S1 Solicitation W90VN823R0051.pdf
PDF 2 MB Posted
- Solicitation number
- W90VN823R0051
About this file
This solicitation requests maintenance and repair services for automatic sliding doors in Camp Casey, South Korea. The Department of the Army Materiel Command Army Contracting Command is seeking these services for twenty-six automatic sliding doors across various buildings on the installation. The base period of performance is from February 2024 to January 2025, with four optional one-year extensions. Services include semi-annual inspections and preventive maintenance performed under firm-fixed-price CLINs, as well as on-call minor repairs and major repairs or replacements negotiated through requirement CLINs. Response time for on-call minor repairs is three hours during normal business hours and twenty-four hours for other times. The contractor must have experience maintaining automatic doors and comply with all installation security and safety requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
( No Col lect Cal ls )
W90VN823R0051 27-Sep-2023
b. TELEPHONE NUMBER
315-722-1384
8. OFFER DUE DATE/LOCAL TIME
11:00 AM 23 Oct 2023
5. SOLICITATION NUM BER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
( SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t . Use Only)
23.
CODE 10. TH IS ACQUISI TION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W90VN89. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAM E
MR. KIM, CHONG NAK
2. CONTRACT NO. 3 . AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLI CI TATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52. 212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRI ATION DATA
1. REQUISITION NUMBER
20.
ADDI TIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
0011971450
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52. 212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDI NG ANY ADDITI ONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO I TEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THI S DOCUMENT AND RETURN
% FOR:SET ASI DE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
411TH CONTRACTING SUPPORT BRI GADE, KOREA
RCO CASEY
UNIT#15289
APO AP 96224-6224
UNITED STATES
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W582LE 16. ADMINISTERED BY
12. DI SCOUNT TERMS11. DELIVERY FOR FOB DESTI NA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLIC ITATION
RFQ IFB RFPX
W1FD USA GARRISON RED CLOUD
W1FD USA GARRISON RED CLOUD
CAMP RED CLOUD
UIJ EONGBU 11770
TEL: 011-82-53-470-65 FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
332321
X
OFFER DATED
29. AW ARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWI SE IDENTIFI ED ABOVE AND ON ANY
COPI ES TO ISSUI NG OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN- OWNED
SM ALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF69
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEI VED INSPECTED
32b. SIGNATURE OF AUTHORI ZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATI VE
32e. MAILI NG ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORI ZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FI NALPARTIALCOMPLETE
36. PAY MENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHI P NUMBER
PARTI AL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAY MENT
41b. SIGNATURE AND TITLE OF CERTIFYI NG OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC 'D (YY/ MM/DD) 42d. TOTAL CONTAI NERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 52 Each Semi-annual Inspection & PM
FFP
Semi-annual Inspection and Preventive Maintenance for twenty-six (26) automatic sliding/swing doors in Cp Casey Enclave IAW Para 8.2 of PWS.
(Firm Fixed Price CLIN) Each = Job (One time service) Base Year: 1 February 2024 - 31 January 2025 FOB: Destination
PURCHASE REQUEST NUMBER: 0011971450
PSC CD: J056
NET AMT
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0002 10 Each On-call Minor Repair
FFP
Automatic Sliding/Swing Doors in Camp Casey IAW Para 8.3 of the PWS (Requirement Portion CLIN)
Base Year: 1 February 2024 - 31 January 2025 Each = Lot (One time service)
FOB: Destination
ESTIMATED
UNIT UNIT PRICE ESTIMATED AMOUNT
0003 12 Job Major Repair and Replacement Services
FFP
Major Repair and Replacement Services for automatic sliding doors in Camp Casey enclave IAW Para 8.4 of the PWS. NOTE: Total Estimated Amount is W26,400,000
"The Contractor shall NOT submit a price or amount for this CLIN. The Price will be negotiated per each Task Order".
(Requirement Portion CLIN) Each = Lot (One time service)
Base Year: 1 February 2024 - 31 January 2025
1001 52 Each OPTION Semi-annual Inspection & PM
FFP
Semi-annual Inspection and Preventive Maintenance for twenty-six (26) automatic sliding/swing doors in Cp Casey Enclave IAW Para 8.2 of PWS.
(Firm Fixed Price CLIN) Each = Job (One time service)
Base Year: 1 February 2025 - 31 January 2026
UNIT UNIT PRICE ESTIMATED AMOUNT
1002 10 Each OPTION On-call Minor Repair
FFP
Automatic Sliding/Swing Doors in Camp Casey IAW Para 8.3 of the PWS (Requirement Portion CLIN)
Base Year: 1 February 2025 - 31 January 2026 Each = Lot (One time service)
UNIT UNIT PRICE ESTIMATED AMOUNT
1003 12 Job OPTION Major Repair and Replacement Services
FFP
Major Repair and Replacement Services for automatic sliding doors in Camp Casey enclave IAW Para 8.4 of the PWS. NOTE: Total Estimated Amount is W27,060,000
Base Year: 1 February 2025 - 31 January 2026
2001 52 Each OPTION Semi-annual Inspection & PM
FFP
Semi-annual Inspection and Preventive Maintenance for twenty-six (26) automatic sliding/swing doors in Cp Casey Enclave IAW Para 8.2 of PWS.
