This document is a Basic Ordering Agreement (BOA) between the U.S. Navy and Sikorsky Aircraft Corporation for repair and modification of CH-53K helicopter components and systems. The BOA covers a five-year ordering period, allowing the Navy to place priced or unpriced orders for repairable assemblies, spares, and related services. Key items include aircraft parts such as navigation computers, control panels, blade assemblies, engine components, electrical systems, and various structural and mechanical parts for the CH-53K helicopter and Foreign Military Sales (FMS) systems.

The agreement includes specific provisions for repair turn-around times, Web-based Commercial Asset Visibility (WEBCAV) reporting, and detailed packaging and marking requirements. Orders can be placed by NAVSUP Weapon Systems Support Contracting Officers, with repair and modification work to be performed at Sikorsky's facility in Stratford, Connecticut. The BOA establishes mechanisms for handling various repair scenarios, including Beyond Physical Repair (BPR), Beyond Economical Repair (BER), and Missing on Induction (MOI) components, with specific procedures for reporting, evaluation, and potential replacement of parts.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

B01 - SUPPLIES OR SERVICES TO BE FURNISHED

B02 - SUPTXT232-9401(1-92) - SEGREGATION OF COSTS

B03 – WSSTERMBZ01 - IMPORTANT NOTICE REGARDING INVENTORY TRANSACTION REPORTING

B04 – SUPTXT216-9401 (09-18) - PLACING AND PROCESSING OF ORDERS

B05 – PRICED ORDERS

B06 – UNPRICED ORDERS

B07 – ADDITIONAL MATTERS RELATIVE TO THE ISSUANCE OF ORDERS FOR REPAIR

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C01 - INPUT OF ARTICLES TO BE REPAIRED AND/OR MODIFIED

C02 - SPECIFICATIONS FOR REPAIR/MODIFICATION/STATEMENT OF WORK

C03 – WEB-BASED COMMERCIAL ASSET VISIBLITY (WEBCAVS) STATEMENT OF WORK (SOW)

C04 - SPECIFICATION FOR CONSUMABLE PARTS (CONTRACTOR-FURNISHED)

C05 – WSSTERMCZ04 - GOVERNMENT INDUSTRY DATA EXCHANGE PROGRAM (GIDEP)

C06 - WSSTERMCZ01 – CONFIGURATION MANAGEMENT AND CONTROLS (PHIL ONLY)

C07 - WSSTERMCZ05 – CONFIGURATION MANAGEMENT - MARITIME (MECH ONLY)

SECTION D - PACKAGING AND MARKING

D01 - WSSTERMDZ03 - PRESERVATION, PACKAGING, PACKING AND MARKING

SECTION E - INSPECTION AND ACCEPTANCE

E01 - FAR 52.252-2 - CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

E02 - FAR 52.246-11 – HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

E03 - INSPECTION AND ACCEPTANCE AT ORIGIN (NON-REPAIR ITEMS)

E04 - INSPECTION AND ACCEPTANCE AT ORIGIN (REPAIRABLE ASSEMBLIES)

E05 - INSPECTION AND ACCEPTANCE AT DESTINATION (REPORTS) (REPAIR ITEMS)

SECTION F – DELIVERIES OR PERFORMANCE

F01 – 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

F02 - TIME OF DELIVERY (REPAIR)

F03 - TIME OF DELIVERY (SPARES)

F04 - PLACE OF DELIVERY - FOB ORIGIN

F05 – SUPPLEMENTAL DELIVERY MATTERS

F06 - WSSTERMFZ05 - FMS DELIVERY AND SHIPPING INSTRUCTIONS

F07 – NAVSUPWSSFA24 - COMMERCIAL ASSET VISIBILITY REPAIRABLES PORTAL (CAV RP) REPORTING

SECTION G - CONTRACT ADMINISTRATION DATA

G01 - CONTRACT ADMINISTRATION

G02 – DFARS 252.232-7006 - WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H01 - SUPTXT243-9400(1-92) - AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER

H02 - SUPTXT245-9409(1-92) - FACILITIES

H03 - WSSTERMHZ02 - QUALITY ASSURANCE REPRESENTATIVE (QAR)

PART II - CONTRACT CLAUSES

SECTION I – CONTRACT CLAUSES

I01 – FAR 52.252-2 - CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

I02 - FAR 52.216-24 – LIMITATION OF GOVERNMENT LIABILITY (APR 1984)

I03 - FAR 52.223-9 – ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA

DESIGNATED ITEMS (MAY 2008)

I04 - FAR 52.243-7 – NOTIFICATION OF CHANGES (JAN 2017)

I05 - FAR 52.252-6 - AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

I06 - DFARS 252.217-7027 - CONTRACT DEFINITIZATION (MAY 2023)

I07 – DFARS 252.217-7028 – OVER AND ABOVE WORK (DEC 1991)

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

SECTION J – LIST OF ATTACHMENTS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

K01 - FAR 52.252-1 – SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

K02 - FAR 52.204-8 - ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)

K03 - FAR 52.207-4 - ECONOMIC PURCHASE QUANTITY - SUPPLIES (AUG 1987)

K04 - FAR 52.209-7 - INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

K05 - FAR 52.230-1 - COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (JUN 2020) K06 - FAR 52.230-7 - PROPOSAL DISCLOSURE--COST ACCOUNTING PRACTICE CHANGES (APR 2005) K07 - DFARS 252.204-7007 - ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023) K08 - DFARS 252.225-7010 - COMMERCIAL DERIVATIVE MILITARY ARTICLE-SPECIALTY METALS

COMPLIANCE CERTIFICATE (JUL 2009)

K09 - WSSTERMKZ01 - PRICING INFORMATION

K10 - DFARS 252.225-7035 - BUYAMERICAN – FREE TRADE AGREEMENTS – BALANCE OF PAYMENTS

PROGRAM CERTIFICATE, BASIC (FEB 2024)

