechnical investigations. The consultant shall also be responsible for a limited number of construction engineering services including staking of new right-of-way corners, setting of pins post-construction, review of shop drawings and material certifications, perform any needed drawing revisions and respond to requests for information from both the Contractor and the County.
Other Comments: The TIP grant application is available on the Jefferson County website at the following location:
https://www.jeffcomo.gov/DocumentCenter/View/21918/2026- --RFQ---Saline-Road-Safety-Improvements-TIP-Application-PDF
All consultant questions or requests for information shall be made in writing to the contact shown below. No project briefing meetings will be granted during the RFQ process.
Contact: Kurt Wengert, PE Public Works Technical Manager PO Box 100 Hillsboro, MO 63050 636-797-5570 kwengert@jeffcomo.org
Submittal Deadline: September 25, 2026, at 4:00 pm Submittal Package: Letter of interest should not exceed four (4) pages total. A page is defined as 8-1/2 by 11 inches and printed on one side. Five (5) copies of the letter of interest should be received at the address and by the time specified.
Submittal Delivery: Jefferson County Department of Public Works 725 Maple Street, Room 104 (Physical) PO Box 100 (Mailing) Hillsboro, Missouri 63050 https://www.jeffcomo.gov/DocumentCenter/View/21918/2026---RFQ---Saline-Road-Safety-Improvements-TIP-Application-PDF https://www.jeffcomo.gov/DocumentCenter/View/21918/2026---RFQ---Saline-Road-Safety-Improvements-TIP-Application-PDF
Pursuant to the Brooks Act for Consultant Selection; the following criteria will be the basis for reviews:
RFQ Rating Categories Points Available
Experience and Technical Competence of the Project Team -
• Team Members Professional Work History and Education 10 Points Maximum
• Consultant Firm History Working on Similar Projects 10 Points Maximum
• Examples of Innovative Solutions Used on Past Projects 10 Points Maximum
Subtotal = 30 Points Maximum
Capacity and Capability of Firm to Complete the Project -
• Prime Firm Capacity to Undertake the Project 10 Points Maximum
• Explanation of Proposed Subconsultants with Past Partnership History 10 Points Maximum
(if none, then prime firm will be rated out of 20 points maximum)
• Highlight Consultant Team Capabilities That Stand Out from Other Firms 10 Points Maximum
Subtotal = 30 Points Maximum
Past Record of Performance on Similar Projects -
• Meeting Design Scopes Proposed by Clients without Undo Overruns 10 Points Maximum
• Meeting Design Schedules Under Client Agreements 10 Points Maximum
• Accurate Project Cost Estimation with Examples in Full Detail 10 Points Maximum
• Client References and/or Recommendations 10 Points Maximum
Subtotal = 40 Points Maximum
Total Score = 100 Points Maximum