(Firm Fixed Price CLIN) Each = Job (One time service) Base Year: 1 February 2026 - 31 January 2027
UNIT UNIT PRICE ESTIMATED AMOUNT
2002 10 Each OPTION On-call Minor Repair
FFP
Automatic Sliding/Swing Doors in Camp Casey IAW Para 8.3 of the PWS (Requirement Portion CLIN)
Base Year: 1 February 2026 - 31 January 2027 Each = Lot (One time service)
UNIT UNIT PRICE ESTIMATED AMOUNT
2003 12 Job OPTION Major Repair and Replacement Services
FFP
Major Repair and Replacement Services for automatic sliding doors in Camp Casey enclave IAW Para 8.4 of the PWS. NOTE: Total Estimated Amount is W27,720,000
Base Year: 1 February 2026 - 31 January 2027
3001 52 Each OPTION Semi-annual Inspection & PM
FFP
Semi-annual Inspection and Preventive Maintenance for twenty-six (26) automatic sliding/swing doors in Cp Casey Enclave IAW Para 8.2 of PWS.
(Firm Fixed Price CLIN) Each = Job (One time service) Base Year: 1 February 2027 - 31 January 2028
UNIT UNIT PRICE ESTIMATED AMOUNT
3002 10 Each OPTION On-call Minor Repair
FFP
Automatic Sliding/Swing Doors in Camp Casey IAW Para 8.3 of the PWS (Requirement Portion CLIN)
Base Year: 1 February 2027 - 31 January 2028 Each = Lot (One time service)
UNIT UNIT PRICE ESTIMATED AMOUNT
3003 12 Job OPTION Major Repair and Replacement Services
FFP
Major Repair and Replacement Services for automatic sliding doors in Camp Casey enclave IAW Para 8.4 of the PWS. NOTE: Total Estimated Amount is W28,380,000
Base Year: 1 February 2027 - 31 January 2028
4001 52 Each OPTION Semi-annual Inspection & PM
FFP
Semi-annual Inspection and Preventive Maintenance for twenty-six (26) automatic sliding/swing doors in Cp Casey Enclave IAW Para 8.2 of PWS.
(Firm Fixed Price CLIN) Each = Job (One time service) Base Year: 1 February 2028 - 31 January 2029
UNIT UNIT PRICE ESTIMATED AMOUNT
4002 10 Each OPTION On-call Minor Repair
FFP
Automatic Sliding/Swing Doors in Camp Casey IAW Para 8.3 of the PWS (Requirement Portion CLIN)
Base Year: 1 February 2028 - 31 January 2029 Each = Lot (One time service)
UNIT UNIT PRICE ESTIMATED AMOUNT
4003 12 Job OPTION Major Repair and Replacement Services
FFP
Major Repair and Replacement Services for automatic sliding doors in Camp Casey enclave IAW Para 8.4 of the PWS. NOTE: Total Estimated Amount is W29,040,000
Base Year: 1 February 2028 - 31 January 2029
PWS
Performance Work Statement (PWS)
Maintenance and Repair of Automatic Sliding Doors in Camp Casey enclave
Table of Contents
INTRODUCTION
1.1 Background
1.2 Objectives
1.3 Climatic Conditions
1.4 Facility Access
1.5 Traffic Flow
1.6 Drainage
1.7 Restoration of Landscape Damage
1.8 Dust Suppression
2.0 REQUIREMENTS
2.1 Description of Services
2.1.1 Non-Personal Services
General Information
2.1.3 Place of Performance and Hours of Operation
ROK legal Holidays
2.1.5 Travel/Temporary Duty
2.1.6 Emergency Services
2.1.7 Contract Administration and management
2.1.8 COR/ACOR Functions
2.1.9 Quality Control (QC)
2.1.10 Subcontract Management
2.1.11 Contractor Qualifications………………………………………….…………………….5
2.1.12. Contractor Employees
2.2 Work Management
2.3 As-Builts and Geospatial Information System (GIS)
2.4 Historic Property or Archaeological Site
2.5 Special Requirements
2.5.1 Security
2.5.2 Anti-Terrorism and Operations Security
2.5.3 Safety
2.5.4 Training, Physical Requirements, or other Expertise Required
2.5.5 Environmental Requirements
3.0 PERFORMANCE REQUIREMENTS AND STANDARDS
3.1 High Level Objectives (HLO)
3.1.1 Performance Task Requirements, Standards and Acceptable Quality Levels (AQLs)
3.2 Transition
3.3 Service Contract Reporting (SCR)..……….……………..…………………………..…….10
3.3.1 Reporting Labor Hours
4.0 Performance Requirements Summary (PRS) Matrix
1 Quality Control Plan (QCP)
5.0 COMMON LEVELS OF SERVICE (CLS)
6.0 DELIVERABLES
7.0 RELATED DOCUMENTS
7.1 Definitions and Acronyms
7.1.1 Definitions
7.1.2 Acronyms
7.2 Applicable Directives, Publications
7.3 Technical Exhibit (TE)
7.4 Government-Furnished Material (GFM)/Property (GFP)/Equipment (GFE)
7.4.1 Facilities ..……………………………………………….………………………………..19
7.4.2 Utilities
5 Contractor-Furnished Material (CFM)/Property (CFP)/Equipment (CFE) ……………..19
7.5.1 Contractor-Furnished Material and Responsibilities
7.5.2 Contractor-Furnished Items
7.5.3. Contractor Facilities
8.0 SPECIFIC TASKS
8.1 BASIC SERVICES…………………………………………………………………….…………19