K11 - DFARS 252.225-7035 – BUY AMERICAN – FREE TRADE AGREEMENTS – BALANCE OF PAYMENTS

PROGRAM CERTIFICATE, ALT. I (FEB 2024)

K12 - DFARS 252.225-7035 – BUY AMERICAN – FREE TRADE AGREEENTS – BALANCE OF PAYMENTS

PROGRAM CERTIFICATE, ALT IV (FEB 2024)

SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS OR RESPONDENTS

L01 – FAR 52.252-1 - SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

L02 - FAR 52.211-14 - NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY

PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)

L03 - FAR 52.216-1 - TYPE OF CONTRACT (APR 1984)

L04 - FAR 52.233-2 - SERVICE OF PROTEST (SEP 2006)

L05 - DFARS 252.217-7026 - IDENTIFICATION OF SOURCES OF SUPPLY (JAN 2023)

L06 - WSSTERMLZ05 - REVIEW OF AGENCY PROTESTS

L07 - WSSTERMLZ06 - CONSIGNMENT INSTRUCTIONS

L08 - CERTIFICATE OF CURRENT COST OR PRICING DATA

The text of all FAR, DFARS, and NMCARS provisions and clauses may be accessed electronically at the following links:

https://www.acquisition.gov https://www.acq.osd.mil/dpap/dars/dfarspgi/current/ http://www.acquisition.gov/nmcars

The text of DoD Class Deviations may be accessed electronically at the following link:

https://www.acq.osd.mil/dpap/dars/class_deviations.html

NAVSUP and NAVSUP WSS specific Text and Statement of Work Language are contained in the body of the Agreement.

https://www.acquisition.gov/ https://www.acq.osd.mil/dpap/dars/dfarspgi/current/ http://www.acquisition.gov/nmcars https://www.acq.osd.mil/dpap/dars/class_deviations.html

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

B01 - SUPPLIES OR SERVICES TO BE FURNISHED

This is a Basic Ordering Agreement (BOA) with Sikorsky Aircraft Corporation. The terms and conditions in this BOA apply to all orders issued hereunder. The Government may order, in the manner provided elsewhere herein, the following:

(a) Repairs and/or Modifications of Government Property:

(1) The Government may order, in the manner provided elsewhere herein, and the contractor shall furnish all effort including labor, material, and facilities as may be required to repair and/or modify the ordered quantities of repairable assemblies (hereinafter repairable assemblies or items) in the CH-53K and FMS Sytsem. The repairable assemblies to be repaired and/or modified under this BOA are set forth by manufacturer's part number or National Stock Number (NSN) in Attachment "A" and constitute “Government Property” as defined in FAR 52.245-1 or 52.245-1 Alternate I, as applicable, of this BOA. Repair and/or modification of repairable assemblies will be accomplished in accordance with the Specifications for Repair/Modification/Statement of Work (Section C06).

(2) Web-based Commercial Asset Visibility (WEBCAV) Reporting: The Contractor’s effort on each Order for repair and/or modification of government property shall include furnishing all effort including labor, materials, and facilities as may be required to accumulate, format, and transmit the transactions specified in Section C07.

(b) Spares:

(1) The Government may order, in the manner provided elsewhere herein, and the contractor shall furnish items as may be required to support the CH-53K and FMS.

B02 - SUPTXT232-9401(1-92) - SEGREGATION OF COSTS

The contractor is required to propose and segregate costs under this agreement by individual order number.

B03 – WSSTERMBZ01 - IMPORTANT NOTICE REGARDING INVENTORY TRANSACTION REPORTING

Inventory transaction reporting requirements have changed for NAVSUP Weapon System Support (NAVSUPWSS) contracts.

These requirements are detailed in Section F, and the contractor should read this section carefully to ensure compliance. Detailed information on Commercial Asset Visibility (CAV) Repairables Portal (RP) reporting requirements can be found in the CAV Statement of Work (SOW) located at:

https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Provisions-Instructions-and-Contract/

Questions can be addressed to usn.philadelphia.navsupwssphil.mbx.cavsaar@us.navy.mil for NAVSUP WSS Philadelphia solicitations and contracts (document numbers beginning with N00383) and to usn.mechanicsburg.navsupwssmech.mbx.mech-cav-saar@us.navy.mil for NAVSUP WSS Mechanicsburg solicitations and contracts (document numbers beginning with N00104).

(09-23)

B04 – SUPTXT216-9401 (09-18) - PLACING AND PROCESSING OF ORDERS

(a) Ordering Period. The government, from time to time during the period commencing on award of this BOA and continuing for five (5) years (hereinafter called the ordering period), may place orders for supplies to be delivered hereunder. Each order placed under this agreement shall be in accordance with this agreement.

(b) Authorized Ordering Activity. A Contracting Officer of NAVSUP Weapon Systems Support may place orders under this agreement. Only such Contracting Officer has the authority to make changes to the provisions of this BOA.

(c) Ordering Procedures. Orders issued hereunder may be either priced or unpriced. Each order issued hereunder shall constitute a contract. The negotiated ceiling price for an unpriced order issued hereunder is the maximum not-to-exceed price for each order. Unpriced orders will be definitized within 180 days after the date on which the contractor submits a qualifying proposal to definitize the contractual terms, specifications, and price or the date on which the amount of funds obligated under the order is equal to more than fifty (50) percent of the ceiling price of the order is expended whichever occurs earlier. The contractor agrees to submit a Firm-Fixed Price proposal to meet this definitization schedule.

