DEPARTMENT OF THE ARMY
LETTERKENNY ARMY DEPOT
1 OVERCASH AVENUE
CHAMBERSBURG, PENNSYLVANIA 17201-4150
AMLD-SAF 9 November 2020
MEMORANDUM FOR: DOPS
ATTN: Donald Mills, Cable and Harness Commodity Manager
SUBJECT: Safety Office Review for the Purchase of Connectors and Pin's for the W17 Cable Program (PN: 0010-040-000:34222 and PN: 44095-30P-A88:34222)
1. Purpose: To document the LEAD Safety Office’s review of the subject contract. Note this MFR may be applied to any delivery order associated with the subject Contract.
2. The following information shall be added to the PWS. If there is no PWS for the contract, or the PWS has already been approved, the contractor shall be notified of these items.
a. The contractor is reminded that LEAD maintains a Safety Management System (SMS) and is either OHSAS 18001 or ISO 45001 certified.
b. LEAD’s safety policy and safety program (LEAD-R 385-1) can be found at https://www.letterkenny.army.mil/PDF/385-1.pdf
c. It is the contractor’s responsibility to be familiar with these documents and to comply with their contents.
d. Any and all on site work at LEAD shall be completed in accordance with applicable OSHA, DoD, DOT, Army, and LEAD Safety requirements. As a federal installation, additional requirements other than OSHA apply to contractors performing work at LEAD. Examples include full conformance to all applicable NFPA standards, ANSI standards, and other consensus standards for the industry covered by the subject contract. It is the responsibility of the contractor to be familiar with all applicable standards prior to starting work. Additionally, the contractor shall make themselves familiar with and comply with LEAD's local safety regulation LEAD-R 385-1 prior to the start of any work at LEAD.
e. In order to document electrical panel ARC Flash rating deficiencies at Letterkenny Army Depot IAW (NFPA 70E Article 130.5), the contractor shall be so advised that all electrical panels require ARC Flash labels IAW NFPA 70E and are considered to be non-representative of the actual ARC Flash hazard contained within the panel or system circuits at Letterkenny Army Depot.
f. If contractor personnel determine a procedure is unsafe, they shall discontinue work immediately and contact their Program Manager who shall notify safety personnel and the COR. As soon as LEAD Safety Office personnel determine that the unsafe conditions have been corrected, the COR will notify the contractor Program Manager that personnel may resume work.
https://www.letterkenny.army.mil/PDF/385-1.pdf
AMLD-SAF
SUBJECT: Safety Office review of connectors and pin's for the W17 Cable Program (PN: 0010-040-000:34222 and PN: 44095-30P-A88:34222)
g. Additionally, all contractor supervisors and employees shall read and be knowledgeable of the governing SOP(s) prior to signing the SOP(s) and starting the operation.
h. All contractor personnel shall wear the appropriate PPE when in the following work areas: industrial buildings, at construction sites, test sites and test facilities. Failure to wear/use PPE may cause removal from the job site and/or seizure of non-compliant equipment/items.
i. The contractor shall comply with reporting requirements of 29 CFR Part 1904, AR 385-40 and APGR 385-4, and shall report accidents resulting in injury or death and accidents resulting in damage to Government property, supplies, and equipment to the COR promptly of the occurrence.
j. In case of injury/accident, the contractor shall complete a report of injury/accident and submit it to the COR Office with a copy to the LEAD Safety Office.
k. All shipped material shall include a current product Safety Data Sheet (SDS) for any chemical products being shipped other than residue. This includes items like engine oil.
l. All safety messages or recalls related to the safe use of products produced by the contractor will be provided to the COR for the Contract within 5 days of contractor’s awareness of the message or notice.
3. If the requirements of this contract change, the proponent of the contract must submit all changes to the LEAD Safety Office for review.
4. The POC for this memo is Osvaldo Alomar, Safety Engineer, Letterkenny Army Depot.
717-267-5319.
OSVALDO ALOMAR
Safety Engineer Letterkenny Army Depot