Safety Review_Power_Supply_Redacted.pdf
PDF 99 KB Posted
- Attached to
- TDI POWER SUPPLIES
- Solicitation number
- W911N225QBB03
About this file
This is a Safety Office Review memorandum from the Letterkenny Army Depot (LEAD) for the procurement of five TDI Power Supplies (part number 28-2753609-3) to support depot manufacturing and repair operations for shelters. The power supplies were originally purchased between 2004-2005 directly from the original equipment manufacturer (TDI) and have been inactive. The procurement includes 1.6 hours per unit of engineering technician labor to evaluate and test each unit, ensuring they operate as specified through comprehensive testing including full-load operation, battery cycling, and LED verification.
The memorandum details extensive safety and occupational health requirements for the contractor, including compliance with LEAD Safety Management System (SMS), ISO 45001 certification, and multiple safety standards such as OSHA, NFPA, ANSI, and DoD regulations. Key contractor obligations include maintaining an effective site safety plan, providing safety reports, ensuring employee training and licensing, assessing worksites for hazards, using approved personal protective equipment (PPE), and reporting any safety incidents. The units will be sold "AS IS" condition, with the purchasing entity reserving the right to reduce the deliverable quantity without penalty if technical issues are discovered during testing.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
LETTERKENNY ARMY DEPOT
1 OVERCASH AVENUE
CHAMBERSBURG, PENNSYLVANIA 17201
Version 2
AMLD-SAF 26 March 2025
MEMORANDUM FOR: Directorate of Industrial Maintenance, (DIO)
ATTN:
SUBJECT: Safety Office Review of Power Supply part number 28-2753609-3
1. Purpose: Letterkenny Army Depot (LEAD) Safety Office review of the power supply part number 28-2753609-3 t support depot manufacturing and repair operations for shelters.
This purchase is for five TDI Power Supplies from
. The proposed power supplies are new material purchased by between 2004 and 2005 directly from TDI, the original equipment manufacturer (OEM). Due to the inactivity of the units, the includes 1.6 hours per unit of engineering technician labor to evaluate and test each unit to ensure the power supplies operates as specified.
Each unit will undergo a through test and inspection including but not limited to operation under a full-load, battery cycling through a series of charging/discharging/recharging sequences and verification of functional LEDs. Should any power supply shoe evidence of a technical issue, reserves the right to unilaterally reduce the deliverable quantity of power supplies without penalty or further obligation to the Government.
Units will be sold in “AS IS” condition, excluding all configuration changes and modifications related to ‘recap’. Prior to delivery, will provide photographs of each unit and copoies of all test results to the program COR.
The requestor is responsible for ensuring the adequacy of the item(s) for the intended use or purpose of the request prior to submittal for safety review.
2. The following information is recommended to be added to the PWS/PD or provided to the contractor.
a. The contractor is reminded that LEAD maintains a Safety Management System (SMS) and is ISO 45001 certified, AS9100 and AS9110 certified.
b. The Contractor will meet or exceed all of the LEAD safety and Occupational Health Program LEAD-R 385-1, LEAD Safety Bulletins, Army Safety Program and Occupational Health Program AR-385-10, OSHA, NFPA, ANSI, DoD, UFC, DOT, 29 CFR Title 1910 and 29 CFR Title 1926, Applications and other consensus standards
AMLD-SAF
SUBJECT: Safety Office Review Power Supplies for Shelters for Letterkenny Army Depot for the industry covered by the subject contract. In the case of a conflict among these laws, regulations, and standards contact the COR for clarification.
c. The Contractor shall maintain an effective site safety plan that meets or exceeds the requirement of OSHA, DoD, Army Requirements, and LEAD-Regulation 385-1.
d. Safety Reports shall be provided to COR, LEAD Safety Office, and database.
e. LEAD Safety Program and Occupational Health Program (LEAD-R 385-1) can be found at https://www.letterkenny.army.mil/Info/Visitors-Information under Installation Resources\LEAD Safety and Occupational Health Program. The Army Safety Program and Occupational Health Program is AR-385-10.
f. As part of the applicability of engineering controls, all equipment with rotating and moving parts at point of operation shall meet or exceed the LEAD 385-1 Chapter 17- 3 machine guarding requirements.
