(DRAFT) Section B- Schedule of Supplies-Services.xls

XLS spreadsheet 484 KB Posted

Attached to
Small Format Black & White Copier/Printer Production Equipment Federal contract opportunity
Solicitation number
SA4705-11-R-0080
Issued by
Defense Logistics Agency

About this file

(DRAFT) Section B- Schedule of Supplies/Services

View the file

Other files for this federal contract opportunity

Other files attached to Small Format Black & White Copier/Printer Production Equipment, newest first.
File Type Posted
xerox idiq pricing for FBO.xlsx XLSX spreadsheet
SA470510R0080Amend 0002.pdf PDF
Jul 19 Q A.pdf PDF
SF1449 solicitation —
Attchmnt 1a- Equipment Specification Requirements —
SKMBT_50111071206190.pdf PDF
Attchmnt 1a- Equipment Specification Requirements —
Solicitation —
Q A July 11 2011-noon.pdf PDF
Q A July 11 2011.pdf PDF
Solicitation —
Q A July 7 2011 -Noon.pdf PDF
Q A July 7 2011.pdf PDF
questions pending answers.pdf PDF
revised Q A fro July 1 2011.pdf PDF
Q A July 5 2011.pdf PDF
Q A as of July 1.pdf PDF
Q and A —
Solicitation —
Attchmnt 2- Facility Locations —
Section B - Schedule of Supplies-Services —
Attachment 1 -SOW —
Attchmnt 1a- Equipment Specification Requirements —
Solicitation —
Attachment 1c- JDF File Formats —
Attchmnt 1b- Configuration Options —
Attchmnt 3- Existing Device Locations —
Additional Ques-Responses1.docx DOCX document
Pre-Solicitation Conference.pdf PDF
(DRAFT) DELL J A.pdf PDF
(DRAFT) Attachment 1c- JDF File Formats.zip ZIP file
(DRAFT) Solicitation.pdf PDF
(DRAFT) Attchmnt 1a- Equipment Specification Requirements.xlsx XLSX spreadsheet
(DRAFT) Attachment 1 SOW.pdf PDF
(DRAFT) Attchmnt 1b- Configuration Options.xlsx XLSX spreadsheet
(DRAFT) Attchmnt 2- Facility Locations.xls XLS spreadsheet
(DRAFT) Attchmnt 3- Existing Device Locations.xls XLS spreadsheet
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

(DRAFT) Instructions for Completion of Pricing Matrices.
Introduction:
-Each of ten tabs herein labeled "Months *-* Matrix" represents a 12-month ordering period price matrix,
requiring vendor entry of pricing for supplies/services. The calculations resulting from the prices entered
on each matrix will generate totals that will flow to the "Contract Total" tab.
-The first 5 Tabs covering months 1-60 will flow to clins 0001 through 0013 in the basic ordering period,
which includes purchase of devices, components, maintenance, software, overages and device removal.
-The remaining 5 tabs covering months 61-120 will flow to clins 1008 through 1012 in the option 1
ordering period, which includes only maintenance and overages.
-Offerors can track their "Estimated Contract Total With Option" in cell G68 of the "Contract Total" tab.
This will be the total used for price analysis among offers.
Pricing:
-Pricing for each supply/service is separated by usage bands; 8,9,10,11,12,13, except for the following:
1) Additional equipment/software purchased; 2) Additional add-on component maintenance;
3) Additional equipment/software maintenance.
Offeror Pricing will be entered as follows:
-Offerors will only type entries in column "E" of each tab, colored in BLUE. The Government wishes all
items to be priced, regardless of the number indicated in the "Estimated Quantity" column.
(A) First 5 tabs covering the basic 60 month ordering period (Months 1-60):
1. Equipment Purchase---(Ref. E-1 thru E-6 on matrices) A single unit price correcponding to each basic
device that was detailed in offerors response to attachment 1a.
--A single price for each component or configuration option listed.
2. Add'l Equip/Software--(Ref. E-7 on matrix) A single unit price for document scanners & PC/workstation
(PC/workstation price should include next business day maintenance for 5 years.)
--A single unit price for a document software and Print MIS license fee.
3. Basic Maintenacne--(Ref. M-1 on matrix) A single monthly price for each maintenance option listed.
--(Ref. M-2 on matrix) A single monthly price for maintenance on document
scanners and additional add-on components, if applicable.
4. Add'l Equip/Software--(Ref. M-3 on matrix) A single annual maint price per document software license.
MaintenanceA single annual maintenance price per Print MIS software license.
5. Extended Hours Maint.--(Ref. M-4 on matrix) Weekly extended hours maintenance prices as detailed
for a 2nd and 3rd shift; and weekend units priced as 'each'.
6. Overages--(Ref. O-1 on matrix) A single unit price for each overage click past the monthly
allowance for all devices in each of their respective usage bands.
7. Removal--(Ref. R-1 on matrix) A single unit price for removal of each device replaced
in their respective usage band.
(B) Remaining 5 tabs covering the 60 month option ordering period (months 61-120):
1. Basic Maintenacne--(Ref. M-5 on matrix) A single monthly price for each maintenance option listed.
--(Ref. M-6 on matrix) A single monthly price for maintenance on document
scanners and additional add-on components, if applicable.
2. Add'l Equip/Software--(Ref. M-7 on matrix) A single annual maint price per document software license.
MaintenanceA single annual maintenance price per Print MIS software license.
3. Extended Hours Maint.--(Ref. M-8 on matrix) Weekly extended hours maintenance prices as detailed
for a 2nd and 3rd shift; and weekend units priced as 'each'.
4. Overages--(Ref. O-2 on matrix) A single unit price for each overage click past the monthly
allowance for all devices in each of their respective usage bands.