8.2 ROUTINE INSPECTION AND PREVENTIVE MAINTENANCE (FIRM FIXED PRICE PORTION) …..20
8.3 ON-CALL MINOR REPAIR SERVICE (REQUIREMENT PORTION)………………………………20
8.4 MAJOR REPAIR AND REPLACEMENT SERVICES (REQUIREMENT PORTION) ..…….….……..21
W90VN823R0051
Introduction. This is a non-personal services contract to provide maintenance and repair services for automatic sliding doors in Camp Casey enclave. The Government is not exercising any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Background: To comply with ANSI/BHMA A156.10, American National Standard for Power Operated Pedestrian Doors, automatic sliding door need to be formally inspected and maintained every six months. Maintenance of automatic sliding door is required to make sure sliding door continues to operate with maximum reliability, safety and performance at Camp Casey enclave.
1.2 Objectives:
1.2.1 The Contractor shall ensure all work accomplished in the performance of this PWS meets all applicable Federal, State, and local laws, regulations, and directives to include listed publications in Section 7, Related Documents.
1.2.2 The objective of this contract is to provide complete and total preventive maintenance and repair on automatic sliding doors in Camp Casey enclave. Preventive maintenance includes regular cleaning, all inspections, testing, routine service, and maintenance. All Preventative Maintenance work not specifically mentioned, which is required to ensure that maintenance is complete and is within the intent of this contract, shall be performed without additional cost.
1.2.3 The Contractor shall prepare required reports, and submit all information as specified by the Deliverables presented in the contract. The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance conform to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract.
1.2.4 The intent is to establish work requirements that are performance-based and results-oriented. The Contractor shall determine the best and most cost-effective ways to fulfill maintenance and repair of the automatic sliding doors and their component needs, emphasizing innovation and commercial best practices.
1.3 Climatic Conditions. The average annual rainfall is 60 inches, with the wettest months being July – August. The average annual snowfall is 5 inches, with snowfall expected from December to February.
The average frost-free period (growing season) during the year is about 270 days. The first killing frost may be expected about December, and the last killing frost generally occurs in February. The average annual maximum and minimum temperatures are approximately 63 and 43 degrees Fahrenheit, respectively. Monthly average temperatures ranged from a low of 25 degrees in January to a high of 76 degrees in August. Summer temperatures often reach 86 degrees Fahrenheit, while sub-freezing weather is typical during the winter months.
1.4 Facility Access. N/A.
1.5 Traffic Flow. N/A.
1.6 Drainage. N/A.
1.7 Restoration of Landscape Damage. N/A.
1.8 Dust Suppression. N/A.
2.0 Requirements.
2.1 Description of Services. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, other items, and non-personal services necessary to provide preventive maintenance and repair services for the automatic sliding doors listed in the Technical Exhibit 1 (List of Automatic Sliding Doors) as defined in this Performance Work Statement (PWS).
2.1.1 Non-Personal Services. The personnel rendering the services are not subject, either by the contract's terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government in accordance with (IAW) Federal Acquisition Regulation (FAR) Subpart 37.104, under general contracting authority, and do not require specific statutory authorization.
2.1.2 General Information.
2.1.2.1 Period of Performance (PoP). The PoP shall be for one (1) Base Year of 12 months and four (4) 12 month option years. The Period of Performance reads as follows:
Base Period 1 February 2024 – 31 January 2025 Option Period I 1 February 2025 – 31 January 2026 Option Period II 1 February 2026 – 31 January 2027 Option Period III 1 February 2027 – 31 January 2028 Option Period IV 1 February 2028 – 31 January 2029
2.1.3 Place of Performance and Hours of Operation.
2.1.3.1 Place of Performance. The work under this contract will be performed at the locations listed in Technical Exhibit 1.