g. The contractor shall meet or exceed LEAD lockout/tagout (LOTO) action and procedures for addressing and controlling hazardous energy during service and maintenance of machines and equipment in accordance with LEAD-R 385-1, Chapter 12. See LEAD Technical Point of Contact (TPOC) for the safe servicing and maintenance of machines and equipment, in which unexpected, energized equipment, damage to equipment or start-up of machine or equipment, or release of stored energy, could cause injury to employees.
h. Equipment installation/set-up, service, maintenance, and testing shall be conducted accordance with the equipment manufacturer specifications, and according to the frequency recommended by the manufacturer.
i. The Contractor shall ensure all employees and all associated sub-contractor’s employees possess all required licenses for operating any equipment used in the performance of this contract. The Contractor must ensure that any personnel performing under the contract are fully trained, licensed, certified, competent, and qualified for the position in which they shall be serving.
j. The contractor shall have full responsibility for keeping contractor employees trained in the LEAD Safety and Occupational Health program, LEAD-R 385-1. The contracted work force employees shall meet and or exceed the LEAD-R 385-1 and OSHA Standards.
k. Contractors will comply with the Occupational Safety and Health Administration (OSHA) standards and LEAD R-385-1, and AR 385-10, safety rules, regulations.
Contractor shall have available copies of certifications, training certificates, required permits, and the Contractor’s safety plan or hazard analysis for the jobs to be performed at Letterkenny Army Depot (LEAD) and
. Each contractor/subcontractor will be familiar with the types of work they are expected to perform and each phase of the operation and associated hazards.
l. The contractor shall assess each worksite for hazards prior to the start of work.
m. All chemicals on LEAD worksites shall be vetted and approved by the LEAD Hazardous Material Approval Group (HMAG) prior to use per LEAD-R 385-1 Safety
AMLD-SAF
SUBJECT: Safety Office Review Power Supplies for Shelters for Letterkenny Army Depot
Bulletin 23-02. Contractor employees shall comply with LEAD HMAG/HMID procedures.
n. A list of all approved hazardous materials and Safety Data Sheets (SDS) will be maintained at all worksites.
o. All contractor personnel shall wear the appropriate LEAD approved PPE when in the following work areas: industrial buildings, at construction sites, test sites and test facilities as directed by LEAD-R 385-1.
p. Performance Requirement: All contractor personnel shall wear the appropriate LEAD approved PPE 100% as required by LEAD-R385-1.
q. Performance Requirement. Meet or exceed LEAD-R 385-1, the LEAD safety and Occupational Health Program and DA 385-10.
r. If contractor personnel determine a procedure is unsafe, they shall discontinue work immediately and contact their Program Manager who shall notify safety personnel and the COR. As soon as LEAD Safety Office personnel determine that the unsafe conditions have been corrected, the COR will notify the contractor Program Manager that personnel may resume work.
s. Contractors who are managed under a different Safety Management System (SMS) must report injures, accidents, and near misses to the Safety Office through their COR representative. THE COR shall notify the Safety Office within 24 hours of a contractor (Labor workforce) reporting an injury, accident, or near miss.
t. All safety messages or recalls related to the safe use of products provided by the contractor will be provided to the LEAD POC for the Contract within 5 days of contractor’s awareness of the message or notice.
3. The LEAD TPOC shall ensure the Contractor provides a completed Army Material Letterkenny Depot (AMLD) Form 4733, LEAD Contractor Chemical Checklist, and include Safety Data Sheets (SDS) for all chemicals to be brought onto the Depot prior to performing work on-site in accordance with LEAD-R 385 Safety Bulletin 23-01. The Directorate HMAG coordinator is the point of contact responsible for facilitation the HazMat validation.
Approved LEAD SDSs shall be maintained at all worksites.
4. If the requirements for this contract change, the proponent of the contract must submit all changes to the LEAD Safety Office for review.
5. LEAD Safety Office requests participation in all Technical Reviews to ensure current safety consideration for this contract.
6. A copy LEAD contract for this purchase shall be sent to the Safety POC.
7. The POC for this memo is