Contract Total

(DRAFT) Schedule of Supplies/Services
CLINDESCRIPTIONEST. QTYU/IU/PESTIMATED TOTAL PRICE1-1213-2425-3637-4849-60
BASIC ORDERING PERIOD - MONTHS 1-60
EQUIPMENT PURCHASE with Components
See attachment 1a- [Equipment Specification Requirements], for a description of requirements for each usage band.
See attachment 1b- [Configuration Options] for a list of possible configurations.
USAGE BAND 8

Typical Monthly Volume Range 100K to 300K

0001Estimated Purchase of Usage Band 8 Machines with components
(See Ref. E-1 on applicable "Months __-__Matrix" for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
USAGE BAND 9

Typical Monthly Volume Range 300K to 500K

0002Estimated Purchase of Usage Band 9 Machines with components
(See Ref. E-2 on applicable "Months __-__Matrix" for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
USAGE BAND 10

Typical Monthly Volume Range 500K to 800K

0003Estimated Purchase of Usage Band 10 Machines with components
(See Ref. E-3 on applicable "Months __-__Matrix" for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
USAGE BAND 11

Typical Monthly Volume Range 800K to 1,200K

0004Estimated Purchase of Usage Band 11 Machines with components
(See Ref. E-4 on applicable "Months __-__Matrix" for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
USAGE BAND 12

Typical Monthly Volume Range 1,200K to 1,500K

0005Estimated Purchase of Usage Band 12 Machines with components
(See Ref. E-5 on applicable "Months __-__ Matrix" for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
USAGE BAND 13

Typical Monthly Volume Range 1,500K to 2,500K

0006Estimated Purchase of Usage Band 13 Machines with components
(See Ref. E-6 on applicable "Months __-__ Matrix" for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
Total Estimated equipment purchase with components.$0$0.00$0.00$0.00$0.00$0.00
Additional Equipment/Software Purchase
See attachment 1a- [Equipment Specification Requirements], for a description of requirements that make up this CLIN. Items are not tied to a specific usage band.
0007Document Scanner, PC/Work Station, Document Software, Print MIS
(See Ref. E-7 on applicable "Months __-__ Matrix" for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
Overall Total Estimated Equipment/Software Purchase.$0
MAINTENANCE PURCHASE
BASIC MAINTENANCE
Basic Maintenance; all Usage Bands, all Machines
0008Estimated Purchase of Maintenance Services for all Usage Bands, all Machines.
(See Ref. M-1 on applicable "Months __-__ Matrix" sheet for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
Basic Maintenance; all Additional Add-on Components
0009Estimated Purchase of Maintenance Services for Additional Add-on Components
(See Ref. M-2 on applicable "Months __-__ Matrix" sheet for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
Additional Software Maintenance
0010Estimated Document Software and Print MIS Maintenance.
(See Ref. M-3 on applicable "Months __-__ Matrix" for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
Extended Hours Maintenance
Extended Hours Maintenance, all Usage Bands, all Machines
0011Estimated Purchase of Extended Hours Maintenance Services for all Machines
(See Ref. M-4 on applicable "Months __-__ Matrix" sheet for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
Total Estimated Maintenance Purchase$0
OVERAGES
OVERAGE CLICK CHARGES, ALL USAGE BANDS
0012Estimated Purchase of Overage Charges for All Usage Bands, All Machines
(See Ref. O-1 on applicable "Months __-__ Matrix" sheet for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
REMOVAL
REMOVAL CHARGES, ALL USAGE BANDS
0013Estimated Removal Charges for All Usage Bands, All Machines
(See Ref. R-1 on applicable "Months __-__ Matrix" sheet for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
Estimated Basic Contract Total - Months 1-60$0
OPTION 1. ORDERING PERIOD - MONTHS 61-120

(Maintenance & Overages only)

MAINTENANCE PURCHASE
BASIC MAINTENANCE61-7273-8485-9697-108109-120
Basic Maintenance; all Usage Bands, all Machines
1008Estimated Purchase of Maintenance Services for all Usage Bands, all Machines.
(See Ref. M-5 on applicable "Month __-__ Matrix" sheet for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
Basic Maintenance; all Additional Add-on Components
1009Estimated Purchase of Maintenance Services for Additional Add-on Components
(See Ref. M-6 on applicable "Month __-__ Matrix" sheet for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
Additional Software Maintenance
1010Estimated Document Software and COTS Print MIS Maintenance.
(See Ref. M-7 on applicable "Months __-__ Matrix" for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
Extended Hours Maintenance
Extended Hours Maintenance, all Usage Bands, all Machines
1011Estimated Purchase of Extended Hours Maintenance Services for all Machines
(See Ref. M-8 on applicable "Months __-__ Matrix" sheet for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
Total Estimated Maintenance Purchase- Option 1$0
OVERAGES
OVERAGE CLICK CHARGES, ALL USAGE BANDS
1012Estimated Purchase of Overage Charges for All Usage Bands, All Machines
(See Ref. 0-2 on applicable "Month __-__ Matrix" sheet for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
Estimated Option 1 Total - Months 61-120$0
ESTIMATED CONTRACT TOTAL WITH OPTION$0

