BidSheet_071626.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
McIntosh Park Wetland Construction
Solicitation number
26-048UO-IFB
Issued by
Hillsborough County, Florida

About this file

This is a bid sheet for the McIntosh Park Wetland Construction project in Plant City, Florida, administered by the City of Plant City. The project encompasses the construction and restoration of wetlands at McIntosh Preserve, a 363-acre park, to provide stormwater treatment and augment existing wetland hydroperiods using reclaimed water from the City's water reclamation facility. Core work includes excavation of wetland footprints, retention and stacking of excavated soils to create a 50-foot hill shaped like Florida, planting of wetlands, and installation of reclaimed water pipe infrastructure with associated apparatus. Bid alternates are available for recreational amenities including restrooms and wetland boardwalks. The bid sheet dated July 16, 2026, documents bidder submissions and pricing information for the various project components and alternates.

The McIntosh Park Wetland Construction project is partially funded through Grant Agreement No. LPA0038, awarded by the State of Florida Department of Environmental Protection. All work performed, expenditures incurred, and project-related actions must be conducted in accordance with the terms and conditions of the grant agreement. The bid sheet serves as documentation of contractor proposals and cost estimates for both base bid and alternate scope items, establishing the pricing framework for project execution and funding allocation against the state grant and local municipal resources.

View the file

Other files

File Type Posted
Question_51_UpdatedTable.pdf PDF
Environmental_Resource_Permit_no.43044733.002_-_May_24,_2024.pdf PDF
Hillsborough_County_EPC_-_review_no.69805_-September_30,_2025.pdf PDF
MCINTOSH_PARK_INTEGRATED_WATER_MANAGMENT_PHASE_II.dst —
silt_fence_and_turbidity_barriers_detailsb2baa412.png PNG image
silt_fence_and_turbidity_barriers_detailsce8ff31f.png PNG image
DCS.ctb —
50183029_EXISTING_CONDITIONS_PLAN.dwg DWG drawing
50183029_GENERAL_NOTES_AND_LEGEND.dwg DWG drawing
50183029_OVERALL_SITE_PLAN.dwg DWG drawing
Dewberry-Master_Template_22x34_2705.dwt —
DewberryLogo_RGB.jpg JPG image
E-58-39.pdf PDF
HIL2020_468524.sid SID file
McIntosh_Final_Design.dst —
STANDARD_DETAILS.dwg DWG drawing
Sitework.Paving_-_Surfacing.Pavers.Interlocking.jpg JPG image
Sitework.Planting.Soil.jpg JPG image
WETLAND_IMPACT_MAP.dwg DWG drawing
Well_Detail.pdf PDF
x-aerials.dwg DWG drawing
x-existing_trees_existingconditions.dwg DWG drawing
x-existing_wetlands.dwg DWG drawing
50183029_DETAILS.dwg DWG drawing
50183029_GRADING_AND_DRAINAGE_PLANS.dwg DWG drawing
FDOT_DITCH_BOTTOM_INLET.pdf PDF
HIL2020_468224.sid SID file
McIntosh_Final_Design.txt TXT text file
OP2017_NC_468523_24.sid SID file
Concrete.Cast-In-Place.Flat.Broom.Grey.bump.jpg JPG image
DWG_To_PDF.pc3 —
HIL2023_468523.sid SID file
HIL2023_468524.sid SID file
Masonry.Unit_Masonry.Brick.Modular.Flemish_Cross.jpg JPG image
Concrete.Cast-In-Place.Flat.Grey.1.jpg JPG image
HIL2023_468224.sid SID file
Hydrangea_Blue_Wave_01_mask.gif GIF image
Masonry.Stone.Fieldstone.Uncoarsed.Tight.jpg JPG image
Masonry.Unit_Masonry.Brick.Modular.Flemish_Cross.bump.jpg JPG image
McIntosh_Park_Wetland_Construction.pdf PDF
2026-08-19_McIntosh_Park_Wetland_Construction.pdf PDF
2024-06-26_-_LPA0038_-_Amendment_3_(1).pdf PDF
053-2023_-_LPA0038_-_Amendment_2.pdf PDF
79173_-_City_of_Plant_City_-_EPC_PERMIT.pdf PDF
CombinedSpecifications.pdf PDF
ERP_Permit_43044733.02.pdf PDF
McIntosh_Park_Elements_Full_Set_02-19-26_SS_by_All.pdf PDF
Defend360_Digital-Owners-Manual_2025.pdf PDF
Safety_and_Site_Security.docx DOCX document
2024-06-26_-_LPA0038_-_Amendment_3.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing_Table_McIntosh Line Item Description of Items Requested Unit Quantity Needed Unit Cost Vrinda Sawhney: Keep this blank for contractor to enter unless you have defined unit cost that you need contractor to bid on.

