This document is a Q&A extract related to the Stryton Mine Remediation contract opportunity issued by the Arkansas Department of Transformation and Shared Services Office of State Procurement (TSS OSP), the Department of Energy and Environment (ADEE), and the Division of Environmental Quality (ADEQ). The project consists of four stages - earthwork, topsoil, vegetation, and clean-up - to be completed within 270 days of contract award. Prospective contractors must attend a mandatory site visit, hold a current Arkansas contractor license, and have completed at least three similar projects within the past five years. The contract will be awarded to the responsive and responsible bidder with the lowest bid meeting the stated requirements and may be renewed for up to six additional one-year terms.

The pricing must be firm and not subject to escalation. Minority and women-owned businesses are encouraged to participate. The solicitation does not specify any set-aside designations or restrictions on the types of organizations that can respond, nor does it list any incumbent vendors or current contractors. The total award value is dependent on the bid pricing, which cannot exceed the available forfeited bond funds that are being used to finance the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question Number Question Subject Question Text Answers

1.00 Water Quality Testing Documentation

Are there any documents on recent water testing for strip pit water and reservoir?

No, last year's tests were in the 7.0 ph range

2.00 Discharge Permit

Is there a current discharge permit or did it expire with the former owner of Stryton Mine?

No, it expired in 2019.

3.00 Discharge

Is a discharge permit even required if the Prime is only transferring water on the property and that water is not leaving the property?

A discharge permit is not required but the awarded Contractor will need a construction storm water permit.

4.00 Water Discharge

Who needs to get the permit the current owner James Fork Regional Water District because they now own the property, or the Prime that is awarded the Bid?

The Contractor that is awarded the bid is responsible.

5.00 Water Discharge

Does the ditch have to be used or can Prime run a temporary hose lay?

It is the Contractor's responsibility to clean out and use the ditch. Please review the Revision in Section 2.7.G.

6.00 Water Discharge If the ditch has to be used can the ditch be cleaned out?

It is the Contractor's responsibility to clean out and use the ditch. Please review the Revision in Section 2.7.G.

7.00 Water Discharge Does the ditch need to be reclaimed after the project?

No. It is the Contractor's responsibility to clean out and use the ditch. Please review the Revision in Section 2.7.G.

8.00 Engineering

Are there construction drawings or plan sets available for the reclamation site?

Does the Department expect the creation of engineering and construction drawings before the commencement of construction operations?

No to both questions.

S000000371 Stryton Mine Reclamation Q&A

9.00 Materials

Can the Department confirm the amount of topsoil that is present in the stockpile? The Invitation For Bid form states there are 29,800 cy of topsoil while the topographic survey of the Stryton Pit states there are 412,063 cy of material in the stockpile.

Have soil quality tests been performed on the refuse pile? If so are the results of the test available?

What data is available for the water tests that have been completed previously?

The 29,800 cubic yards of topsoil was removed from the mining site and stockpiled before the mining began. This was done per mining regulations and codes. It is located away from the pit. The 412,063 cubic yards of overburden was removed from above the coal seam and stockpiled next to the pit. The overburden is not topsoil.

No soil quality tests have been performed. We have old inspections that show that the pH of the water is at acceptable levels.

10.00 Performance Standards

Will the performance standard dollar values be considered as a part of the low bid or an additional basis of award consideration?

Can performance standards be attached to the proposal?

No.

Performance Standards will be negotiated with the low bidder prior to award.

11.00 Performance Standards

Under Section 2.12 Performance Standards, paragraph B, there is mention of a Table A but no such table is present in the Invitation For Bid packet. Will this table be released at a later date or should the bidders include their own table form in their bid response?

Performance Standards will be negotiated with the low bidder prior to award.