&LSchedule of Supplies/Services&RPage &Pof &N

&LSA4705-10-R-0130&R&D

Months 1-12 Matrix

(DRAFT) PRICE MATRIX
Ref.DescriptionEstimated QuantityU/IUnit PriceEstimated

Total Price

Ordering Period - Months 1-12
Equipment Purchase
E-1USAGE BAND 8

Typical Monthly Volume Range 100K to 300K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage Band 8 Machine, Basic Configuration
(see attachment 1b- [Configuration Options] for Basic configuration Description)34EA$0.0034
Components configured with a Usage Band 8 machine
Purchase of Removable Hard Drives option for usage band 8 machine.3EA$0.003
Purchase of Booklet Maker add-on to usage band 8 machine.15EA$0.0015
Purchase of Hole Punch add-on to usage band 8 machine.8EA$0.008
Purchase of Folder add-on to usage band 8 machine.2EA$0.002
Purchase of LCDS/Sysout add-on to usage band 8 machine.3EA$0.003
Purchase of Perfect Bind add-on to usage band 8 machine.0EA$0.000
Total estimated Usage Band 8 equipment purchase with components.
(Carried over to clin 0001 on basic contract.)$0.00
E-2USAGE BAND 9

Typical Monthly Volume Range 300K to 500K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage Band 9 Machine, Basic Configuration
(see attachment 1b- [Configuration Options] for Basic configuration Description)17EA$0.0017
Components configured with a Usage Band 9 machine

(see attachment 1b- [Configuration Specifications] for a list of possible configurations)

Purchase of Removable Hard Drives option for usage band 9 machine.2EA$0.002
Purchase of Booklet Maker add-on to usage band 9 machine.6EA$0.006
Purchase of Hole Punch add-on to usage band 9 machine.5EA$0.005
Purchase of Folder add-on to usage band 9 machine.1EA$0.001
Purchase of LCDS/Sysout add-on to usage band 9 machine.4EA$0.004
Purchase of Perfect Bind add-on to usage band 9 machine.0EA$0.000
Total estimated Usage Band 9 equipment purchase with components.
(Carried over to clin 0002 on basic contract.)$0.00
E-3USAGE BAND 10

Typical Monthly Volume Range 500K to 800K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage Band 10 Machine, Basic Configuration
(see attachment 1b- [Configuration Options] for Basic configuration Description)33EA$0.0033
Components configured with a Usage Band 10 machine
Purchase of Removable Hard Drives option for usage band 10 machine.3EA$0.003
Purchase of Booklet Maker add-on to usage band 10 machine.10EA$0.0010
Purchase of Hole Punch add-on to usage band 10 machine.13EA$0.0013
Purchase of Folder add-on to usage band 10 machine.1EA$0.001
Purchase of LCDS/Sysout add-on to usage band 10 machine.4EA$0.004
Purchase of Perfect Bind add-on to usage band 10 machine.2EA$0.002
Total estimated Usage Band 10 equipment purchase with components.
(Carried over to clin 0003 on basic contract.)$0.00
E-4USAGE BAND 11

Typical Monthly Volume Range 800K to 1,200K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage Band 11 Machine, Basic Configuration
(see attachment 1b- [Configuration Options] for Basic configuration Description)9EA$0.009
Components configured with a Usage Band 11 machine
Purchase of Removable Hard Drives option for usage band 11 machine.2EA$0.002
Purchase of Booklet Maker add-on to usage band 11 machine.3EA$0.003
Purchase of Hole Punch add-on to usage band 11 machine.2EA$0.002
Purchase of Folder add-on to usage band 11 machine.0EA$0.000
Purchase of LCDS/Sysout add-on to usage band 11 machine.1EA$0.001
Purchase of Perfect Bind add-on to usage band 11 machine.1EA$0.001
Total estimated Usage Band 11 equipment purchase with components.
(Carried over to clin 0004 on basic contract.)$0.00
E-5USAGE BAND 12

Typical Monthly Volume Range 1,200K to 1,500K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage Band 12 Machine, Basic Configuration
(see attachment 1b- [Configuration Options] for Basic configuration Description)5EA$0.005
Components configured with a Usage Band 12 machine
Purchase of Removable Hard Drives option for usage band 12 machine.2EA$0.002
Purchase of Booklet Maker add-on to usage band 12 machine.1EA$0.001
Purchase of Hole Punch add-on to usage band 12 machine.1EA$0.001
Purchase of Folder add-on to usage band 12 machine.0EA$0.000
Purchase of LCDS/Sysout add-on to usage band 12 machine.1EA$0.001
Purchase of Perfect Bind add-on to usage band 12 machine.1EA$0.001
Total estimated Usage Band 12 equipment purchase with components.
(Carried over to clin 0005 on basic contract.)$0.00
E-6USAGE BAND 13

Typical Monthly Volume Range 1,500K to 2,500K per month See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage Band 13 Machine, Basic Configuration
(see attachment 1b- [Configuration Options] for Basic configuration Description)2EA$0.002
Components configured with a Usage Band 13 machine
Purchase of Removable Hard Drives option for usage band 13 machine.1EA$0.001
Purchase of Booklet Maker add-on to usage band 13 machine.1EA$0.001
Purchase of Hole Punch add-on to usage band 13 machine.1EA$0.001
Purchase of Folder add-on to usage band 13 machine.0EA$0.000
Purchase of LCDS/Sysout add-on to usage band 13 machine.1EA$0.001
Purchase of Perfect Bind add-on to usage band 13 machine.0EA$0.000
Total estimated Usage Band 13 equipment purchase with components.
(Carried over to clin 0006 on basic contract.)$0.00
Total Estimated Equipment Purchase with Components.$0.00
Additional Equipment /Software Purchase
E-7See attachment 1a- [Equipment Specification Requirements], for a description of requirements for the following items. Items are not tied to a specific usage band.
Flatbed Document Scanner32EA$0.0032
Non-Flatbed Document Scanner70EA$0.0070
DELL PC/Work Station (price includes equipment and next business day onsite maintenance for 5 years)102EA$0.00102
DELL PC/Work Station Removable Hard Drive Kit15EA$0.0015
Document Software - Adobe Acrobat Professional (per license fee)31EA$0.0031
Document Software - Adobe Creative Suite Standard 5 (per license fee)31EA$0.0031
Document Software - Enfocus PitStop Pro (per license fee)15EA$0.0015
Document Software - Quite Imposing (per license fee)15EA$0.0015
COTS Print MIS1EA$0.001
Total Estimated Additional Equipment/Software Purchase.
(Carried over to clin 0007 on Basic contract.)$0.00
Maintenance
M-1BASIC MAINTENANCE (8am-5pm, Mon-Fri).
(Includes All Consumable Supplies Except Paper)