(d) Content of Orders. Orders placed hereunder will be prepared on a DD Form 1155 and will at a minimum include the following if applicable:

https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Provisions-Instructions-and-Contract/ mailto:usn.philadelphia.navsupwssphil.mbx.cavsaar@us.navy.mil mailto:usn.mechanicsburg.navsupwssmech.mbx.mech-cav-saar@us.navy.mil mailto:usn.mechanicsburg.navsupwssmech.mbx.mech-cav-saar@us.navy.mil

(1) The order number, date, and the number of this agreement.

(2) Citation of the negotiation authority under FAR 6.302.

(3) Appropriation and accounting data and special invoicing instructions.

(4) Special shipping instructions, place of delivery, place of inspection, DoD Priority designator and surveillance criticality designator.

(5) Defense Order Rating certified under the Defense Priorities and Allocations System.

(6) Descriptions and the part numbers of the particular articles to be furnished, the quantity of each, and the stock number, if available.

(7) The model designation of the end unit for which the parts ordered applies, if available.

(8) For priced orders, the agreed upon delivery schedules, firm unit prices, firm extended amounts and a total firm price.

(9) For unpriced orders, a desired delivery schedule and a total ceiling price.

(10) A DD form 1423 setting forth the data ordered.

B05 – PRICED ORDERS

(a) Priced orders under this BOA shall be those in which the contractor submits a firm-fixed price quote, offer, or proposal, and delivery schedule in response to a Request for Quotation (RFQ) or Request for Proposal (RFP), and all terms and conditions have been agreed upon prior to issuance of the order, including: (i) with respect to Orders for repair, the pricing for Teardown and Evaluation (TD&E) and repair of government furnished property; and (ii) with respect to all Orders, delivery.

B06 – UNPRICED ORDERS

(a) Unpriced orders under this BOA shall be those in which urgency exists that does not allow the Contracting office to negotiate a definitive contract action in sufficient time to meet the Government's requirements; and it is in the Government's interest that contract performance can begin immediately.

(b) Unpriced Purchase Orders(also known as “Monetary Limitation Orders”) shall be issued pursuant to the requirements of FAR Part 13 and Undefinitized Contractual Action Orders (also known as “Ceiling Priced Orders”) shall be issued pursuant to the requirements of DFARS 217.74

(c) Unpriced Purchase Orders shall contain a Monetary Limitation price at the time of issuance. An Undefinitized Contractual Action Order shall contain a Not-To-Exceed price at the time of issuance.

(d) Failure to reach agreement on price for any order issued before its price is established is a dispute under the Disputes clause, FAR 52.233-1.

(e) Monetary Limitation Orders. When an RFQ is issued under Simplified Acquisition Procedures (FAR Part 13) and the estimated contract price is under the Simplified Acquisition Threshold, a realistic monetary limitation shall be established for the order and the order shall be funded in the amount of the monetary limitation.

(1) All monetary limitation orders shall include the clause at FAR 52.216-24 with the fill-ins completed. Any modification of an order to adjust the monetary limitation shall make corresponding adjustments to FAR 52.216-24.

(f) Ceiling Priced Orders. When an RFQ or RFP is issued and the estimated contract price is at or above the Simplified Acquisition

Threshold, a Not-To-Exceed price shall be established for the order and the order shall initially be funded at not more than forty-nine percent (49%) of the Not-To-Exceed price. Prior to defnitization and in the Government’s discretion, a modification may be issued to increase the obligated amount to not more than seventy-five percent (75%) of the Not-To-Exceed price after receipt by the Government of the contractor’s qualifying proposal for a firm-fixed-price order.

(1) All Ceiling Priced Orders shall include the clause at DFARS 252.217-7027 with all fill-ins completed.

(2) All Ceiling Priced Orders shall include the clause at FAR 52.216-24 with the fill-ins completed. Any modification to the obligated amount prior to definitization shall make corresponding adjustments to FAR 52.216-24.

(3) For any Ceiling Priced Order, the submission by the contractor of a qualifying proposal in accordance with the definitization schedule is a material element of the contract. The contractor shall submit its firm-fixed-price proposal for definitization to the PCO within thirty (30) days of its receipt of Government Property to be repaired under the Order in the case of an Order for repair, and within thirty (30) days of its recept of the Order in the case of an Order that is not for repair, unless otherwise established in clause 252.217-7027, Contract Definitization in the Order. The contractor’s proposal submission shall be in the form of a “qualifying proposal” as defined by DFARS 217.7401; and contractor shall include in its proposal a firm delivery schedule, if not already established, as well as cost or pricing data, as may be required in accordance with FAR subpart 15.4 and DFARS subpart 215.4.

B07 – ADDITIONAL MATTERS RELATIVE TO THE ISSUANCE OF ORDERS FOR REPAIR

(a) The induction period for repairs under each Order for repair shall be 365 days from the date of the order unless otherwise specified in the order.

(b) The contractor shall provide appropriate and adequate storage for all items received in accordance with an Order for repair under this BOA.

(c) All Orders, whether priced or unpriced, will be effective and binding upon issuance by the contracting officer, unless the Order specifically provides the Contractor an opportunity to reject the Order.

(d) Contractor shall not perform any work under this BOA that is not associated with a funded and executed Order.

(e) All contractor proposals and orders issued under this BOA shall include a reference to the Procurement Instrument Identifier for this BOA (Block 2 of the Standard Form 26).

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C01 - INPUT OF ARTICLES TO BE REPAIRED AND/OR MODIFIED

(a) Articles to be repaired and/or modified under this agreement, as shown on Attachment "A", will be shipped at the Government's expense to the plant of the contractor at:

Sikorsky Aircraft Corporation (CAGE: 78286) 6900 Main Street Stratford, CT

06614-1378, USA

The contractor shall receive for each shipment a list (referencing this agreement number) of the articles included in the shipment.

