Safety Review Fluke 5550A.pdf
PDF 197 KB Posted
- Attached to
- Fluke 5550A Multi-Product Calibrator
- Solicitation number
- W911N224Q0047
About this file
This document is a safety review memorandum from the Letterkenny Army Depot (LEAD) Safety Office regarding the Fluke 5550A Multi-Product Calibrator.
The memorandum states that the Fluke 5550A is being procured as a direct replacement for the Fluke 5500A, which is no longer supported. The 5550A provides the required range and accuracy, and includes a Function Select Code to seamlessly integrate it into LEAD's existing calibration operations. The Safety Office has reviewed the 5550A and provides several requirements for the contractor, including compliance with LEAD's Safety Management System, use of appropriate personal protective equipment, hazardous material management, accident reporting, and other safety-related provisions. The memorandum also notes that an approved Request for Change may be required prior to contract solicitation, and that any contract changes must be submitted to the LEAD Safety Office for review.
The related federal contract opportunity is a sole-source, firm fixed-price supply contract issued by the Department of the Army Materiel Command Contracting Command Redstone Arsenal for one (1) Fluke 5550A Multi-Product Calibrator.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Simplified JA 5550A Fluke (copy)_Redacted.pdf | ||
| SOLICITATION W911N224Q0047.pdf | ||
| Solicitation Notes W911N224Q0047.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
LETTERKENNY ARMY DEPOT
1 OVERCASH AVENUE
CHAMBERSBURG, PENNSYLVANIA 17201
AMLD-SAF 4 December 2023
MEMORANDUM FOR: Directorate of Missile and Aerospace Readiness, (DMAR)
ATTN: Jody P Manges, Mechanical Engineer
SUBJECT: Safety Office Review of Fluke 5550A
1. Purpose: LEAD Safety Office review of 6B200 Fluke 5550A, Multi-Product Calibrator, per PD Received 12/4/2023.
The Fluke 5550A Calibrator provides the required range and accuracy. The 5550A is a direct replacement for 5500A which is no longer supported by Fluke. The 5550A enhances the Multi-Product Calibrator with new calibration ranges optimized to better match our existing digital multimeter workload in a modern, ruggedized instrument with an intuitive graphical interface. The 5550A includes a Function Select Code (FSC) that enables you to add the 5550A seamlessly to our existing calibration operations. Includes 17025 Calibration Certificate Traceable International Standards with Data, and basic test leads and adapters.
This purchase is for equipment only (does not include on-site).
The requestor is responsible for ensuring the adequacy of the item(s) for the intended use or purpose of the request prior to submittal for safety review.
2. The following information shall be added to the PD/PWS, if appropriate to the purchase.
If there is no PWS for the contract or the PD/PWS has already been approved, the contractor shall be notified of the following items.
a. The contractor is reminded that LEAD maintains a Safety Management System
(SMS) and is ISO 45001 certified, AS9100 and AS9110 certified.
b. LEAD’s safety policy and safety program (LEAD-R 385-1 and Safety Bulletins) can be found at https://letterkenny.army.mil/visitors-Information. The Army Safety and Occupational Health Program is AR-385-10.
c. It is the contractor’s responsibility to be familiar with theses documents and to comply with their contents.
d. Contractor/Subcontractor will conduct work on Letterkenny Army Depot in compliance with the most current version of 29 CFR 1910 and 29 CFR 1926 (where applicable). Each contractor/subcontractor will be familiar with the types of work they are expected to perform and each particular phase of the operation and associated hazards. All worksites will be free of recognized hazards in accordance with LEAD-R 385-1, Chapter 27 and Safety Bulletin 23-01).
https://letterkenny.army.mil/visitors-Information
AMLD-SAF
SUBJECT: Safety Office Review Fluke 5550A for Letterkenny Army Depot, Version 1
i. Each worksite will be assessed for hazards prior to the start of work.
