Salient Characteristics_Asphalt Plant_FY24.docx

DOCX document 23 KB Posted

Attached to
RFI - 801 RHS Asphalt Batch Plant Replacement
Solicitation number
801RHSPlant24
Issued by

About this file

This document contains the Salient Characteristics for a Portable Asphalt Batch Plant required by the U.S. Air Force. The plant is intended to train military members on asphalt batch plant operations for use in contingency operations. Key requirements include a production rate of 140-160 MTPH, the ability to mix 30-50% recycled asphalt pavement, a 25,000-gallon hot oil jacketed asphalt cement tank, weigh scale options, a fuel pump for vehicle refueling, and a 5-year warranty with technical support. The document also includes a related Pre-Solicitation notice for an Asphalt Batch Plant purchase, which requests market information from interested vendors on their qualifications, capabilities, and ability to meet the stated requirements. Vendors are asked to provide a Rough Order of Magnitude pricing, as well as feedback on the stated requirements. Responses are due by April 26, 2024.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Salient Characteristics

FOR

Portable Asphalt Batch plant

Scope: The purpose of the Portable Asphalt Batch Plant is to train members of the U.S. Military on asphalt batch plant operations for use when producing asphalt for roads, airfields, and supporting contingency operations.

Portable Asphalt Batch Plant equipment:

1. Production rate per hour

a. 140-160 MTPH

b. RAP mixing 30% - 50% (Option)

2. Drum

a. Counter flow dryer

b. Dryer and mixer

3. Bins

a. Aggregate – 4 bins

b. RAP – 3 bins

c. Scalping screen between cold feed bins and mixing drum

4. Asphalt Cement Tank, 25,000 Gallon, hot oil jacketed

a. Mounted 500-gallon fuel tank for burner.

b. Metering system on AC pump.

5. Weigh scale option(s) for dispensed material

a. Truck weigh scale

b. Silo/chute scale

6. Fuel pump

a. Extra pump for vehicle refueling

7. Control House

a. Attached to plant

8. Operations

a. Dual operating/Analog controls

Calibration & Maintenance:

1. Must include:

a. Bi-annual Basic Maintenance

b. Software updates

c. Standard Wear-Part replacement plan

d. Annual inspection

2. 24/7 technical support option

Warranty:

1. 5-year warranty plan Training:

1. Conduct initial set-up, tear-down, and operating training.

2. Conduct yearly refresher training.

Service Schedule/Dates:

1. Within calendar year. Contractor can coordinate with user upon award

a. Contractor must confirm maintenance schedule and dates with the Government prior to equipment delivery Shipping:

Shipping costs will be included in contract

File details come from the government source that posted it. Updated .