S07 - Bid Log - Gainesville.pdf
PDF 237 KB Posted
- Attached to
- Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC
- Solicitation number
- 36C77626B0026
About this file
This is an Abstract of Offers - Construction (Optional Form 1419), a federal contracting document documenting all bids received for a construction project. The solicitation number is 36C77626B0026, issued on 07/15/2026 and opened on 09/24/2026. The issuing office is the Department of Veterans Affairs Program Contracting Activity Central (PCAC) located in Independence, Ohio, with Contracting Officer Donald A. Mars III overseeing the procurement.
The project is titled "EHRM Infrastructure Upgrades and Data Center Construction - Gainesville" and the solicitation included ten amendments. The government estimate was based on a reasonable contract including profit methodology. Nine bids were received for the base bid item, with unit prices ranging from approximately $29.58 million to $37.28 million. The lowest bid was submitted by Venergy Group at $29,576,010.00, while the highest was submitted by P and J Tyler Lane JV at $37,284,000.00. All offerors submitted bid bonds for 20% of their bid amounts and acknowledged receipt of all amendments. Bids were received from CDEEM Co, Birmingham Industrial Construction, RWH Energy, Venergy Group, Povolny Group Inc., Blueway One JV LLC, Talion Construction LLC, and P and J Tyler Lane JV.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S07 - Special Notice - Bid Log.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
Department of Veterans Affairs Program Contracting Activity Central (PCAC) 6100 Oak Tree Blvd, Suite 490 Independence OH 44131
EHRM Infrastructure Upgrades and Data Center Construction - Gainesville
0001 Base Bid JB1 33,673,330.00 33,673,330.00 35,960,181.0035,960,181.00 34,704,354.00 34,704,354.00
Ten (10) Amendments
36C77626B0026 1 3
Contracting Officer, Donald A. Marsh III
CDEEM Co Birmingham Industrial Construction
Bid Bond 20% Bid Bond 20%
Yes Yes
09/24/202607/15/2026
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
36C77626B0026
EHRM Infrastructure Upgrades and Data Center Construction - Gainesville
Bid Bond 20% Bid Bond 20% Bid Bond 20% Bid Bond 20%
Yes Yes Yes Yes
1 1 JB 29,800,777 29,800,777 29,576,010 29,576,010 32,484,076 32,484,076 31,993,000 31,993,000
2 3
3 4 5 6
RWH Energy Venergy Group Povolny Group Inc. Blueway One JV LLC
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
36C77626B0026
EHRM Infrastructure Upgrades and Data Center Construction - Gainesville
Bid Bond 20% Bid Bond 20%
Yes Yes
1 1 JB 30,055,152 30,055,152 37,284,000 37,284,000
3 3
7 8 9 10
Talion Construction LLC P and J Tyler Lane JV
| 2026-09-24T15:05:46-0400 | |
| DONALD MARSH |
File details come from the government source that posted it. Updated .