(b) Upon receipt of such articles, the contractor shall:

(1) Verify that the articles received corresponds with the list of the articles furnished for such shipment; and further verify that the articles received are covered by the applicable BOA Order;

(2) Segregate those assets that were improperly sent to the contractor, contact PCO for return shipping instructions, and return improperly sent items to the Government;

(3) Advise the PCO if any portion of the required repair is covered under a warranty; or is a result of the furnishing by the contractor of articles that were defective in material and/or workmanship, or otherwise not in conformance with the requirements of the contract under which such articles were originally furnished;

(4) Further advise the PCO of the results of the foregoing preliminary inspection, together with a list of the articles and quantities required to be repaired.

C02 - SPECIFICATIONS FOR REPAIR/MODIFICATION/STATEMENT OF WORK

1.0 SCOPE

1.1. General. The items to be furnished hereunder are Government Furnished Property (GFP) and shall be repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this BOA. Equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s), will not be provided by the Government and shall be the responsibility of the Contractor unless expressly provided. This limitation regarding the furnishing of equipment applies notwithstanding any reference to the contrary in any drawing, manual, or specification for the BOA items.

1.2. Repair Requirements. The Contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to return the items (see Attachment A for a list of these items) to a Ready For Issue (RFI) condition.

RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate. The Contractor shall identify the governing repair manual(s)/documents for each item covered by this BOA. On the same attachment, the Contractor must identify the facility for each item where repair, including final test and inspection, is completed.

1.2.1. Changes to repair manuals/documents and changes to drawings or specifications for the manufacture of parts utilized in these repairs require Procuring Contracting Officer (PCO) approval. In addition, as provided for in Section 2.3, requests for changes to a repair source or repair facility shall be submitted in writing to the PCO and must be approved prior to making any such change.

1.2.2. Any repairs performed using unapproved changes to manuals, drawings, specifications, or unapproved changes to a repair source or facility are not permitted.

1.2.3. The Contractor is not entitled to any equitable adjustment to the price or BOA terms based on the Government’s disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility.

1.3. Beyond Physical Repair (BPR)

1.3.1. Scope. An item is BPR when the item is not capable of being repaired in accordance with the Statement of Work due to the extent of physical damage.

1.3.2. Procedures. The Contractor shall obtain written concurrence from DCMA for all units determined by the Contractor to be BPR. All such determinations, including the basis for the determination and the DCMA written concurrence shall be provided by the Contractor to the PCO, with a copy to the Inventory Manager (IM). After receipt of the required documentation, the PCO shall provide the Contractor disposition instructions, either requesting the submission of a proposal for BPR pricing, or ordering the disposal of the item. If asked to provide a BPR pricing proposal, the Contractor shall provide the proposal to the PCO within 30 days of receipt of the request. Any disposal ordered shall be performed by the Contractor in accordance with all applicable regulations and the Contractor’s approved Government property disposal procedures.

1.4. Beyond Economical Repair (BER)

1.4.1. Scope. An item is BER if the cost of the repair exceeds 80% of the replacement price for items identified on

Attachment A. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this BOA.

1.4.2. Procedures. The Contractor shall obtain written concurrence from DCMA for all units determined by the Contractor to be BER. All such determinations, including the basis for the determination, the repair required, the Contractor’s proposed BER price to repair, and the DCMA written concurrence, shall be provided by the Contractor to the PCO, with a copy to the IM. After receipt of the required documentation, the PCO shall provide the Contractor disposition instructions, either providing contractual authority for repair of the item or ordering the disposal of the item. The Contractor is not authorized to proceed with the repair until notification is received from the PCO. If provided disposition disposal instructions, the contractor shall submit a proposal for disposal pricing to the PCO within 30 days of receipt of these instructions. Any disposal ordered shall be performed by the Contractor in accordance with all applicable regulations and the Contractor’s approved Government property disposal procedures.

1.4.3. The following additional procedures may apply, if authorized, for the replacement of a BER SRA (Shop Repairable Assembly) within a WRA (Weapons Repairable Assembly) when the SRA has not been separately inducted. The Contractor may request authorization to:

Ship in place an accepted item from an existing spares or repair BOA, if any, or MILSTRIP the SRA(s), Authorization to ship in place or MILSTRIP must be provided by the IM in writing to the Contractor and must be appropriately documented in accordance with the WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK. The Contractor must provide written notification of any item shipped in place or MILSTRIPed to the PCO and an equitable adjustment may be required. If authorization to ship in place or MILSTRIP is not provided, the Contractor shall contact the PCO for further instructions.

1.5. Missing on Induction (MOI).

1.5.1. Scope. A WRA is subject to this MOI provision if the item received by the Contractor for repair is missing one or more SRAs and the SRA is not a separately inducted item. Contractor replacement of MOI SRAs is not included in the contract price. Items received by the Contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the Contractor under this [BOA\CONTRACT].

1.5.2. Procedures. The Contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The Contractor shall provide written notice of all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the IM with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The Contractor shall not proceed with repair of WRAs with MOI SRAs until instructions on how to proceed are provided to the Contractor.

1.5.3. The following additional procedures may apply, if authorized, for the replacement of a MOI SRA within a WRA.

The Contractor may request authorization to:

Ship in place an accepted item from an existing spares or repair BOA, if any, or MILSTRIP the SRA(s), Authorization to ship in place or MILSTRIP must be provided by the IM in writing to the Contractor and must be appropriately documented in accordance with the WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK. If either of these options is not authorized, the Contractor shall contact the PCO for further instructions.

1.6. Swapping SRAs

1.6.1. Scope. On rare occasions the Contractor may request authority to replace a failed but repairable SRA (within an inducted WRA) that is not BPR, BER or MOI.

1.6.2. Procedures. The Contractor may request authorization to replace the failed SRA unit from the Contractor’s production line, by MILSTRIP for an RFI item from Government stock, or with another repairable WRA, i.e.

cannibalization. Permission from the PCO must be obtained and an equitable adjustment may be required.