2.1.3.2 Hours of Operation. The Government's regular (normal) hours are from 0800 – 1700 hours Monday through Friday, except ROK legal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall conduct business during regular hours.
2.1.3.3 The Contractor shall maintain described contract performance hours. Work on Saturday or Sunday may only be done upon written approval from the COR or Contracting Officer (KO). The Contractor shall submit the request for approval NLT three (3) calendar days prior to the requested working date.
2.1.4 ROK legal Holidays.
(1) 1 and 2 January (New Year)
(2) 31 December, 1, and 2 January on the Lunar Calendar (Lunar New Year's Day)
(3) 1 March (Independence Movement Day)
(4) 1 May (Labor Day)
(5) 5 May (Children's Day)
(6) 8 April on the Lunar Calendar (Buddha's Birthday)
(7) 6 June (Memorial Day)
(8) 15 August (Liberation Day)
(9) 14, 15, and 16 August on the Lunar Calendar (Chu-Suk)
(10) 3 October (National Foundation Day)
(11) 9 October (Hangul Day)
(12) 25 December (Christmas Day)
2.1.4.1 Installation Closures. When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall:
a. Reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a legal public holiday, and when routine work is not scheduled for that day; or
b. Reschedule the work on any day mutually satisfactory.
2.1.4.2 Inclement Weather Delay. If the Contractor determines unsafe weather conditions for continued operations, the Contractor shall notify the COR if inclement weather suspends operations within (2) hours. The Contractor shall resume operations with COR approval.
2.1.5 Travel/Temporary Duty. N/A.
2.1.6 Emergency Services.
2.1.6.1 The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the KO or COR/ACOR immediately, not later than (NLT) two (2) hours of the incident.
2.1.6.2 The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel.
2.1.7 Contract Administration and management.
2.1.7.1 Post Award Conference/Performance Evaluation Meeting. The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office per Federal Acquisition Regulation Subpart 42.5, Post Award Orientation. The KO, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings, the KO, COR, or Designated Representative will apprise the Contractor of how the Government views the Contractor's performance. The Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.
These meetings shall be at no additional cost to the Government.
2.1.7.2 Notwithstanding the Contractor's responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.
2.1.7.3 The following provides the roles and their respective authority during the performance of the contract:
2.1.7.3.1 Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract. Notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO. In the event the Contractor makes any change at the direction of any person other than the KO, the change shall be considered to have been made without authority and solely at the risk of the Contractor. All contract administration will be effected by the KO.
Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes in or deviation from the terms and conditions shall be affected without a written modification to the contract, executed by the KO authorizing such changes. The KO will approve all submittals and plans required in this PWS.
2.1.7.3.2 Contracting Officer's Representative (COR). The KO will appoint a COR during the performance of this contract. Additional Government personnel may be assigned to assist in contract oversight IAW AR 70-13, Management and Oversight of Service Acquisitions. Other surveillance personnel may be designated as COR or ACOR, and shall be trained and appointed IAW DoDI 5000.72, DoD Standard for Contracting Officer's Representative (COR) Certification, and DFARS 201.602-2. The ACOR will serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR training, experience requirements and are appointed by the KO as an ACOR. The COR/ACOR will assist in identifying and resolving problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR/ACOR will perform IAW the responsibilities and duties identified in the appointment letter.
2.1.7.3.2.1 COR Authority. A letter of designation will be issued to the COR/ACOR by the KO. A copy of the letter will be sent to the Contractor. The letter of designation states the responsibilities and limitations of the COR/ACOR, especially with regard to changes in cost, price estimates, or changes in delivery dates. The COR/ACOR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order.
2.1.7.3.3 The Contractor shall not in any way represent the United States (U.S.) Government, or that it has the authority to contract or procure supplies for the account of the United States of America (USA).
2.1.8 COR/ACOR Functions. The COR/ACOR monitors all technical aspects of the contract and assists in contract administration. The COR/ACOR is authorized to perform the following functions: assure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements;
monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government-Furnished Property, and coordinate site entry of Contractor personnel.
2.1.9 Quality Control (QC). Quality Control is the responsibility of the Contractor. The Contractor shall develop, maintain, and submit a Quality Control Plan (QCP) to the KO for acceptance within fourteen (14) calendar days after the contract is awarded. Changes to the Contractor's QCP shall be submitted to the KO for review and approval within five (5) business days prior to implementation.
2.1.10 Subcontract Management. Suppose the Contractor subcontracts all or part of the work to be executed within this contract. In that case, the prime Contractor has total responsibility for the subcontractor's performance, and the U.S Government will not supervise the subcontractor. The contract is between the Prime Contractor and the U.S Government and will be administered and executed as such.