1Mobilization and DemobilizationLS1
2Survey/As-built DrawingsLS1
3Maintenance of Traffic/CSX CoordinationLS1
4Clearing and Grubbing/Site PreparationLS1
5aSilt FenceLS1
5bTurbidity BarriersLS1
6ExcavationCY745,604
7GradingSY1,188,581
8Geocell Spillway SystemSF53740
9a18" RCP PipeLF1,178
9b24" RCP PipeLF851
9c30" RCP PipeLF276
9d36" RCP PipeLF290
9e60" RCP PipeLF200
9f18" PVC Reclaim Pipe Open CutLF3,254
9g24" PVC Reclaim Pipe Open CutLF1,614
10a18" MESEA5
10b24" MESEA1
10c30" MESEA5
10d36" MESEA3
10eU Endwall with Baffles 18" FDOT Index 430-011EA2
10fU Endwall with Baffles 24" FDOT Index 430-011EA8
10gFDOT Concrete Endwall 1-24" RCPEA1
10hFDOT Concrete Endwall 2 - 24" RCPEA2
10iFDOT Concrete Endwall 2 - 30" RCPEA1
10jFDOT Concrete Endwall 2 - 36" RCPEA1
10kConcrete GravityEndwall Wall (430-030)EA4
11aFDOT Type H (2 grate) Ditch Bottom InletEA4
11bFDOT Type C Ditch Bottom InletEA17
11cFDOT Type E Ditch Bottom InletEA1
11dFDOT Type H (2 grate) Ditch Bottom Inlet w/2 Slide GatesEA4
11eManhole P8EA1
11fHDPE Flap Valve 24"EA5
11gHDPE Flap Valve 30"EA2
11hHDPE Flap Valve 36"EA2
12Jack and Bore and 42" CasingLF121
1312" Flow Control Assemblies with 18" Isolation ValvesEA4
14a#57 StoneTN2
14bDitch Lining Rip RapTN156
14c24 Mil Pond Liner (135 sf) and 15' BattenEA1
15a6' Diameter ManholeEA4
15b6' Diameter Hinged Grate Center OpenEA4
15cRock for Spring VentEA4
15dGeocell Support System for Spring VentSF200
16Weir RefurbishmentLS1
17Water Level RecordersEA9
18SoddingSY387,492
19Wetland PlantingLS1
20Electrical and InstrumentationLS1
26Incidental Fence Removal and ReplacementLS1
27Project AllowanceALLOW$ 200,000.00
28Permitting AllowanceALLOW$ 50,000.00
Alternate Bid Item - Boardwalk
A-1BoardwalkLS1
Alternate Bid Items - Park Elements
B-1Mobilization and DemobilizationLS1
B-2Survey/As-built DrawingsLS1
B-3Maintenance of Traffic/CSX CoordinationLS1
B-4Clearing and Grubbing/Site PreparationLS1
B-5aSilt FenceLS1
B-9a15" RCP PipeLF44
B-9b18" RCP PipeLF265
B-10a15" MESEA1
B-10b18" MESEA2
B-11aFDOT Type C Ditch Bottom InletEA1
B-11bFDOT Type D Ditch Bottom InletEA1
B-11cFDOT Type F Ditch Bottom InletEA2
B-18SoddingSY1,077
B-20Electrical and InstrumentationLS1
B-21Asphalt PavementSY794
B-22CurbLF3,989
B-23Unpaved Parking Lot and DriveSY8,464
B-24Concrete SidewalkSY154
B-25Concrete Slabs for Restroom and PavilionLS1
B-26Incidental Fence Removal and ReplacementLS1
B-27Septic SystemLS1
B-28Well, Pump, Tank and Chlorination SystemLS1
B-29Pre-Fabricated Restroom/Office BuildingLS1
B-30Pre-Fabricated PavilionLS1