Authorization to ship in place from the Contractor’s production line or MILSTRIP must be appropriately documented in accordance with the WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF

WORK. Although permission from the PCO is required if the SRA is obtained from another repairable WRA (cannibalized), that transaction does not have to be input into CAV.

2.0 PARTS AND MATERIAL

2.1. The Contractor is responsible for supplying all parts and material necessary to perform the required repairs under this BOA unless parts or material are specifically identified. All parts and material used in performance of this BOA shall be in accordance with the latest approved revision of applicable drawings and specifications. The Contractor shall ensure it has access for the duration of this BOA to updated drawings and specifications for parts and material required for repairs performed under this BOA. Any change to such parts/material drawings or specifications requires Government PCO approval.

2.2. All parts and material shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization of piece parts must be approved by the PCO. Cannibalization of units that have not been inducted is not authorized and requires specific additional approval by the PCO. Cannibalization or swapping, including any actions authorized under paragraphs 1.5 and 1.6, shall not render an item BER or BPR.

2.3. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval. However, if the Contractor has been delegated authority in writing by another Navy Command to approve a change in manufacturing source or a manufacturing facility, the Contractor may implement such a change after notifying the PCO, providing a copy of such delegation to the PCO, and receiving acknowledgment of such delegation from the PCO.

2.3.1. Where there has been a change to a manufacturing source, the Contractor shall complete all qualification testing that was required when that item or component was originally qualified. Any changes in such testing shall be submitted to the Contracting Officer for Government review and approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are not authorized. The Contractor is not authorized to deliver any items until such testing (including revised testing as properly approved) has been completed and the delivered items are repaired/manufactured in accordance with the qualification requirements package.

2.3.2. The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government’s disapproval of a requested change to the drawings, specifications or manufacturing source or facility.

2.4. Purchased Material Control and Parts Control. The Contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, ensure that the parts and material purchased are in compliance with the requirements of this BOA.

2.5. Receiving Inspection of Purchased Parts and Material. Purchased parts and material shall be inspected by the Contractor upon receipt at the Contractor’s facility to ensure conformance with all requirements of the applicable drawings and specifications. Alternatively, the Contractor shall submit, prior to contract award, evidence for Government review and approval of a purchased parts and material system which provides for adequate inspection to ensure parts and material conform with all requirements of the applicable drawings and specifications.

2.5.1. Evidence of such inspections shall be maintained by the Contractor or Subcontractor for Government review at least twelve (12) months following the conclusion of the contract. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and processes with appropriate pass/fail criteria, such as certifications, and actual dimensional readings.

3.0 INSPECTION PROVISIONS

3.1. Government inspection shall be in accordance with FAR 52.246-2, Inspection of Supplies - Fixed-Price incorporated by reference in Section E, at source by DCMA unless otherwise specified in the BOA or as authorized by the Administrative Contracting Officer (ACO) or PCO. Acceptance testing shall be conducted under the surveillance of the DCMA QAR.

These tests shall include all tests necessary to assure that the items repaired conform to the performance required to provide Ready For-Issue material. The DCMA retains the authority to require the Contractor to conduct or reconduct any tests deemed necessary to ensure compliance with the manuals, drawings and specifications applicable to this BOA.

C03 – WEB-BASED COMMERCIAL ASSET VISIBLITY (WEBCAVS) STATEMENT OF WORK (SOW)

The CAV Statement of Work (SOW) is located at: https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems- Support\Provisions-Instructions-and-Contract/; and incorporated herein by reference. The CAV SOW applies to all orders for repair.

C04 - SPECIFICATION FOR CONSUMABLE PARTS (CONTRACTOR-FURNISHED)

The contractor shall furnish on an "as required" basis all parts required to complete servicing of repairable articles hereunder within established delivery schedules. Such parts shall be in accordance with applicable drawings and specifications.

https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Provisions-Instructions-and-Contract/ https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Provisions-Instructions-and-Contract/

C05 – WSSTERMCZ04 - GOVERNMENT INDUSTRY DATA EXCHANGE PROGRAM (GIDEP)

(applicable to orders >$500,000, or lower value when Contracting Officer provides notice that term will apply)

a. The Contractor will actively participate in the Government Industry Data Exchange Program (GIDEP) per the Operations

Manual (OM). The Contractor will submit information concerning critical or major noncomformances, as defined in FAR 46.101, to the GIDEP informantion system.

b. The Contractor will insert paragraph (a) of this clause in any subcontract when deemed necessary by the Contractor. When so inserted, the word "contractor" will be changed to "subcontractor."

c. The Contractor will, when it elects not to insert paragraph (a) in a subcontract, provide the subcontractor any GIDEP data which may be pertinent to items of its manufacture and verify that the subcontractor utilizes any such data.

d. The Contractor shall, whether it elects to insert paragraph (a) in a subcontract or not, verify that the subcontractor utilizes and provides feedback on any GIDEP data that may be pertinent to items of its manufacture.

e. Associated Data Item Description (DID) DI-QCIC-80125B: Alert/Safe-Alert Reporting to GIDEP.

(06-17)

C06 - WSSTERMCZ01 – CONFIGURATION MANAGEMENT AND CONTROLS

1.0 Configuration Management

NOTE: All references to the “Procurement Contracting Officer” or “PCO” in this Local Term are to the NAVSUP WSS PCO.

1.1 The cognizant Naval Air Systems Command (NAVAIR) Program Manager will maintain configuration control and change authority for all items in this contract.

1.2 In accordance with the configuration management provisions of this contract, the Contractor must maintain the total Equipment baseline configuration of the parts on this contract including, but not limited to, hardware, software and firmware.

NOTE: Additional information and guidance relative to engineering changes and variances may be obtained by contacting the system’s cognizant NAVAIR Program Office.