2.1.10.1 No subcontract shall be made by the Contractor with any party who has been suspended, debarred, or is otherwise ineligible to obtain government contracts.
2.1.10.2 Two weeks prior to entering into any subcontract, the Contractor must submit the name of the proposed subcontractor in writing to the COR for submission to the KO for approval. The Contractor shall not be authorized to commence work until the KO has approved the request.
2.1.10.3 Subcontractor's employees: Approved subcontractors must submit a list of its employees to the COR prior to commencing work for the Contractor. No employee of a subcontractor shall be allowed entrance to USFK installation without such approval.
2.1.11 Contractor Qualifications:
2.1.11.1 The Contractor shall maintain a current and valid the business registration for the business item/category of “Maintenance and Repair of Automatic Sliding Doors (자동문 수리)” issued by the ROK
Government National Tax Service (국세청).
2.1.11.2 The Contractor shall maintain a current and valid the business license for “Metal window and door works (금속구조물 및 창호)” issued by the ROK Government. The license shall be kept current throughout the entire performance period.
2.1.11.3 The Contractor shall have a minimum two (2) years’ experience within last five (5) years for maintenance and repair services on automatic sliding doors. The experience of a subcontractor cannot be substituted for the prime Contractor’s experience.
2.1.12 Contractor Employees.
2.1.12.1 Contract Manager (CM):
2.1.12.1.1 The Contractor shall provide a qualified CM who shall be responsible for the overall performance of the work and be given authority to make on-site decisions on behalf of the Contractor on contract matters. The CM shall have not less than two (2) years of experience as a CM within the last five
(5) years for construction or maintenance and repair services on automatic sliding doors. The CM must be able to read, write, speak and understand English. The CM must be present in the offeror's company and submit the CM resume with contract proposal.
2.1.12.1.2 The CM or designated representative shall be available during normal duty hours (0800 – 1700) to respond within three (3) hours for Camp Casey enclave to meet on the installation with COR to discuss problem areas.
2.1.12.2 Contractor Identification. The Contractor shall ensure all personnel be identified as a Contractor to distinguish themselves by wearing appropriate uniforms or badges that contain the company name and employee's name. Such uniform or badges shall be furnished and controlled by the Contractor. All of the Contractor's employees shall be required to display identification uniforms or badges at all times during the performance of work under this contract.
2.1.12.3 Standards of Conduct. Contractor personnel's conduct shall not reflect discredit upon the Government. The Contractor shall ensure all personnel present a professional appearance while working on the Government installation. The Contractor's employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substances. The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove from the job site any employee for reasons of misconduct or security. The Contractor shall ensure employee conduct complies with 41 USC 423, Procurement Integrity. The Contractor shall also ensure that no Contractor employees conduct political-related activities or events on the installation.
2.1.12.4 Contractor Hiring Restrictions. The Contractor shall not hire or sub-contract with off-duty or former Government employees whose employment would result in a conflict with AR 600-50, Standards of Conduct.
2.1.12.5 Organizational Conflict of Interest (OCI). Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.), or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and promptly submit a plan to the KO to avoid or mitigate any such OCI. The Contractor's mitigation plan will be determined to be accepted solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequently contracted requirements which may be affected by the OCI.
2.1.12.6 Business Relations. The Contractor shall successfully integrate and coordinate all activities needed to execute the requirement of this PWS. The Contractor shall manage the timeliness, completeness, and quality of problem identification to a degree acceptable to the Government. The Contractor shall provide to the COR/ACOR corrective action plans, timely identification of issues, and effective management of subcontractors within 10 days or at a mutually agreed upon date. The Contractor shall ensure customer satisfaction and professional and ethical behavior of all Contractor personnel.
2.2 Work Management: The Contractor shall schedule and coordinate with the COR/ACOR to minimize disruptions to the facility mission.
2.3 As-Builts and Geospatial Information System (GIS). N/A.
2.4 Historic Property or Archaeological Site. N/A.
2.5 Special Requirements.
2.5.1 Security.
2.5.1.1 Access and General Protection/Security Policy and Procedures. The Contractor and all associated subcontractors' employees shall comply with applicable installation, facility, and local security policies and procedures. The Contractor workforce shall comply with all personal identity verification (PIV) requirements as directed by the Department of Defense (DOD), Headquarters Department of the Army (HQDA), and local policy. The COR/ACOR will request changes in Contractor security matters or processes if the Force Protection Condition (FPCON) at any individual facility or installation changes.
2.5.1.2 Motor Vehicle Operators. Contractor's personnel, whose tasks involve operating any vehicles, shall possess a valid driver's license, certificates, and permits applicable for the type and class of vehicle being operated.
2.5.1.3 Contractor Vehicle Registration. The Contractor shall register all Contractor-owned or operated vehicles and trailers operating on the installation within 10 working days of contract start date. The Contractor shall complete all applications with the Provost Marshal Vehicle Registration section in Building S-2533 at Camp Casey. Evidence of vehicle ownership and vehicle liability insurance must be presented upon application of vehicle registration.