All training certifications and an Activity Hazard Analysis (AHA) will be on hand at the job site.
ii. Any and all on site work at LEAD shall be completed in accordance with applicable OSHA, DoD, Army, and LEAD Safety requirements. As a federal installation, additional requirements other than OSHA apply to contractors performing work at LEAD. Examples include: full conformance to all applicable NFPA standards, ANSI standards, and other consensus standards for the industry covered by the subject contract. It is the responsibility of the contractor to be familiar with all applicable standards prior to starting work. Additionally, the contractors shall make themselves familiar with and comply with LEAD's local safety regulation LEAD-R 385-1, AR 385-10, and LEAD- R 420-13 prior to the start of any work at LEAD.
iii. As part of the applicability of engineering controls, all equipment with rotating and moving parts at point of operation shall comply with LEAD 385-1 Chapter 17-3 machine guarding requirements.
iv. In case of a conflict among these laws and regulations, the most stringent law or regulation shall apply. It is the responsibility of the contractor to be familiar with all applicable standards prior to starting work.
v. A list of all hazardous materials and Safety Data Sheets (SDS) will be maintained at will be present and maintained at all worksites. A copy of all SDS’s will be provided to the Safety Office at the beginning of all projects.
e. Equipment installation/set-up, and testing shall be conducted accordance with the equipment manufacturer specifications, and according to the frequency recommended by the manufacturer.
f. The coordination of the equipment installation shall be schedule with the COR.
g. The Contractor shall ensure all employees and all associated sub-contractor’s employees possess all required licenses for operating any equipment used in the performance of this contract. The Contractor must ensure that any personnel performing under a contract are fully trained, licensed, certified, and qualified for the position in which they shall be serving.
h. All contractor personnel shall wear the appropriate PPE when in the following work areas: industrial buildings, at construction sites, test sites and test facilities. Failure to wear/use PPE may cause removal from the job site and/or seizure of non-compliant equipment/items.
i. If contractor personnel determine a procedure is unsafe, they shall discontinue work immediately and contact their Program Manager who shall notify safety personnel and the COR. As soon as LEAD Safety Office personnel determine that the unsafe conditions have been corrected, the COR will notify the contractor Program Manager that personnel may resume work.
j. The contractor shall comply with reporting requirements of 29 CFR 1904 and AR PAM 385-40 shall report accidents resulting in injury or death and accidents resulting in damage to Government property, supplies, and equipment to the COR promptly of the occurrence. In case of injury/accident, the contractor shall complete an injury/accident investigation report and submit it to the COR with a copy to the LEAD Safety Office within 24 hours of the event, regardless of if the event is reported to another Safety Management System (SMS).
k. Directorate of Contracting will ensure ergonomic designs are considered in all contracts for the purchase of new equipment and tools.
l. The Awarding Contracting Office will:
i. Require all suppliers of chemicals to provide current SDSs with each shipment as set forth by the Federal Acquisition Regulation (FAR), Federal Standard 313V Appendix A, and OSHA 29 CFR 1910.1200.
ii. Ensure all procured HazMat is restricted to products that have been approved for use by the HMAG, to include any HazMat provided with equipment or items purchased (e.g., lubricant grease or engine oil).
iii. Pursue sanctions against vendors who consistently do not provide proper SDS.
iv. Require all contractors to provide a completed AMLD Form 4783 LEAD Contractor Chemical Checklist and include SDSs for all chemicals to be brought onto the Depot prior to performing work on-site.
m. Requisitioning, Purchasing, or Otherwise acquiring HazMat: All HazMat as defined by LEAD-R 385-1, Safety Bulletin 23-02 shall be approved using an HMAG request prior to being acquired, received, and issued through an IRP.
n. Obtaining Approval to Requisition, Purchase, or Use a New HazMat will follow LEAD-R 385-1, Safety Bulletin 23-02, 10.6.b
o. All safety messages or recalls related to the safe use of products provided by the contractor will be provided to the LEAD POC for the Contract within 5 days of contractor’s awareness of the message or notice.
3. The COR will notify all local work area supervisors prior to actual work to ensure employee safety.
4. The Directorate HMAG coordinator is the point(s) of contact within a Directorate or equivalent organization responsible for facilitating HazMat validation, ensuring accurate HMAG Request Details on the form, and resolving nonconcurrence issues that may arise during the HMAG review.
5. If applicable to the equipment and/or service purchased an approved Request for Change (RFC) shall be completed prior to contract solicitation.
6. Purchased equipment and/or services that include training shall be reported to the LEAD Skills Develop Office (SDO).
7. If the requirements for this contract change, the proponent of the contract must submit all changes to the LEAD Safety Office for review.
8. The POC for this memo is Terrie L. Doom, LEAD Safety Office, AMLD-SAF, (717) 267- 5253, Email: Terrie.L.Doom.civ@army.mil.
Terrie L. Doom Safety Engineer Letterkenny Army Depot mailto:Email:%20Terrie.L.Doom.civ@army.mil
| 2023-12-04T15:20:01-0500 | |
| DOOM.TERRIE.L.1393107614 |
File details come from the government source that posted it. Updated .