2.0 Engineering Changes

2.1 The Government will not be responsible for any contract delay or disruption or any increased costs of performance of the Contractor due to a misclassification of an Engineering Change Proposal (ECP) by the Contractor, including those costs associated with replacement of delivered items resulting from such a misclassification. ECP’s are classified as Class I (Major) or Class II (Minor). For detailed classification criteria refer to the DD Form 1692 instructions sheet. ECPs must be prepared in accordance with DI-SESS- 80639E, Engineering Change Proposal (ECP).

2.1.1 Class I (Major) Changes: The Contractor must coordinate with the cognizant NAVAIR Program Office prior to any Class I ECP submission. The Contractor must notify the NAVSUP WSS Procurement Contracting Officer (PCO) of any pending or approved Class I engineering changes with another Government activity that the Contractor proposes to incorporate under this contract. The cognizant NAVAIR Program Office will approve or disapprove of all Class I changes. Any approved Class I change may necessitate contract changes by the contracting officer, which changes may be handled under the Changes clause of this contract, FAR 52.243-1.

The Contractor must not implement a Class I change on this contract until a contract modification is issued by the PCO.

2.1.2 Class II (Minor) Changes: Any Class II change involving a Critical Safety Item (CSI) must be submitted to the NAVSUP WSS PCO for NAVAIR Program Office approval unless NAVAIR has delegated approval authority to the cognizant Defense Contract Management Agency (DCMA) Contract Management Office (CMO). For Class II changes to items without a criticality determination, the items will be considered CSI for the purposes of processing in accordance with this paragraph. Class II changes related to non-CSI's must be submitted to the cognizant DCMA CMO for concurrence in classification and may be implemented only upon receiving DCMA concurrence. Class II changes must be made at no additional cost to the Government.

2.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government’s disapproval of a Class I or Class II ECP.

3.0 Variances

3.1 The Contractor must not deliver any item for acceptance by the Government that incorporates a known departure from product definition information unless a Request for Variance (RFV) has been approved. Authorized variances are a temporary departure from the requirements only and do not authorize a change to the item’s approved configuration. RFV’s are classified as Critical, Major, or Minor. For detailed classification criteria refer to the DD Form 1694 instructions sheet. Any variance requests to CSI’s must be classified as major, at a minimum. For variances to items without a criticality determination, the items will be considered CSI for the purposes of processing and classified as a major, at a minimum. Variance requests shall be prepared in accordance with DI-SESS- 80640E – Request for Variance (RFV).

3.1.1 Critical/Major Variances: The Contractor must submit all critical/major variance requests, via DCMA and the NAVSUP WSS PCO, to the cognizant NAVAIR Program Office for approval or disapproval. All approved critical/major variances require a contract modification by the NAVSUP WSS PCO prior to final inspection and acceptance of the items.

3.1.2 Minor Variances: For minor RFVs, delivery and/or shipment of such items under this contract is not permitted until approved by the cognizant DCMA CMO.

3.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government’s disapproval of a critical, major, or minor variance.

(4-23)

SECTION D - PACKAGING AND MARKING

D01 - WSSTERMDZ03 - PRESERVATION, PACKAGING, PACKING AND MARKING

The contractor shall preserve, package, pack and mark all items as cited below. Where specifications or standards are cited herein the latest revision of that specification or standard shall apply.

1. PRESERVATION REQUIREMENTS

a. SYSTEM STOCK SHIPMENTS - The contractor shall preserve all items intended to enter the military distribution system for stock in accordance with the MIL-STD-2073-1, “Standard Practice for Military Packaging”, Packaging Requirements Code specified in the Schedule. When a Specialized Preservation Code/Method of Preservation (MOP) (Table J-Ia) is specified, and one or more of the following packaging fields (WM, CUD, CT, UC) value is a 00 (numeric), the Specialized Preservation/MOP procedure and materials takes precedence. Contractors should disregard the LP field and third digit of the PACK field and use the Unit Container Level (UCL) to identify the level of packing protection the unit container meets for packing requirements. When HM = D, the item is regulated in accordance with Title 49 Code of Federal Regulations (CFR); when HM = N the item is not regulated for transportation.

1) When a specified packaging material has an associated Qualified Products List (QPL), the contractor shall use only packaging materials produced by a manufacturer listed on the applicable QPL. Barrier materials that have QPLs are MIL-PRF-131, MIL-PRF-81705, MIL-PRF-22191, MIL-PRF-3420 and MIL-PRF-22019. Sources for QPL material can be obtained from the Qualified Products Database at http://qpldocs.dla.mil/.

b. IMMEDIATE USE/INSTALLATION AND PART NUMBER BUY SHIPMENTS – Government PCO or ACO approval is required to use the packaging standards outlined in this paragraph. Any national stock numbered (NSN) item required for immediate use (used or consumed within 7 days of receipt) or direct installation, or part numbered item (authority granted to ship without NSN) shall be preserved and packed in accordance with ASTM D3951, “Standard Practice for Commercial Packaging”, for all shipments to a Continental United States (CONUS) government activity or contractor-owned facility. All material destined for overseas shipment (OCONUS) shall be preserved in accordance with MIL-STD-2073-1.

c. GOVERNMENT-OWNED MATERIAL – In the event that the contract expires, is terminated, or completed, and

Government-owned material is to be returned to the supply system, the contractor shall preserve and package this material in accordance with the requirements of paragraph 1.a.

2. PROTECTION FROM DEGRADATION DUE TO ELECTROSTATIC (ES)/ELECTROMAGNETIC (EM) FORCES

a. When ASTM D3951 is authorized for packaging and the item is considered ESD Sensitive (ESDS), protection shall be in accordance with ANSI/ESD S20.20-2014, “For the Development of an ESD Control Program for – Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices).”

b. When MIL-STD-2073-1 is specified and the preservation method code (PMT) in the solicitation does not specify ESD/EM protection (PMT = GX) and the contractor’s proposed item of supply is subject to degradation from ES/EM forces, contractors shall provide recommended packaging data with their proposals/quotes.

3. PACKING REQUIREMENTS – The contractor shall pack as follows:

Domestic Shipments (CONUS): Level B http://qpldocs.dla.mil/

Overseas Shipments (OCONUS) (including Navy ships at sea):

Via air, FPO, APO Level B

Via freight forwarder Level B

Via surface Level A

Exterior shipping containers for Packing Levels A and B are listed in MIL-STD-2073-1, Appendix C, Table C.II. Long-life reusable containers and wood containers are shipping containers which do not require overpacking for shipment.

4. MARKING REQUIREMENTS - All unit, intermediate and shipping containers shall be marked in accordance with MIL-STD-

129. In addition, the following specific requirements apply:

a. ADDITIONAL MARKING FOR SPARES ONLY – Each MIL-STD-129 label shall also include the following:

1) Procurement Instrument Identifier (PIID) – the 13-digit contract order number,

2) Contract Line Item Number (CLIN) – the 4-digit individual line item number (e.g. 0001, 0002, etc.), and

3) SubCLIN – the 6-digit sub line item number (e.g. 0001AA, 0001AB, 0002AA, 0002AB, etc.).

b. DEPOT LEVEL REPAIRABLE (DLR) LABELS

1) Items identified with a Cognizance (COG) Code of either “7” or an even number preceding the NSN, excluding 6A, 6H and 6X COGs (e.g. 7RH 5826-014289999), are defined as Depot Level Repairable (DLR) items. DLR items require that a DLR label be placed on the outside of the unit, intermediate and shipping containers as close to the bar code label as possible.

2) Labels are available via the Naval Forms Online website: https://forms.documentservices.dla.mil/order/. The website will advise the procedures for ordering and establishing an account.

3) NAVSUP WSS authorizes contractors to create and print their own DLR labels.

Labels shall follow the standard size and font options listed in below chart. Text shall be in all upper case letters of the same style font. The label used shall be sized proportionate to the size of the container. Labels shall be horizontally printed and consist of yellow “DLR” text font on a solid blue background. Labels shall meet requirements of MIL-STD-129 section 4.2.2. Labels shall be of a water-resistant grade of paper, film, or plastic, coated on one side with water-insoluble, permanent type adhesive. The adhesive shall adhere to metal, plastic, aluminum or fiberboard surfaces under high and low temperatures. Labels shall have a finish suitable for printing and writing on with ink without feathering or spreading, be capable of withstanding normal handling and storage conditions, and remain securely in position. Application specific performance criteria and durability requirements to ensure functionality in various climatic environments should be tailored, if required, using MIL-PRF-61002. MIL-PRF-61002 can be used as an acquisition tool when labels presently being used are not performing satisfactorily or when new conditions or applications require special label stock for those particular situations.

NSN DESCRIPTION QUANTITY

PER UNIT

PACKAGE

APPLICATION FORM NUMBER

0108LF5055300 DLR Label 2 in. x 3 in.

100 Unit Container

NAVSUP 1397-1

0108LF5055000 DLR Label 3 in. x 5 in.

100 Intermediate / Shipping Container

NAVSUP 1397

c. SPECIAL MATERIAL IDENTIFICATION CODE (SMIC) FOR NAVSUP WSS MARITIME REQUIREMENTS ONLY

1) Certain Program-related items are identified by a two-position SMIC, which appears as a suffix to the NSN (e.g. 1H 4730 009001317 L1), and require special markings. Containers shall be marked with letters, maximum two inches high on two (2) sides and two (2) ends as follows:

SMIC MARKINGS COLOR TYPE CONTAINER

https://forms.documentservices.dla.mil/order/

L1 LEVEL 1 RED Unit, intermediate and shipping (size permitting)

S1 SURFACE

LEVEL 1

RED Unit, intermediate and shipping (size permitting)

D4/D5/D7 DSS-SOC RED Unit, intermediate and shipping (size permitting)

C1 * LEVEL 1 SPECIAL

CLEAN O2-N2

GREEN Unit, intermediate and shipping

CP/VG * SPECIAL CLEAN

O2-N2

GREEN Unit, intermediate and shipping

D0/D6/D8 * DSS-SOC SPECIAL CLEAN

O2-N2

GREEN Unit, intermediate and shipping

VU FBW SFCC VU BLUE Unit, intermediate and shipping (size permitting)

SW FBW SFCC SW BLUE Unit, intermediate and shipping (size permitting)

Q3/Q5 Q3 or Q5 RED Unit, intermediate and shipping

* denotes Oxygen Clean requirements in accordance with MIL-STD-1330 “Precision Cleaning and Testing of Shipboard Oxygen, Helium, Helium-Oxygen, Nitrogen, and Hydrogen Systems.”

5. PALLETIZATION. Palletization of shipments shall be accomplished in accordance with MIL-STD-147 “DOD Standard Practice: Palletized Unit Loads.” Failure to meet these palletization/packaging requirements and measures, without a written waiver from the PCO or ACO, may result in charges back to the contractor for repalletization and/or repackaging of items. Pallets shall conform to the requirements of American National Standards Institute, Material Handling-MH1-2016, Pallets, Slip Sheets, and Other Bases for Unit Loads. MH1-2016 may be obtained at the following website: http://www.mhi.org.

a. General Purpose Unit Loads - When shipping directly to a Navy afloat unit, pallets meeting MH1-2016, Part No. MH1/9- 02SW4048 or MH1/9-10BW4048 for unit loads under 1,500 pounds and MH1/9-03SW4048 for unit loads over 1,500 pounds shall be used.

b. Hazardous Material Unit Loads - Unless otherwise specified in the contract or purchase order hazardous material containers, except cylinders and 55 gallon drums, shall be palletized utilizing MH1-2016 Part No. MH1/9-07SW4848 pallets.

c.Use of nonstandard commercial pallets is prohibited.