2.5.1.4 The Contractor shall provide all information required for background checks to meet installation access requirements, to be accomplished by the installation Provost Marshall Office, Director of Emergency Services.
2.5.1.5 Physical Security. The Contractor shall be responsible for safeguarding all Government equipment, information, and property provided for contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured. Contractor employees shall not allow any individuals entry into the facilities before or after operational hours.
2.5.2 Anti-Terrorism and Operations Security.
2.5.2.1 AT LEVEL I TRAINING: The contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas shall complete AT Level I awareness training within 30 calendar days after the contract start date or the effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 5 calendar days after completion of Training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil
2.5.2.2 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES: The Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition
(FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
2.5.2.2.1 For contractors that do not require CAC, but require access to a DoD facility or installation.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with the status of forces agreements and other theater regulations.
2.5.2.3 iWATCH TRAINING: The Contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed Training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This Training shall be completed within 30 calendar days of contract award and within 14 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
2.5.2.4 Requirement for OPSEC Training: Per AR 530-1, Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
2.5.3 Safety. The Contractor shall safeguard and maintain all Government and Contractor property and provide for the safety and well-being of personnel employed under this contract. The Contractor shall comply with AR 385-10, The Army Safety Program.
2.5.3.1 Safety Plan. The Contractor shall develop and implement a safety program for its employees.
The Contractor shall submit the Safety Plan to the KO for review and acceptance within ten (10) days of commencement of work. Revisions shall be submitted five (5) calendar days prior to the effective date of change.
2.5.3.2 Occupational Safety and Health. The Contractor shall comply with the Occupational Safety and Health Administration (OSHA) standards. The Contractor shall comply with all applicable Federal, State, and local laws, regulations, and directives.
2.5.3.3 Accident investigations, reports, and logs: The safety plan shall include a copy of the Contractor's accident investigation reporting format, and logs. Report all accidents as soon as possible but not more than 30 minutes of accident occurrence to the Contracting Officer/Representative (KO/COR). The Contractor shall thoroughly investigate the accident and submit the investigation findings along with appropriate corrective actions to the KO/COR in the accident investigation reporting format as soon as possible but no later than five (5) working days following the accident. Implement corrective actions as soon as reasonably possible. The accident investigation reporting format shall include, at a minimum.
(1) Contract number and contract name/description
(2) Name of Contractor
(3) Date/Time of accident
(4) Date report was completed.
(5) Detail description of events that lead to the accident
(6) Root cause of accident
(7) Corrective action(s) to prevent recurrence.
2.5.3.4 The following require immediate accident notification and written accident report
(1) A fatality
(2) A permanent total or permanent partial disability
(3) The hospitalization of three or more people resulting from a single occurrence.
(4) Property damage of $200 or more
2.5.3.5 The Contractor shall immediately correct all safety deficiencies upon notification by the COR/Alternate Contracting Officer's Representative (ACOR)/ Quality Assurance Representative (QAR), and shall notify the COR of the corrective action to be taken.
2.5.4 Training, Physical Requirements, or other Expertise Required.
2.5.4.1 The Contractor shall ensure all Contractor's employees and associated subcontractors are certified or licensed, as appropriate in South Korea, in the specific areas required by the South Korean National, Provincial, Municipal, or local governmental organizations. The Contractor shall ensure employees are certified or licensed in the appropriate areas required. The Contractor shall ensure all required documentation of certification or licensure for Contractor personnel are filed with the COR/ACOR within twenty‐four (24) hours prior to employees commencing performance.
2.5.5 Environmental Requirements.
2.5.5.1 Green Procurement. N/A.
2.5.5.2 Reserved
2.5.5.3 Environmental Compliance. The Contractor shall comply with all Federal, State, local, and installation environmental laws, rules, plans, and policies. The Contractor shall use and store all materials, chemicals, and equipment used in the performance of services on the installation IAW with industry standards, local, State and Federal laws, and according to manufactures' recommendations.
The Contractor shall be financially responsible for all fines and associated costs for hazardous waste management, transportation, and disposal of waste due to the Contractor's non-compliance. The Contractor shall submit Safety Data Sheets (SDS) for approval on all materials, five (5) days before delivery of the material, to the COR/ACOR. Upon request from the COR/ACOR, the Contractor shall provide all required data to meet environmental-mandated reporting requirements (e.g., air emission data, hazardous material storage/usage, herbicide/pesticide usage, solid/hazardous waste generation). The Contractor shall provide data to meet reporting deadlines and during compliance inspections upon request from the COR/ACOR.
2.5.5.4 Spill Plan. N/A.
3.0 Performance Requirements and Standards.
3.1 High-Level Objectives (HLO).
3.1.1 Performance Task Requirements, Standards, and Acceptable Quality Levels (AQLs).
3.1.1.1 Damage Caused by Contractor. Damages caused by Contractor employees shall be repaired at no cost to the Government. The Contractor shall notify the COR/ACOR and return the damaged area to its previous condition. The Contractor shall furnish all labor, materials, and equipment to perform the repair work.
3.1.1.2 Damage Report. The Contractor shall submit a damage report to the COR/ACOR within thirty (30) calendar days that annotates the damage, corrective action, and date corrected.
3.2 Transition (Phase In/Phase Out). N/A.
3.3 Service Contract Reporting (SCR)
3.3.1 Reporting Labor Hours. The Contractor shall report all contract manpower (including subcontractor manpower) required for performance of this contract. The Contractor shall completely fill in all the information in the format using the following web address:
www.sam.gov
4.0 Performance Requirements Summary (PRS) Matrix: The Contractor service requirement are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement.
These thresholds are critical to mission success:
Performance Objective
Performance Standard Method of
Surveillance
AQL
Remedy of Failure
Para 8.2 Perform semi-annual inspection and preventive maintenance
Safety inspection, testing, maintenance and minor repair, cleaning and lubricating the equipment of all automatic sliding doors shall be performed in accordance with preventive maintenance check list as a semi-annual basis.
Random Inspection
100% Regulatory
Requirement
Reaccomplish within 24 hours of notification from the COR
Para 8.3 On-call Minor Repair
Repairs are made within specified timeframe
100% Inspection 100% Regulatory
Requirement
Reaccomplish within 24 hours of notification from the COR
Para 8.4 Major Repair
Repairs are made in performance of period
100% Inspection 100% Regulatory
Requirement
Reaccomplish within 24 hours of notification from the COR
Para 8.2.2 Submit a written inspection and maintenance schedule
The Contractor shall submit semi-annual inspection & maintenance schedule to the COR within 10 calendar days prior to performance commencement.
Review submitted work schedule
SAT 100% Resubmit revised schedule within 24 hours of notification from the COR
4.1 Quality Control Plan (QCP). Quality control is the responsibility of the Contractor. The Contractor shall develop, implement, and maintain an effective quality control program documented in a QCP to ensure services are performed IAW this PWS. The Contractor shall develop and implement procedures to identify and prevent the recurrence of defective services. The Contractor's QCP is how they assure themselves that the work conforms to contract requirements. The basic principle of the plan is that the Contractor is responsible for quality control. The QCP shall be constructed so that each CLS service can be extracted and used for that function only and not contain extraneous information. The Contractor's QCP shall include a separate section, which addresses the Contractor's method of managing quality of work. The QCP shall include a description of the inspection system to address services listed in this PWS, and a description of the methods to be used for identifying and preventing defects in the quality of services performed. The plan shall include a description of the Contractor's inspection system to include specifics as to areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the Contractor's inspectors. No lead person or first-line supervisor shall be considered a Quality Control Inspector. The Contractor shall develop, maintain, and submit a QCP to the COR for acceptance within fourteen (14) calendar days after the contract is awarded. The Contractor shall submit any proposed changes in the QCP to the COR for written approval five (5) working days prior to implementation.
5.0 Common Levels of Service (CLS).
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions of the Base Operations specified below. This shall be done IAW all the terms, conditions, general and special provisions, specifications, drawings, attachments, and exhibits contained herein or incorporated by reference.
The Contractor shall ensure that all work meets or exceeds the specifications for the listed CLS.
CLS Service Title Task 411 Facilities Maintenance - Vertical Paragraph 8.0 of the PWS
6.0 Deliverables.
DELIVERABLE FREQUENCY # OF COPIES MEDIUM/FORMAT DISTRIBUTION
#1.
PWS, Para 2.1.6.1.
Accident Requiring Emergency Medical Treatment
Immediate. Not later than two (2) hours after the incident
N/A Email or Telephone COR
#2.
PWS, Para 4.1.
Quality Control Plan
Initial: within fourteen
(14) calendar days of contract award
Updates: five (5) calendar days prior to implementation
2 Electronic Copies
One MS Word
One pdf with CM's signature
COR
#3.
PWS, Para 2.5.2.1.
AT Level I Training
Within thirty (30) calendar days after the contract start date
1 Electronic Copy pdf with CM's signature
COR
#4 PWS, Para 2.5.2.3.
iWATCH Training
Not later than thirty
(30) calendar days of contract award
1 Electronic Copy
.pdf with CM's signature
COR
#5 PWS, Para 2.5.2.4.
OPSEC Training
Not later than thirty
(30) calendar days of contract award
1 Electronic Copy
.pdf with CM's signature
COR
#6 PWS, Para 2.5.3.1.
