This document is a salient characteristics attachment for a federal contract opportunity. It describes the requirement for Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF) to procure nozzle and filter kits from the Original Equipment Manufacturer (OEM), Cyclone Technology, in order to restore their surface cleaners to full operational health. The contract requires the OEM to provide the nozzle and filter kits, as well as to perform the installation services on two specific surface cleaner units. The related federal contract opportunity is a combined synopsis/solicitation for a "Service Kit" that will be issued as a firm fixed-price supply contract under a 100% small business set-aside. The solicitation will be sole-sourced to Cyclone Technology, and the delivery location is Puget Sound Naval Shipyard in Bremerton, WA.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24Q2387 SERVICE KIT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Nozzle, Filter Parts Kits
Doc# 4221-1747/1748, 4222-1745/1745/1747
1. Background
Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF) owned ride-on surface cleaners do not have the correct nozzles and supporting components to provide the shop’s desired operating spray pressure of 500 – 2000 pounds per square inch (PSI).
Additionally, several filter housings were not adequately freeze protected in the spring of 2024 and experienced freeze damage (cracked components). PSNS & IMF requires materials and simple, inexpensive material installation services from the Original Equipment Manufacturer (OEM) to bring these surface cleaners back to full operational health. This requirement will be through the sole source and OEM, Cyclone Technology.
2. Material Requirements
2.1 Nozzle Kit, Cyclone Technology CY5500, Cyclone Technology Part No. 116-0000032-01
2.2 Filter Kit, Cyclone Technology CY5500, Cyclone Technology Part No. 116-5500010-01
3. Material Install Requirements
3.1 General: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform material installation per paragraphs 3.2 & 3.3.
3.2 Cyclone Technology CY5500 Serial No. 10-CY55004-0623-271 Asset ID No. 4523A23277:
The Contractor shall remove damaged or unnecessary existing components/component-assemblies from the surface cleaner, and install Nozzle Kit (2.1) and Filter Kit (2.2) on the unit.
3.2.1 Following install, the Contractor shall perform operational test of the unit.
3.3 Cyclone Technology CY5500 Serial No. 10-CY55004-0623-270 Asset ID No. 4523A23276:
The Contractor shall remove damaged or unnecessary existing components/component-assemblies from the surface cleaner, and install Nozzle Kit (2.1) on the unit.
3.3.1 Following install, the Contractor shall perform operational test of the unit.
3.4 Spare Components: Parts remaining following the installs per 3.2 & 3.3 shall remain the property of the Government, and be provided to a Government representative.
4. Applicable Documents
4.1 Attachment A, Site Specific Requirements for Puget Sound Naval Shipyard & IMF, Bremerton Site and Naval Base Kitsap
4.2 Bill of Materials, Part 116-0000032-01 Nozzle Kit
4.3 Bill of Materials, Part 116-5500010-01 Filter Kit