S14 Attachment 3 Pricing Worksheet.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Digital Collateral (DCOL) eVault
Solicitation number
86615525R00001
Issued by

About this file

This document is a Pricing Worksheet for the Digital Collateral (DCOL) eVault solicitation (Solicitation #86615525R00001) issued by the Department of Housing and Urban Development. The worksheet provides instructions for offerors to submit pricing for the various line items associated with this firm-fixed price contract, including:

  • Project Management (base and option periods)
  • eVault services (base and option periods)
  • Transition-In and Transition-Out services

Offerors are required to provide labor categories, labor rates, and labor hours for each line item. The worksheet also requires offerors to submit subtotals for each period of performance and an overall total. Specific pricing instructions include providing escalation rates, discounts, and rounding to whole numbers. Offerors must submit both a PDF version and an editable Excel version of the completed worksheet with their price quotation.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing Worksheet Per Task LIN

Solicitation #86615525R00001
Price Worksheet - Instructions
1. The quoter shall provide labor categories, labor rates and labor hours for each Firm-Fixed Price LIN, consistent with their quoted solution.
2. The quoter shall provide completed Pricing Worksheet Per Task LIN and Labor Description worksheets (see the 2 tabs below).
3. The quoter shall price each LIN separately and check spreadsheet calculations.
4. The quoter shall submit both a PDF version and an editable Excel version of the 2 worksheets below (see 2 tabs below) with their Price Quotation.
5. The quoter shall provide a price for each LIN. If the quoter does not price a LIN then the Price Quotation shall indicate the reason why that LIN is not priced.
6. The quoter shall provide applicable escalation rate(s), discount(s) percentages for each LIN. If zero, the quoter shall enter "0%".
7. The quoter shall propose all pricing utilizing “Whole” numbers (for example: $5 in lieu of $5.25 or, $6 in lieu of $5.55).
8. The quoter shall provide subtotals for each period of performance and the overall total quoted.
Line ItemDescription (MUST ADD ROWS FOR EACH LABOR CATEGORY)Contract TypeQuoted Labor RateQuantity/Labor HoursTotal Dollar Amount ($) (Quoted Rate x Hours)Escalation Rate (%)Notes
00015.1 Project Management (12 Months)Firm-Fixed Price (FFP)
LIN 0001 Subtotal:
00025.2 eVault (12 Months)FFP
LIN 0002 Subtotal:
00035.3 Transition-In ServiceFFP
LIN 0003 Subtotal:

SUBTOTAL BASE PERIOD:

00045.1 Program Management Support (OPTION 1) (12 Months)Firm-Fixed Price (FFP)
LIN 000 Subtotal:
00055.2 eVault (12 Months) (OPTION 1) (12 Months)FFP
LIN 0005 Subtotal:

SUBTOTAL OPTION 1 PERIOD:

00065.1 Program Management Support (OPTION 2) (12 Months)FFP
LIN 0006 Subtotal:
00075.2 eVault (OPTION 2) (12 Months)FFP
LIN 0007 Subtotal:

SUBTOTAL OPTION 2 PERIOD:

00085.1 Program Management Support (OPTION 3) (12 Months)FFP
LIN 0008 Subtotal:
00095.2 eVault (OPTION 3) (12 Months)FFP
LIN 0009 Subtotal:

SUBTOTAL OPTION 3 PERIOD:

00105.1 Program Management Support (OPTION 4) (12 Months)FFP
LIN 0010 Subtotal:
00115.2 eVault (OPTION 4) (12 Months)FFP
LIN 0011 Subtotal:
00125.4 Transition Out Service (OPTION 4)FFP
LIN 0012 Subtotal:

SUBTOTAL OPTION 4 PERIOD:

TOTAL

Labor Descriptions Labor Category Position Title and Descriptions

1Title:
Description:
2Title:
Description:
3Title:
Description:

(add rows as needed)

File details come from the government source that posted it. Updated .