(see attachment 1b- [Configuration Options] for Basic configuration Description)

Usage Band 8 Machinesmachines in serviceType only in tan column
Basic Maint., Basic configuration of Usage Band 8 machine.
100,000 pgs/month Allowance. (# of machines ( 32 ) x 12 mo) = Est. Quantity of Months.384MO$0.003234
Basic Maint., Basic configuration of Usage Band 8 machine.
300,000 pgs/month Allowance. (# of machines ( 2 ) x 12 mo) = Est. Quantity of Months.24MO$0.002
Total Estimated Usage Band 8 maintenance.$0.0034
Usage Band 9 Machinesmachines in service
Basic Maint., Basic configuration of Usage Band 9 machine.
300,000 pgs/month Allowance. (# of machines ( 15 ) x 12 mo) = Est. Quantity of Months.180MO$0.001517
Basic Maint., Basic configuration of Usage Band 9 machine.
500,000 pgs/month Allowance. (# of machines ( 2 ) x 12 mo) = Est. Quantity of Months.24MO$0.002
Total Estimated Usage Band 9 maintenance.$0.0017
Usage Band 10 Machinesmachines in service
Basic Maint., Basic configuration of Usage Band 10 machine.
500,000 pgs/month Allowance. (# of machines ( 29 ) x 12 mo) = Est. Quantity of Months.348MO$0.002933
Basic Maint., Basic configuration of Usage Band 10 machine.
800,000 pgs/month Allowance. (# of machines ( 4 ) x 12 mo) = Est. Quantity of Months.48MO$0.004
Total Estimated Usage Band 10 maintenance.$0.0033
Usage Band 11 Machinesmachines in service
Basic Maint., Basic configuration of Usage Band 11 machine.
800,000 pgs/month Allowance. (# of machines ( 7 ) x 12 mo) = Est. Quantity of Months.84MO$0.0079
Basic Maint., Basic configuration of Usage Band 11 machine.
1,200,000 pgs/month Allowance. (# of machines ( 2 ) x 12 mo) = Est. Quantity of Months.24MO$0.002
Total Estimated Usage Band 11 maintenance.$0.009
Usage Band 12 Machinesmachines in service
Basic Maint., Basic configuration of Usage Band 12 machine.
1,200,000 pgs/month Allowance. (# of machines ( 4 ) x 12 mo) = Est. Quantity of Months.48MO$0.0045
Basic Maint., Basic configuration of Usage Band 12 machine.
1,500,000 pgs/month Allowance. (# of machines ( 1 ) x 12 mo) = Est. Quantity of Months.12MO$0.001
Total Estimated Usage Band 12 maintenance purchase.$0.005
Usage Band 13 Machinesmachines in service
Basic Maint., Basic configuration of Usage Band 13 machine.
1,500,000 pgs/month Allowance. (# of machines ( 1 ) x 12 mo) = Est. Quantity of Months.12MO$0.0012
Basic Maint., Basic configuration of Usage Band 13 machine.
1,500,000 pgs/month Allowance. (# of machines ( 1 ) x 12 mo) = Est. Quantity of Months.12MO$0.001
Total Estimated Usage Band 13 maintenance purchase.$0.002
Total Estimated Basic Maintenance, all Usage Bands, all Machines. (Carried over to clin 0008 on Basic contract.)$0.00100
M-2Basic Maintenance; Additional Add-on Components
Enter a single monthly maintenance price for each component, if applicable.
Maintenance for Document Scanner
(Qty of components ( 102 ) x 12 months) = Estimated Quantity of Months.1,224MO$0.00102
Maintenance for Booklet Maker add-on.
(Qty of components ( 36 ) x 12 months) = Estimated Quantity of Months.432MO$0.0036
Maintenance for Hole Punch add-on.
(Qty of components ( 30 ) x 12 months) = Estimated Quantity of Months.360MO$0.0030
Maintenance for Folder add-on.
(Qty of components ( 4 ) x 12 months) = Estimated Quantity of Months.48MO$0.004
Maintenance for LCDS/Sysout add-on.
(Qty of components ( 14 ) x 12 months) = Estimated Quantity of Months.168MO$0.0014
Maintenance for Perfect Bind add-on.
(Qty of components ( 4 ) x 12 months) = Estimated Quantity of Months.48MO$0.004
Total Estimated Basic Maintenance, all additional add-on Components
(Carried over to clin 0009 on Basic contract.)$0.0088
Additional Software Maintenance
M-3See attachment 1a- [Equipment Specification Requirements], for a description of requirements for the following items. Items are not tied to a specific usage band.
Document Software - Adobe Acrobat Professional (per license fee)31YR$0.0031
Document Software - Adobe Creative Suite Standard 5 (per license fee)31YR$0.0031
Document Software - Enfocus PitStop Pro (per license fee)15YR$0.0015
Document Software - Quite Imposing (per license fee)15YR$0.0015
COTS Print MIS1YR$0.001
Total Estimated Additional Software Maintenance.
(Carried over to clin 0010 on Basic contract.)$0.00
M-4EXTENDED HOURS MAINTENANCE
Extended Hours Maintenance; Usage Band 8
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 8 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 8 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price for "EA" = a single (48hr) weekend unit, as needed, per UB 8 machine.15EA$0.00
Total Estimated Usage Band 8 Extended Hours maintenance.$0.00
Extended Hours Maintenance; Usage Band 9
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 9 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 9 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price for "EA" = a single (48hr) weekend unit, as needed, per UB 9 machine.15EA$0.00
Total Estimated Usage Band 9 Extended Hours maintenance.$0.00
Extended Hours Maintenance; Usage Band 10
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 10 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 10 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price for "EA" = a single (48hr) weekend unit, as needed, per UB 10 machine.15EA$0.00
Total Estimated Usage Band 10 Extended Hours maintenance.$0.00
Extended Hours Maintenance; Usage Band 11
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 11 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 11 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price for "EA" = a single (48hr) weekend unit, as needed, per UB 11 machine.15EA$0.00
Total Estimated Usage Band 11 Extended Hours maintenance.$0.00
Extended Hours Maintenance; Usage Band 12
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 12 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 12machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price for "EA" = a single (48hr) weekend unit, as needed, per UB 12 machine.15EA$0.00
Total Estimated Usage Band 12 Extended Hours maintenance.$0.00
Extended Hours Maintenance; Usage Band 13
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 13 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 13 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price for "EA" = a single (48hr) weekend unit, as needed, per UB 13 machine.15EA$0.00
Total Estimated Usage Band 13 Extended Hours maintenance.$0.00
Total Estimated Extended Hours Maintenance, all Usage Bands
(Carried over to clin 0011 on Basic contract.)$0.00
O-1Overage Click Charges

(see instructions tab for pricing instructions)

Usage Band 8
Overage click Charges for all Usage Band 8 machines, all Copy Allowances.
(Qty of machines ( 34 ) x Avg 50k/month x 12 months) = Estimated Quantity for the Year.20,400,000EA$0.0034
Usage Band 9
Overage click Charges for all Usage Band 9 machines, all Copy Allowances.
(Qty of machines ( 17 ) x Avg 50k/month x 12 months) = Estimated Quantity for the Year.10,200,000EA$0.0017
Usage Band 10
Overage click Charges for all Usage Band 10 machines, all Copy Allowances.
(Qty of machines ( 33 ) x Avg 75k/month x 12 months) = Estimated Quantity for the Year.29,700,000EA$0.0033
Usage Band 11
Overage click Charges for all Usage Band 11 machines, all Copy Allowances.
(Qty of machines ( 9 ) x Avg 75k/month x 12 months) = Estimated Quantity for the Year.8,100,000EA$0.009
Usage Band 12
Overage click Charges for all Usage Band 12 machines, all Copy Allowances.
(Qty of machines ( 5 ) x Avg 100k/month x 12 months) = Estimated Quantity for the Year.6,000,000EA$0.005
Usage Band 13
Overage click Charges for all Usage Band 13 machines, all Copy Allowances.
(Qty of machines ( 2 ) x Avg 100k/month x 12 months) = Estimated Quantity for the Year.2,400,000EA$0.002
Total Estimated Overage Click Charges, all Usage Bands
(Carried over to clin 0012 on Basic contract.)$0.00100
R-1Removal Charges

(see instructions tab for pricing instructions)

Usage Band 8
Removal Charges for all Usage Band 8 machines.34EA$0.00
Usage Band 9
Removal Charges for all Usage Band 9 machines.17EA$0.00
Usage Band 10
Removal Charges for all Usage Band 10 machines.33EA$0.00
Usage Band 11
Removal Charges for all Usage Band 11 machines.9EA$0.00
Usage Band 12
Removal Charges for all Usage Band 12 machines.5EA$0.00
Usage Band 13
Removal Charges for all Usage Band 13 machines.2EA$0.00
Total Estimated Removal Charges, all Usage Bands
(Carried over to clin 0013 on Basic contract.)$0.00

&LSchedule of Supplies/Services&RPage &Pof &N

&LSA4705-10-R-0130&R&D

Months 13-24 Matrix

(DRAFT) PRICE MATRIX
Ref.DescriptionEstimated QuantityU/IUnit PriceEstimated

Total Price

Ordering Period - Months 13-24
Equipment Purchase
E-1USAGE BAND 8

Typical Monthly Volume Range 100K to 300K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage Band 8 Machine, Basic Configuration
(see attachment 1b- [Configuration Options] for Basic configuration Description)23EA$0.0057
Components configured with a Usage Band 8 machine
Purchase of Removable Hard Drives option for usage band 8 machine.2EA$0.005
Purchase of Booklet Maker add-on to usage band 8 machine.10EA$0.0025
Purchase of Hole Punch add-on to usage band 8 machine.5EA$0.0013
Purchase of Folder add-on to usage band 8 machine.2EA$0.004
Purchase of LCDS/Sysout add-on to usage band 8 machine.2EA$0.005
Purchase of Perfect Bind add-on to usage band 8 machine.0EA$0.000
Total estimated Usage Band 8 equipment purchase with components.
(Carried over to clin 0001 on basic contract.)$0.00
E-2USAGE BAND 9

Typical Monthly Volume Range 300K to 500K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage Band 9 Machine, Basic Configuration
(see attachment 1b- [Configuration Options] for Basic configuration Description)11EA$0.0028
Components configured with a Usage Band 9 machine

(see attachment 1b- [Configuration Specifications] for a list of possible configurations)

Purchase of Removable Hard Drives option for usage band 9 machine.2EA$0.004
Purchase of Booklet Maker add-on to usage band 9 machine.5EA$0.0011
Purchase of Hole Punch add-on to usage band 9 machine.3EA$0.008
Purchase of Folder add-on to usage band 9 machine.1EA$0.002
Purchase of LCDS/Sysout add-on to usage band 9 machine.3EA$0.007
Purchase of Perfect Bind add-on to usage band 9 machine.0EA$0.000
Total estimated Usage Band 9 equipment purchase with components.
(Carried over to clin 0002 on basic contract.)$0.00
E-3USAGE BAND 10

Typical Monthly Volume Range 500K to 800K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage Band 10 Machine, Basic Configuration
(see attachment 1b- [Configuration Options] for Basic configuration Description)22EA$0.0055
Components configured with a Usage Band 10 machine
Purchase of Removable Hard Drives option for usage band 10 machine.2EA$0.005
Purchase of Booklet Maker add-on to usage band 10 machine.7EA$0.0017
Purchase of Hole Punch add-on to usage band 10 machine.9EA$0.0022
Purchase of Folder add-on to usage band 10 machine.1EA$0.002
Purchase of LCDS/Sysout add-on to usage band 10 machine.3EA$0.007
Purchase of Perfect Bind add-on to usage band 10 machine.1EA$0.003
Total estimated Usage Band 10 equipment purchase with components.
(Carried over to clin 0003 on basic contract.)$0.00
E-4USAGE BAND 11

Typical Monthly Volume Range 800K to 1,200K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage Band 11 Machine, Basic Configuration
(see attachment 1b- [Configuration Options] for Basic configuration Description)6EA$0.0015
Components configured with a Usage Band 11 machine
Purchase of Removable Hard Drives option for usage band 11 machine.2EA$0.004
Purchase of Booklet Maker add-on to usage band 11 machine.2EA$0.005
Purchase of Hole Punch add-on to usage band 11 machine.2EA$0.004
Purchase of Folder add-on to usage band 11 machine.0EA$0.000
Purchase of LCDS/Sysout add-on to usage band 11 machine.1EA$0.002
Purchase of Perfect Bind add-on to usage band 11 machine.1EA$0.002
Total estimated Usage Band 11 equipment purchase with components.
(Carried over to clin 0004 on basic contract.)$0.00
E-5USAGE BAND 12

Typical Monthly Volume Range 1,200K to 1,500K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage Band 12 Machine, Basic Configuration
(see attachment 1b- [Configuration Options] for Basic configuration Description)3EA$0.008
Components configured with a Usage Band 12 machine
Purchase of Removable Hard Drives option for usage band 12 machine.1EA$0.003
Purchase of Booklet Maker add-on to usage band 12 machine.1EA$0.002
Purchase of Hole Punch add-on to usage band 12 machine.1EA$0.002
Purchase of Folder add-on to usage band 12 machine.0EA$0.000
Purchase of LCDS/Sysout add-on to usage band 12 machine.1EA$0.002
Purchase of Perfect Bind add-on to usage band 12 machine.1EA$0.002
Total estimated Usage Band 12 equipment purchase with components.
(Carried over to clin 0005 on basic contract.)$0.00
E-6USAGE BAND 13

Typical Monthly Volume Range 1,500K to 2,500K per month See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage Band 13 Machine, Basic Configuration
(see attachment 1b- [Configuration Options] for Basic configuration Description)1EA$0.003
Components configured with a Usage Band 13 machine
Purchase of Removable Hard Drives option for usage band 13 machine.1EA$0.002
Purchase of Booklet Maker add-on to usage band 13 machine.1EA$0.002
Purchase of Hole Punch add-on to usage band 13 machine.1EA$0.002
Purchase of Folder add-on to usage band 13 machine.0EA$0.000
Purchase of LCDS/Sysout add-on to usage band 13 machine.0EA$0.001
Purchase of Perfect Bind add-on to usage band 13 machine.0EA$0.000
Total estimated Usage Band 13 equipment purchase with components.
(Carried over to clin 0006 on basic contract.)$0.00
Total Estimated Equipment Purchase with Components.$0.00
Additional Equipment /Software Purchase
E-7See attachment 1a- [Equipment Specification Requirements], for a description of requirements for the following items. Items are not tied to a specific usage band.
Flatbed Document Scanner7EA$0.0039
Non-Flatbed Document Scanner11EA$0.0081
DELL PC/Work Station (price includes equipment and next business day onsite maintenance for 5 years)18EA$0.00120
DELL PC/Work Station Removable Hard Drive Kit10EA$0.0025
Document Software - Adobe Acrobat Professional (per license fee)6EA$0.0037
Document Software - Adobe Creative Suite Standard 5 (per license fee)6EA$0.0037
Document Software - Enfocus PitStop Pro (per license fee)3EA$0.0018
Document Software - Quite Imposing (per license fee)3EA$0.0018
COTS Print MIS0EA$0.001
Total Estimated Additional Equipment/Software Purchase.
(Carried over to clin 0007 on Basic contract.)$0.00
Maintenance
M-1BASIC MAINTENANCE (8am-5pm, Mon-Fri).Type only in tan column
(Includes All Consumable Supplies Except Paper)

(see attachment 1b- [Configuration Options] for Basic configuration Description)

Usage Band 8 MachinesCum. # machines in svccurrent buy break downcurrent buy total
Basic Maint., Basic configuration of Usage Band 8 machine.
100,000 pgs/month Allowance. (# of machines ( 51 ) x 12 mo) = Est. Quantity of Months.612EA$0.00511923
Basic Maint., Basic configuration of Usage Band 8 machine.
300,000 pgs/month Allowance. (# of machines ( 6 ) x 12 mo) = Est. Quantity of Months.72EA$0.0064
Total Estimated Usage Band 8 maintenance.$0.0057
Usage Band 9 Machinesmachines in service
Basic Maint., Basic configuration of Usage Band 9 machine.
300,000 pgs/month Allowance. (# of machines ( 24 ) x 12 mo) = Est. Quantity of Months.288EA$0.0024911
Basic Maint., Basic configuration of Usage Band 9 machine.
500,000 pgs/month Allowance. (# of machines ( 4 ) x 12 mo) = Est. Quantity of Months.48EA$0.0042
Total Estimated Usage Band 9 maintenance.$0.0028
Usage Band 10 Machinesmachines in service
Basic Maint., Basic configuration of Usage Band 10 machine.
500,000 pgs/month Allowance. (# of machines ( 47 ) x 12 mo) = Est. Quantity of Months.564EA$0.00471822
Basic Maint., Basic configuration of Usage Band 10 machine.
800,000 pgs/month Allowance. (# of machines ( 8 ) x 12 mo) = Est. Quantity of Months.96EA$0.0084
Total Estimated Usage Band 10 maintenance.$0.0055
Usage Band 11 Machinesmachines in service
Basic Maint., Basic configuration of Usage Band 11 machine.
800,000 pgs/month Allowance. (# of machines ( 12 ) x 12 mo) = Est. Quantity of Months.144EA$0.001256
Basic Maint., Basic configuration of Usage Band 11 machine.
1,200,000 pgs/month Allowance. (# of machines ( 3 ) x 12 mo) = Est. Quantity of Months.36EA$0.0031
Total Estimated Usage Band 11 maintenance.$0.0015
Usage Band 12 Machinesmachines in service
Basic Maint., Basic configuration of Usage Band 12 machine.
1,200,000 pgs/month Allowance. (# of machines ( 6 ) x 12 mo) = Est. Quantity of Months.72EA$0.00623
Basic Maint., Basic configuration of Usage Band 12 machine.
1,500,000 pgs/month Allowance. (# of machines ( 2 ) x 12 mo) = Est. Quantity of Months.24EA$0.0021
Total Estimated Usage Band 12 maintenance purchase.$0.008
Usage Band 13 Machinesmachines in service
Basic Maint., Basic configuration of Usage Band 13 machine.
1,500,000 pgs/month Allowance. (# of machines ( 2 ) x 12 mo) = Est. Quantity of Months.24EA$0.00211
Basic Maint., Basic configuration of Usage Band 13 machine.
1,500,000 pgs/month Allowance. (# of machines ( 1 ) x 12 mo) = Est. Quantity of Months.12EA$0.0010
Total Estimated Usage Band 13 maintenance purchase.$0.003
Total Estimated Basic Maintenance, all Usage Bands, all Machines. (Carried over to clin 0008 on Basic contract.)$0.00166
M-2Basic Maintenance; Additional Add-on Components
Enter a single monthly maintenance price for each component, if applicable.
Maintenance for Document Scanner add-on.
(Qty of components ( 120 ) x 12 months) = Estimated Quantity of Months.1,440MO$0.00120
Maintenance for Booklet Maker add-on.
(Qty of components ( 62 ) x 12 months) = Estimated Quantity of Months.744EA$0.0062
Maintenance for Hole Punch add-on.
(Qty of components ( 51 ) x 12 months) = Estimated Quantity of Months.612EA$0.0051
Maintenance for Folder add-on.
(Qty of components ( 8 ) x 12 months) = Estimated Quantity of Months.96EA$0.008
Maintenance for LCDS/Sysout add-on.
(Qty of components ( 24 ) x 12 months) = Estimated Quantity of Months.288EA$0.0024
Maintenance for Perfect Bind add-on.
(Qty of components ( 7 ) x 12 months) = Estimated Quantity of Months.84EA$0.007
Total Estimated Basic Maintenance, all additional add-on Components
(Carried over to clin 0009 on Basic contract.)$0.00152
Additional Software Maintenance
M-3See attachment 1a- [Equipment Specification Requirements], for a description of requirements for the following items. Items are not tied to a specific usage band.
Document Software - Adobe Acrobat Professional (per license fee)37YR$0.0037
Document Software - Adobe Creative Suite Standard 5 (per license fee)37YR$0.0037
Document Software - Enfocus PitStop Pro (per license fee)18YR$0.0018
Document Software - Quite Imposing (per license fee)18YR$0.0018
COTS Print MIS1YR$0.001
Total Estimated Additional Software Maintenance.
(Carried over to clin 0010 on Basic contract.)$0.00
M-4EXTENDED HOURS MAINTENANCE
Extended Hours Maintenance; Usage Band 8
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 8 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 8 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price for "EA" = a single (48hr) weekend unit, as needed, per UB 8 machine.15EA$0.00
Total Estimated Usage Band 8 Extended Hours maintenance.$0.00
Extended Hours Maintenance; Usage Band 9
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 9 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 9 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price for "EA" = a single (48hr) weekend unit, as needed, per UB 9 machine.15EA$0.00
Total Estimated Usage Band 9 Extended Hours maintenance.$0.00
Extended Hours Maintenance; Usage Band 10
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 10 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 10 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price for "EA" = a single (48hr) weekend unit, as needed, per UB 10 machine.15EA$0.00
Total Estimated Usage Band 10 Extended Hours maintenance.$0.00
Extended Hours Maintenance; Usage Band 11
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 11 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 11 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price for "EA" = a single (48hr) weekend unit, as needed, per UB 11 machine.15EA$0.00
Total Estimated Usage Band 11 Extended Hours maintenance.$0.00
Extended Hours Maintenance; Usage Band 12
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 12 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 12machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price for "EA" = a single (48hr) weekend unit, as needed, per UB 12 machine.15EA$0.00
Total Estimated Usage Band 12 Extended Hours maintenance.$0.00
Extended Hours Maintenance; Usage Band 13
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 13 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 13 machine.15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price for "EA" = a single (48hr) weekend unit, as needed, per UB 13 machine.15EA$0.00
Total Estimated Usage Band 13 Extended Hours maintenance.$0.00
Total Estimated Extended Hours Maintenance, all Usage Bands
(Carried over to clin 0011 on Basic contract.)$0.00
O-1Overage Click Charges

(see instructions tab for pricing instructions)

Usage Band 8
Overage click Charges for all Usage Band 8 machines, all Copy Allowances.
(Qty of machines ( 57 ) x Avg 50k/month x 12 months) = Estimated Quantity for the Year.34,200,000EA$0.0057
Usage Band 9
Overage click Charges for all Usage Band 9 machines, all Copy Allowances.
(Qty of machines ( 28 ) x Avg 50k/month x 12 months) = Estimated Quantity for the Year.16,800,000EA$0.0028
Usage Band 10
Overage click Charges for all Usage Band 10 machines, all Copy Allowances.
(Qty of machines ( 55 ) x Avg 75k/month x 12 months) = Estimated Quantity for the Year.49,500,000EA$0.0055
Usage Band 11
Overage click Charges for all Usage Band 11 machines, all Copy Allowances.
(Qty of machines ( 15 ) x Avg 75k/month x 12 months) = Estimated Quantity for the Year.13,500,000EA$0.0015
Usage Band 12
Overage click Charges for all Usage Band 12 machines, all Copy Allowances.
(Qty of machines ( 8 ) x Avg 100k/month x 12 months) = Estimated Quantity for the Year.9,600,000EA$0.008
Usage Band 13
Overage click Charges for all Usage Band 13 machines, all Copy Allowances.
(Qty of machines ( 3 ) x Avg 100k/month x 12 months) = Estimated Quantity for the Year.3,600,000EA$0.003
Total Estimated Overage Click Charges, all Usage Bands
(Carried over to clin 0012 on Basic contract.)$0.00166
R-1Removal Charges

(see instructions tab for pricing instructions)

Usage Band 8
Removal Charges for all Usage Band 8 machines.23EA$0.00
Usage Band 9
Removal Charges for all Usage Band 9 machines.11EA$0.00
Usage Band 10
Removal Charges for all Usage Band 10 machines.22EA$0.00
Usage Band 11
Removal Charges for all Usage Band 11 machines.6EA$0.00
Usage Band 12
Removal Charges for all Usage Band 12 machines.3EA$0.00
Usage Band 13
Removal Charges for all Usage Band 13 machines.1EA$0.00
Total Estimated Removal Charges, all Usage Bands
(Carried over to clin 0013 on Basic contract.)$0.00

&LSchedule of Supplies/Services&RPage &Pof &N

&LSA4705-10-R-0130&R&D

Months 25-36 Matrix

(DRAFT) PRICE MATRIX
Ref.DescriptionEstimated QuantityU/IUnit PriceEstimated

Total Price

Ordering Period - Months 25-36
Equipment Purchase
E-1USAGE BAND 8

Typical Monthly Volume Range 100K to 300K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage Band 8 Machine, Basic Configuration
(see attachment 1b- [Configuration Options] for Basic configuration Description)23EA$0.0080
Components configured with a Usage Band 8 machine
Purchase of Removable Hard Drives option for usage band 8 machine.2EA$0.007
Purchase of Booklet Maker add-on to usage band 8 machine.10EA$0.0035
Purchase of Hole Punch add-on to usage band 8 machine.5EA$0.0018
Purchase of Folder add-on to usage band 8 machine.2EA$0.006
Purchase of LCDS/Sysout add-on to usage band 8 machine.2EA$0.007
Purchase of Perfect Bind add-on to usage band 8 machine.0EA$0.000
Total estimated Usage Band 8 equipment purchase with components.
(Carried over to clin 0001 on basic contract.)$0.00
E-2USAGE BAND 9

Typical Monthly Volume Range 300K to 500K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage Band 9 Machine, Basic Configuration
(see attachment 1b- [Configuration Options] for Basic configuration Description)11EA$0.0039
Components configured with a Usage Band 9 machine

(see attachment 1b- [Configuration Specifications] for a list of possible configurations)

Purchase of Removable Hard Drives option for usage band 9 machine.2EA$0.006
Purchase of Booklet Maker add-on to usage band 9 machine.5EA$0.0016
Purchase of Hole Punch add-on to usage band 9 machine.3EA$0.0011
Purchase of Folder add-on to usage band 9 machine.1EA$0.003

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .