BidSheet_071626.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- McIntosh Park Wetland Construction
- Solicitation number
- 26-048UO-IFB
- Issued by
- Hillsborough County, Florida
About this file
This is a bid sheet for the McIntosh Park Wetland Construction project in Plant City, Florida, administered by the City of Plant City. The project encompasses the construction and restoration of wetlands at McIntosh Preserve, a 363-acre park, to provide stormwater treatment and augment existing wetland hydroperiods using reclaimed water from the City's water reclamation facility. Core work includes excavation of wetland footprints, retention and stacking of excavated soils to create a 50-foot hill shaped like Florida, planting of wetlands, and installation of reclaimed water pipe infrastructure with associated apparatus. Bid alternates are available for recreational amenities including restrooms and wetland boardwalks. The bid sheet dated July 16, 2026, documents bidder submissions and pricing information for the various project components and alternates.
The McIntosh Park Wetland Construction project is partially funded through Grant Agreement No. LPA0038, awarded by the State of Florida Department of Environmental Protection. All work performed, expenditures incurred, and project-related actions must be conducted in accordance with the terms and conditions of the grant agreement. The bid sheet serves as documentation of contractor proposals and cost estimates for both base bid and alternate scope items, establishing the pricing framework for project execution and funding allocation against the state grant and local municipal resources.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing_Table_McIntosh Line Item Description of Items Requested Unit Quantity Needed Unit Cost Vrinda Sawhney: Keep this blank for contractor to enter unless you have defined unit cost that you need contractor to bid on.
| 1 | Mobilization and Demobilization | LS | 1 | |
| 2 | Survey/As-built Drawings | LS | 1 | |
| 3 | Maintenance of Traffic/CSX Coordination | LS | 1 | |
| 4 | Clearing and Grubbing/Site Preparation | LS | 1 | |
| 5a | Silt Fence | LS | 1 | |
| 5b | Turbidity Barriers | LS | 1 | |
| 6 | Excavation | CY | 745,604 | |
| 7 | Grading | SY | 1,188,581 | |
| 8 | Geocell Spillway System | SF | 53740 | |
| 9a | 18" RCP Pipe | LF | 1,178 | |
| 9b | 24" RCP Pipe | LF | 851 | |
| 9c | 30" RCP Pipe | LF | 276 | |
| 9d | 36" RCP Pipe | LF | 290 | |
| 9e | 60" RCP Pipe | LF | 200 | |
| 9f | 18" PVC Reclaim Pipe Open Cut | LF | 3,254 | |
| 9g | 24" PVC Reclaim Pipe Open Cut | LF | 1,614 | |
| 10a | 18" MES | EA | 5 | |
| 10b | 24" MES | EA | 1 | |
| 10c | 30" MES | EA | 5 | |
| 10d | 36" MES | EA | 3 | |
| 10e | U Endwall with Baffles 18" FDOT Index 430-011 | EA | 2 | |
| 10f | U Endwall with Baffles 24" FDOT Index 430-011 | EA | 8 | |
| 10g | FDOT Concrete Endwall 1-24" RCP | EA | 1 | |
| 10h | FDOT Concrete Endwall 2 - 24" RCP | EA | 2 | |
| 10i | FDOT Concrete Endwall 2 - 30" RCP | EA | 1 | |
| 10j | FDOT Concrete Endwall 2 - 36" RCP | EA | 1 | |
| 10k | Concrete GravityEndwall Wall (430-030) | EA | 4 | |
| 11a | FDOT Type H (2 grate) Ditch Bottom Inlet | EA | 4 | |
| 11b | FDOT Type C Ditch Bottom Inlet | EA | 17 | |
| 11c | FDOT Type E Ditch Bottom Inlet | EA | 1 | |
| 11d | FDOT Type H (2 grate) Ditch Bottom Inlet w/2 Slide Gates | EA | 4 | |
| 11e | Manhole P8 | EA | 1 | |
| 11f | HDPE Flap Valve 24" | EA | 5 | |
| 11g | HDPE Flap Valve 30" | EA | 2 | |
| 11h | HDPE Flap Valve 36" | EA | 2 | |
| 12 | Jack and Bore and 42" Casing | LF | 121 | |
| 13 | 12" Flow Control Assemblies with 18" Isolation Valves | EA | 4 | |
| 14a | #57 Stone | TN | 2 | |
| 14b | Ditch Lining Rip Rap | TN | 156 | |
| 14c | 24 Mil Pond Liner (135 sf) and 15' Batten | EA | 1 | |
| 15a | 6' Diameter Manhole | EA | 4 | |
| 15b | 6' Diameter Hinged Grate Center Open | EA | 4 | |
| 15c | Rock for Spring Vent | EA | 4 | |
| 15d | Geocell Support System for Spring Vent | SF | 200 | |
| 16 | Weir Refurbishment | LS | 1 | |
| 17 | Water Level Recorders | EA | 9 | |
| 18 | Sodding | SY | 387,492 | |
| 19 | Wetland Planting | LS | 1 | |
| 20 | Electrical and Instrumentation | LS | 1 | |
| 26 | Incidental Fence Removal and Replacement | LS | 1 | |
| 27 | Project Allowance | ALLOW | $ 200,000.00 | |
| 28 | Permitting Allowance | ALLOW | $ 50,000.00 | |
| Alternate Bid Item - Boardwalk | ||||
| A-1 | Boardwalk | LS | 1 | |
| Alternate Bid Items - Park Elements | ||||
| B-1 | Mobilization and Demobilization | LS | 1 | |
| B-2 | Survey/As-built Drawings | LS | 1 | |
| B-3 | Maintenance of Traffic/CSX Coordination | LS | 1 | |
| B-4 | Clearing and Grubbing/Site Preparation | LS | 1 | |
| B-5a | Silt Fence | LS | 1 | |
| B-9a | 15" RCP Pipe | LF | 44 | |
| B-9b | 18" RCP Pipe | LF | 265 | |
| B-10a | 15" MES | EA | 1 | |
| B-10b | 18" MES | EA | 2 | |
| B-11a | FDOT Type C Ditch Bottom Inlet | EA | 1 | |
| B-11b | FDOT Type D Ditch Bottom Inlet | EA | 1 | |
| B-11c | FDOT Type F Ditch Bottom Inlet | EA | 2 | |
| B-18 | Sodding | SY | 1,077 | |
| B-20 | Electrical and Instrumentation | LS | 1 | |
| B-21 | Asphalt Pavement | SY | 794 | |
| B-22 | Curb | LF | 3,989 | |
| B-23 | Unpaved Parking Lot and Drive | SY | 8,464 | |
| B-24 | Concrete Sidewalk | SY | 154 | |
| B-25 | Concrete Slabs for Restroom and Pavilion | LS | 1 | |
| B-26 | Incidental Fence Removal and Replacement | LS | 1 | |
| B-27 | Septic System | LS | 1 | |
| B-28 | Well, Pump, Tank and Chlorination System | LS | 1 | |
| B-29 | Pre-Fabricated Restroom/Office Building | LS | 1 | |
| B-30 | Pre-Fabricated Pavilion | LS | 1 |
&"Helvetica Neue,Regular"&12&K000000&P
File details come from the government source that posted it. Updated .