Safety Plan
Initial: within ten (10) calendar days of commencement of work
Updates: five (5) calendar days prior to effective days of change
1 Electronic Copy
One MS Word
One pdf with CM's signature
COR
#7 PWS, Para 2.5.5.3.
Safety Data Sheets (SDS) for approval on all materials
Five (5) days before delivery of the material
1 Electronic Copy of each sheet
.pdf See FAR 52.223-3 Hazardous Material Identification and Material Safety Data
COR
#8 PWS, Para 3.1.1.2.
Damage Report
Within thirty (30) calendar days following the damage
1 Electronic Copy
.pdf with digital signature
COR
#9 PWS, Para 8.2.2.
Semi-annual Preventive Maintenance Schedule
Within ten (10) calendar days prior to performance commencement
1 Electronic Copy
One pdf with CM's signature, and Microsoft Excel
#10 PWS, Para 8.2.6.
Semi-annual Performance Report
Within ten (10) working days after completion
1 Electronic Copy
One pdf with CM's signature
7.0 Related Documents.
7.1 Definitions and Acronyms.
7.1.1 Definitions.
7.1.1.1 Acceptable Quality Level (AQL). The AQL is the maximum percent defective (or the number of defects per hundred units) for the purposes of sampling inspection can be considered satisfactory.
7.1.1.2 Alternate Contracting Officer's Representative (ACOR). An employee of the U.S. Government provided by the RA and appointed by the KO to provide support to CORs in monitoring and documenting the Contractor's performance. These alternate surveillance support personnel will serve as on-site representatives of the COR in the performance of actual contract surveillance if they meet all COR training, experience requirements and are appointed by the KO as an ACOR.
7.1.1.3 Contract Administrator (CA). The official Government representative delegated authority by the KO to administer a contract. This individual, normally working in an appropriate contracting or procurement career field, advises on all technical contractual matters.
7.1.1.4 Contract Discrepancy. A failure of the Contractor to perform IAW contract requirements and specifications, e.g., a failure of the Contractor to provide, or provide on time, the required contract products or services; or it may result because delivered products or services do not meet specific contract requirements.
7.1.1.5 Contract Discrepancy Report (CDR). A report used to document other than satisfactory Contractor performance. The CDR requires the Contractor to explain, in writing, why performance is other than satisfactory, how performance shall be returned to satisfactory levels, and how recurrence of the problem shall be prevented in the future.
7.1.1.6 Contractor. A supplier or vendor awarded a contract to provide specific supplies or services to the Government. The term used in this contract refers to the prime.
7.1.1.7 Contractor Acquired Property (CAP). Property acquired, fabricated, or otherwise provided by the Contractor for performing a contract, and the Contractor retains the title.
7.1.1.8 Contracting Officer (KO). A person with authority to enter into, administer, and or terminate contracts and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
7.1.1.9 Contracting Officer's Representative (COR). An employee of the U.S. Government appointed by the KO to help administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
7.1.1.10 Defective Service. A service output that does not meet the standard of performance associated with the PWS.
7.1.1.11 Deliverable. Anything that can be delivered; can include non-manufactured things, such as meeting minutes or reports.
7.1.1.12 Equipment. A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed to perform a contract. Equipment is not intended for sale and does not ordinarily lose its identity or become a part of another article when put into use. Equipment does not include material, real property, special test equipment, or special tooling.
7.1.1.13 Government-Furnished Property (GFP). Property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract.
Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes Contractor-acquired property if the Contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
7.1.1.14 Government Property. All property owned or leased by the Government. Government property includes both Government-furnished property and Government purchased Contractor-acquired property.
Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
7.1.1.15 Hazardous Material. Any item or chemical, which is a "health hazard", or "physical hazard", as reflected in Federal Standard (FED-STD) 313 Material Safety Data and Disposal Data for Hazardous Materials Furnished to Government Activities, defined in OSHA 29 CFR 1910, and pursuant to FAR
23.301 (Hazardous Materials) Definition. It also includes any other material designated by a Government COR/technical representative as potentially hazardous and requiring safety controls (e.g., pesticides, fertilizers).
7.1.1.16 Key Personnel. Contractor personnel are evaluated in a source selection process and are used in the performance of a contract. When key personnel is used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons who are listed in the proposal. The Prime Contractor is responsible for the performance of all subcontractors.
7.1.1.17 Loss of Government Property. Unintended, unforeseen or accidental loss, damage, or destruction of Government property that reduces the Government's expected economic benefits of the property. Loss of Government property does not include purposeful destructive testing, obsolescence, normal wear, and tear, or manufacturing defects. Loss of Government property includes, but is not limited to:
a. Items that cannot be found after a reasonable search,
b. Theft,
c. Damage resulting in unexpected harm to property requiring repair to restore the item to usable condition, or
d. Destruction resulting from incidents that render the item useless for…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .