Salient Characteristics W911QX24Q0185.doc
DOC document 96 KB Posted
- Solicitation number
- W911QX24Q0185
About this file
This document is a Salient Characteristics file related to a federal contract opportunity for a molecular beam epitaxy (MBE) compatible Ion beam source.
The U.S. Army Research Laboratory (ARL) requires one MBE compatible Ion beam source for the growth of cubic boron nitride. The required unit must be mounted on a 4.5-inch ConFlat flange, compatible with Nitrogen and Argon source gases at flow rates up to 10 sccm, generate a plasma at up to 500W RF power with auto-tuning, produce ions with energies up to 400eV, and deliver an ion current density greater than 0.03 mA/cm2. Delivery is required within 16 weeks after contract award to the ARL facility in Adelphi, MD. The contracting opportunity is numbered W911QX24Q0185 and is soliciting quotes via a Request for Quote (RFQ). The government intends to award a sole source contract to SVT Associates, Inc., but will consider other offers received by the 24 July 2024 due date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Provisions and Clauses Full-Text Attachment (for Combo Synopsis-Solicitation) W911QX24Q0185.docx | DOCX document | |
| Solicitation W911QX24Q0185.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Salient Characteristics
Commercial Availability Certification:
I have evaluated the commercial marketplace and determined that all of the salient characteristics documented below are available in products/services offered in the commercial marketplace.
Signature (typed name): _David Storm (FCDD-RLA-LE)________________________ Technical Point of Contact (TPOC)
The Government requires a quantity of one (1) molecular beam epitaxy (MBE) compatible Ion beam source required for growth of cubic boron nitride in accordance with the following specifications:
· The contractor shall provide an Ion Beam source compatible with a Gen-II ultra-high vacuum (UHV) molecular beam epitaxy (MBE) system; in particular, the unit must be mounted on a 4.5 inch (”) ConFlat (CF) flange;
· The contractor shall provide a unit that is compatible with Nitrogen (N2) and argon (Ar) source gases at flow rates up to 10 standard cubic centimeters per minute (sccm);
· The contractor shall provide a unit that generates a plasma at a radio frequency (RF) forward operating power of up to 500 watts (W) with auto-tuning capability;
· The contractor shall provide a unit that produces ions with energies up to 400 electron volts (eV) via accelerating grids;
· The contractor shall provide a unit that produces an ion current density of greater than 0.03 mA/cm2 milliamperes per square centimeter (mA/cm2).
· Delivery to 2800 Powder Mill Road Adelphi, MD 20783 no later than sixteen (16) weeks After Receipt of Order (ARO).
Contracting Officer:
Template last updated 07/28/2016
File details come from the government source that posted it. Updated .