Salient Characteristics.pdf
PDF 109 KB Posted
- Attached to
- 355 CES - Dorm Dressers
- Solicitation number
- FA487725QA421
About this file
The Salient Characteristics document details a federal contract opportunity for procuring 73 dormitory 3-drawer dressers for the 355th Civil Engineer Squadron (355 CES) at a base location. The specifications require solid oak dressers with specific dimensions (30"Wx20"Dx30"T), featuring English dovetail drawers, epoxy-coated metal drawer slides, natural oak color, and blind bottom pulls with a top pull on the bottom drawer. The contract includes complete removal and disposal of existing dressers, with installation to occur in Building 4211, which has 3 floors and requires exterior entry access.
The project involves a remodel of an occupied dormitory, with the total estimated cost at $32,986.20. Key logistical details include: no elevators available, outside stairwells, key-controlled access, warehouse staging space available, and a dock for delivery located 0.3 miles from the dormitory. Base access requires valid driver's licenses, insurance, registration, and worker photo IDs. The installation timeframe is preferred to be no more than one week, with the contractor responsible for unloading and all aspects of furniture replacement. The Defense Reutilization and Marketing Office (DRMO) disposal area is 8 miles away and can be used with prior scheduling.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combo - QA421 - Dorm Dressers.pdf | ||
| Provisions and Clauses.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SALIENT CHARACTERISTICS
FOR
Dormitory 3 Drawer Dresser
1.0. SCOPE OF WORK:
All proposed products shall meet or exceed the following minimum specifications outlined in this Salient Characteristics. All items shall be delivered to the 355 CES/CEIHD � FOB
DESTINATION
1.1. PRODUCT PERFORMANCE SPECIFICATION:
Dormitory 3 Drawer Dresser must meet the following minimum specifications:
SPECIFICATIONS
Dormitory 3 Drawer Dresser
Base Unit Dimensions:
Install new 3 drawer dresser,/remove/disposal of old 3 drawer dressers
Scope Unit Dimensions:
30�x20�x30�, 3 drawers, drawers equal in size
Screen Size: N/A
Weight: N/A
Warranty: Standard as with system already in place
Features: Base unit:
3 Drawers upright Dresser 30�Wx20�Dx30�T
3 equal size drawers
Solid oak, English dovetail drawers
Handles-blind bottom pulls except bottom drawer being top pull
Epoxy coated metal drawer slides
Natural oak in color
Quantity: 73 Each
Requirements Install 73 new 3 drawer dressers:
o Bldg. 4211
Remove 73old 3 drawer dressers:
o Remove 73 old dressers from rooms.
Disposal of 73 old 3 drawer dressers:
o Vendors responsible of disposal
Estimated cost:
$32,986.20
Description: 1. Number of buildings? 1 building
2. Number of Floors? 3
3. Elevators available to contractor use for installation?
none
4. Interior exterior entry to actual rooms? Exterior entry
5. Outside or inside stairwells? Outside stairwells
6. Are permanent handrails in place & approved? yes
7. Access to rooms: require key or supervised entry? Yes to both we will be with installer
8. Are units occupied? Yes
9. How many units to be installed on each floor? Bldg.
4211-26, 26, 21,
10. Is this a new construction or a remodel? Remodel
11. Existing furniture to remove? Yes
12. If existing, is DRMO disposal area available on base?
Yes, but must be scheduled by you. If not using DRMO your responsible to remove off base.
13. Are units to be palletized for the DRMO? Yes, but must be scheduled by you. If not using DRMO your responsible to remove off base.
14. Does the DRMO provide pallets or contractor? No
15. How far away is the DRMO located? 8 miles
16. Is there parking lot access close to the building for unloading? Yes
17. Trash disposal available on base? Yes
18. If recyclable material only, what type is accepted?
(Styrofoam, Corrugated, etc.) N/A
19. Is warehouse space available for staging of product during the installation process? Yes
20. Will other contractors be on site? No
21. Base Access: Is prior approval required? No same day.
For drivers: Valid drivers license, Valid insurance, Valid registration. For workers: Valid Photo ID
22. Allowed time frame for the install project? Up to installer prefer no more than a week
23. Is there a dock for delivery? Yes, at warehouse .3 miles from dormitory
24. Will there be help available to unload the appliances from the truck? No
File details come from the government source that posted it. Updated .