6. WOOD PACKAGING MATERIAL (WPM). All shipments destined to the DOD must be treated and marked in accordance with the International Standards for Phytosanitary Measures Guidelines for Regulating Wood Packaging Material in International Trade (ISPM 15) for OCONUS shipments.

a. For all WPM furnished under this contract the contractor shall ensure the American Lumber Standards Committee (ALSC) approved mark is applied to every shipment regardless of destination.

b. Failure to comply with the requirements of ISPM 15 may result in refusal, destruction or treatment of WPM at the point of receipt and the associated costs charged back to the contractor.

7. NAVY SHELF-LIFE PROGRAM. Navy shelf-life requirements are listed under the item description in a 3-digit alpha/numeric code. Position one (1) is the DOD shelf-life code, defining the type of shelf-life for an item (Type I, non-extendible or Type II, extendible), and the number of months an item can remain ready for issue in a Navy specified package. Positions two (2) and three (3) combined form the Navy-unique shelf-life action codes used by storage activities, and do not impose any requirements on the contractor. The contractor shall use the applicable shelf-life paragraphs and table in MIL-STD-129 to apply either Type I or Type II shelf-life markings to an item's unit, intermediate and shipping containers. Contractors will ensure that at least eighty-five percent (85%) of the Navy shelf-life requirement is remaining when received by the first government activity.

8. REUSABLE NSN CONTAINERS. An item that has an NSN assigned in the “Container NSN” field (e.g . 8145 012622982) requires shipment in a reusable shipping and storage container.

a. REUSABLE CONTAINERS FOR NAVSUP WSS, MARITIME REQUIREMENTS - Reusable NSN containers for maritime material (designated by a COG Code of “7E”, “7G” and “7H”) shall be provided as contractor-furnished material (CFM).

http://www.mhi.org/ https://www.ippc.int/en/publications/640/

b. REUSABLE CONTAINERS FOR NAVSUP WSS, AVIATION REQUIREMENTS - Reusable NSN containers (excluding fiberboard and most wood) for aviation material (designated by a COG Code of “7R”, “6K” or “0R”) shall be provided as government-furnished material (GFM). Fast pack containers will not be provided as GFM. To obtain GFM reusable containers, the contractor must request via email NAVSUPCRF.fct@navy.mil at least 90 days prior to the anticipated shipping date, 30 days prior for repair contracts. If the Navy’s Container Management Area (CMA) informs the contractor that containers are unavailable, the following alternate packaging requirements apply. The unavailability of reusable containers shall not be an excusable delivery delay.

ALTERNATE PACKAGING REQUIREMENTS FOR ITEMS ASSIGNED THE FOLLOWING CONTAINERS

Container NSN Container Part Number (80132) Alternate Packaging Code

IAW MIL-STD-2073-1

8145 002609548 P069-2 N 001 000 GX 1 00 K3 LT B ED

UCL = B

SPMK = 39

PACK = QFF

8145 002609556 P069-1 8145 002609559 P069-3 8145 002609562 P069-4 8145 010124088 P069-6 8145 010140440 P069-5 8145 011644073 P069-7 8145 012622982 15450-1 If MOP/PMT = GX

N 001 000 GX 1 00 K3 GH Z ED

Z= use 1.5” of “GH” cushioning between barrier bag and Unit Container

UCL = B

SPMK = 39

PACK = QFF

For all other MOPs/PMTs

N 001 000 51 1 00 EA GH F ED

UCL = B

SPMK = 03

PACK = QFF

8145 012622983 15450-2 8145 012622984 15450-3 8145 012622985 15450-4 8145 012622986 15450-5

8145 012622987 15450-6

8145 012622988 15450-7

c. All excess empty reusable shipping and storage containers shall be turned-in to the nearest Container Reuse and Refurbishment Center (CRRC). CRRC locations/points of contact: Program Manager - 215-697-2063

Norfolk, VA - 757-445-9099 ext. 124 Yokosuka, JAPAN - 011-81-46-816-6304

Cherry Point, NC - 252-466-2331 Lemoore, CA - 559-998-0220 Jacksonville, FL - 904-542-1014 Okinawa, JAPAN - 011-81-46-816-6304

San Diego, CA - 619-545-8360 Iwakuni, JAPAN - 011-81-46-816-6304 Puget Sound, WA - 360-476-9777 Bahrain - 011-318-439-9553

d. The stock-numbered, long-life, reusable containers identified herein as GFM are property of the U.S. Navy and only shall be used to fulfill orders from the Navy and U.S. Marine Corps; these containers shall not be used to fulfill orders from the U.S. Army, U.S. Air Force, any other agency of the U.S. Government or Foreign Military Sales (FMS) customer.

9. REUSABLE NSN CONTAINERS FOR FOREIGN MILITARY SALES (FMS), JOINT PROGRAM OFFICE (JPO) OR

OTHER FOREIGN FORCES ACQUISITION

a. Reusable shipping and storage containers shall be provided as CONTRACTOR-FURNISHED MATERIAL (CFM), unless otherwise specified.

b. Contractors may tender offers including alternate, non-reusable, packaging methods and be considered responsive.

10. HAZARDOUS MATERIALS. This section applies when items to be delivered under this contract are considered hazardous materials as defined by 49 CFR, FED-STD-313, or by the Government's technical representative.

mailto:NAVSUPCRF.fct@navy.mil

a. Packaging and marking for hazardous materials shall comply with applicable requirements for Performance Oriented Packaging (POP) contained in 49 CFR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .